OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.

Slides:



Advertisements
Similar presentations
Best Value Pre-selection and Procurement
Advertisements

Managing a Successful Mechanical System project Following design – what next?
GPA Renewable Energy Resource for Guam Power Authority
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Replacing our Parking Access and Revenue Control System – All 100 Lanes!
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Network Design and Implementation
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
The New Software Accounting Rules-GASB 51
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
3.08a Establish specifications for selecting hardware/software systems.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
Genesis Solar Module Brochure ™
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Strategic Purchasing Division Operation Contracts Cost Reduction Friday March 13, 2009 Presented by Calvin D. Wells, Deputy Director Strategic Purchasing.
Mississippi Department of Education Office of Child Nutrition Request for Proposal No Child Nutrition Management System.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
1 ITEC 3010 “Systems Analysis and Design, I” LECTURE 8-1: Evaluating Alternatives for Requirements, Environments, and Implementation Evaluating Alternatives.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.
1 Chapter 1 Introduction to Accounting Information Systems Chapter 17 System Selection and System Design.
State Purchasing – DTS SOLICITATION AND CONTRACTS PROCESS BACKGROUND AND HIGHLIGHTS 10/21/2015 Complement to the State Purchasing – DTS Solicitation and.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
O NLINE VS. R ETAIL W HEN B UYING A C OMPUTER BY G EORGIA B ULLDOGS 3.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Chapter 12 The Network Development Life Cycle
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
EASTERN MUNICIPAL WATER DISTRICT Human Resources & Payroll Replacement Project Laura Zamora Human Resources Manager March 18,
The Contract Management Process Contract Formation.
Doing Business With the U of I Facilities and Services Construction Division Overview of Construction Programs and Contracting Processes Gary Biehl, Assoc.
State Purchasing – DTS SOLICITATION AND CONTRACTS PROCESS Background and Highlights 3/17/16 Complement to the State Purchasing – DTS Solicitation and Contracts.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Demand Response Software and Hardware
Systems Analysis and Design in a Changing World, Fifth Edition
Award Management Services
Needs Analysis & Alternative IT investment strategies Pertemuan 3-4
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Enterprise Content Management Owners Representative Contract Approval
PRE-PROPOSAL MEETING, January 16, 2018 Contract No.:
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
Improvement in Project Delivery
MANDATORY PRE-BID MEETING
Request for Proposal and Selection Procedures
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
John Williams | Senior Procurement Specialist
Specifications What should it cover Goods Services Warranty
Preparing the Proposal
Presentation transcript:

OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting

Introduction and Overview Existing Turnpike System Turnpike Extensions –Creek ExtensionsCreek Extensions –H.E. Bailey and John KilpatrickH.E. Bailey and John Kilpatrick

Project Objectives Turnpike Extension Equipment Existing System Upgrade and Replacement Host and PikePass System Replacement Integration Enhancements

Project Alternatives New ETC System Procurement New VES Procurement Parking Facility and Integration Support

Procurement Structure “Best Value” Evaluation Technical Evaluation Criteria Price Evaluation

Contract Structure Turnkey Purchase - Design, Install, Test and Warranty Implementation ETC System Conversion Maintenance

Scope of Work New Lanes - All Equipment Existing Lanes - New Equipment & Related Plaza/CPS Computers Interface to Existing and New Software Lane, Plaza, CPS, MOMS and PikePass Software by Contractor Maintenance of Entire System Refurbishment and Replacement of Tags

Schedule Procurement Design Implementation - Turnpike Extensions Implementation - Existing System Implementation - New ETC and CPS

Technical Proposal Outline Required Forms and Signatures How to Highlight Alternatives

Price Proposal Proposal Bond Evidence of Capacity for Performance Bond Payment Forms

THE END Schedule Site Visits Q&A Period - Final Questions Due July 6, 1999 Proposals Due July 26,1999 at 4:00pm