2014 WATER LEGISLATION John Harrington, ACOG March 27, 2014.

Slides:



Advertisements
Similar presentations
CHERYL E. BRADLEY RULES AND PLANNING SECTION AIR QUALITY DIVISION JANUARY 15, 2014 Impact of Executive Order on Rulemaking Process.
Advertisements

Clean Water Act National Act; Drafted in 1972; Amended in 1977, 1981, and 1987 Originally an amendment to the Water Pollution Control Act.
Drought Planning and Response Linwood Peele Linwood Peele Water Supply Planning Section Water Supply Planning Section NCDENR - Division of Water Resources.
Recent Utah Legislation Affecting Wastewater Reuse Water Environment Association of Utah Annual Conference March 30, 2006 Jerry Olds State Engineer.
©Lloyd Gosselink Rochelle & Townsend, P.C. Presented by: LAUREN KALISEK (512) Congress Avenue Suite 1900 Austin, Texas.
Shoreline Master Program Update. Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
Preliminary 2040 OCARTS County and City Population Figures.
Status of the WET Program William Telliard Director, Analytical Methods USEPA Office of Science & Technology Office of Water.
Update On 2000 Bureau of State Audits Report Item L; March 10, 2003 Permitting & Enforcement Committee Item J; March 12, 2003 Budget & Administration Committee.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Grays Harbor County Shoreline Master Program Update Our Heritage, Our Future Grays Harbor Master Builders January 9, 2012.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Update on Wyoming Draft 303(d) List and Changes to Watershed Planning.
Regional Stormwater Management Coordinating Council Meeting Summary of May 13 th Meeting Summary of May 13 th Meeting Regulatory Updates Regulatory Updates.
1 GRIC TAS Development Process Dan Blair Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
John Harrington, ACOG February 26, 2015 THE AQUIFER IN REVIEW.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Connecticut Department of Energy and Environmental Protection.
Preparing For Drought Alexander Hinz Daniel Rice Dorothy Young ________________ Water Supply Division Texas Commission on Environmental Quality 2015 TCEQ.
Local Control Accountability Plan Forestville Union School District December 2013.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Clark County’s Municipal Stormwater Permit Stormwater Manual and Code Update National Pollutant Discharge Elimination System & State Waste Discharge General.
Mitigation Plan for Four New Jersey Counties Adoption & Approval Process prepared for: Camden, Cumberland, Gloucester, and Salem Counties prepared by:
Division for Policy Administration 321 North Clark Street 21st Floor Chicago, IL (312) Fax: (312)
Solid Waste Management Plans Update Webinar Training March 5, 2014.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
1 Triennial Review of Water Quality Standards Pennsylvania Department of Environmental Protection Bureau of Water Standards and Facility Regulation Review.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Kick-off Meeting January 27, 2015 Tony Quintanilla, MWRD Sanjay Sofat, IEPA Proceedings are being video recorded and will be made available. Chicago Area.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
April 20, Water Conservation Ordinance The new legislation (15A NCAC 02E. 0607) created new requirements for dealing with water emergencies and.
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
HYDRAULIC FRACTURING (FRACKING) AND OFFSHORE DRILLING / EXPLORATION UPDATE CITY COUNCIL WORKSHOP FEBRUARY 9, 2016.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
CALIFORNIA WATER ISSUES Survey of Wine Institute Advocacy Efforts Wine Institute Board of Directors Meeting – March 8, 2016 Tim Schmelzer, Director of.
TREE PROTECTION ORDINANCE Town of Oak Island. HISTORY AND BACKGROUND In 2015 the Town of Oak Island applied for an Urban and Community Forestry Grant.
Draft Revised Ordinance Cross Connection Control and Backflow Prevention March 27, 2015 Sun City Center.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
CHARTER REVIEW COMMITTEE Chatham. Charter Review Committee Section 8-2 Periodic Charter Review  At least once every five years a special.
May 14, Planning Commission Planning Commission May 14, 2015.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Latest OKR04 Issues Tulsa HHPC Special Events
VIRGINIA’S TMDL PROCESS Four Mile Run Bacteria TMDL March 25, 2002
Triennial Review of Water Quality Standards Proposed Rulemaking
Department of Environmental Quality
Arsenic Acceptable Ambient Level Revision
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
Water Quality Credit Trading
Oil Pollution Act of 1990 (USA)
FLOODPLAIN MANAGEMENT LEGISLATIVE UPDATE
Department of Environmental Quality
Jessica Montie, Division of Waste Management
Status Update Tar-Pamlico Phase IV Agreement
Presentation to Maryland’s Trading Advisory Committee March 21, 2016
Julie Woosley, Division of Waste Management
Delta Long-Term Management Strategy
Presentation to Maryland’s Trading Advisory Committee March 21, 2016
Office of Medicaid Policy and Planning
Indiana Department of Environmental Management Office of Water Quality
Budget and Legislative Request
Presentation transcript:

2014 WATER LEGISLATION John Harrington, ACOG March 27, 2014

OKLAHOMA WATER LEGISLATION BILLS CONCERNING WATER THIS YEAR (2013 HAD 48). MUCH OF THIS WAS BILLS REINTRODUCED FROM LAST YEAR.

OKLAHOMA WATER LEGISLATION 2014 MeasureStatusLast ActionShort TitleAuthor(s) SB1187Engross3/12/2014Environment and natural resources; requiring Environmental Quality Board to promulgate rules governing water reuse projects; DEQ to issue permit. Emergency. Standridge(S), Martin(H) SB1198Engross3/12/2014Waterways; modifying membership to waterways advisory board. Effective Date. Emergency. Stanislawski(S), Brumbaugh(H) HB2910Engross3/12/2014Roads and bridges; modifying membership eligibility for Oklahoma Waterways Advisory Board; effective date. Brumbaugh(H) SB1430Engross3/13/2014Waters and water rights; creating the Drought Proof Communities Act of Emergency. Schulz(S), DeWitt(H) HB2455Engross3/12/2014Cities and towns; contracts for water; modifying annual review of contract rates; requiring certain entities share costs; effective date. Turner(H)

OKLAHOMA WATER LEGISLATION 2014

CALENDAR DEADLINES March 27 - First committee for bills (double referrals) April 3: Single committee for bills April 10: Second committee for bills (double referrals) April 24: 3rd Reading in Opposite House Deadline May 30: Sine Die

Geophysical Survey Canadian County

Geophysical Survey - Canadian County 850 FEET 1625 FEET 32 ACRES

N UNITS IN METERS Geophysical Survey - Canadian County

UNITS IN METERS Geophysical Survey - Canadian County

UNITS IN METERS Geophysical Survey - Canadian County

UNITS IN METERS Geophysical Survey - Canadian County

Crescent-Shaped Geological Forms – Barchans?

Point Bar from Old Chan nel Syste m Geophysical Survey - Canadian County Crescent-Shaped Geological Forms – Point Bars

UNITS IN METERS Geophysical Survey - Canadian County

Present Channel Oxbow Geophysical Survey - Canadian County

Present Channel Former Channel Point Bar from Old Channel System Stream Geophysical Survey - Canadian County

POINT BARS USUALLY HAVE LOTS OF POROSITY…..

Geophysical Survey - Canadian County RECOMMENDATION: DRILL THIS!

CANADIAN RIVER STUDY Canadian River at a park in Oklahoma City, Oklahoma Territory 1900

CANADIAN RIVER STUDY

The draft WLA report will be submitted to ACOG for review by the CRPG After addressing CRPG comments (if any), Guernsey will submit the report to ACOG. ACOG will then submit it to ODEQ. ODEQ will submit the report to the US Environmental Protection Agency (USEPA) for a technical review. Guernsey/FTN will address technical comments from USEPA and revise the WLA report if necessary. After EPA issues a technical approval of the WLA report, ODEQ will begin the public review process for updating the Water Quality Management Plan (WQMP) to incorporate the effluent limits in the WLA report. After the specified time period for receiving public comments on the WQMP update, ODEQ will respond to those comments. Once the WLA report receives final approval from EPA, the process for the WLA study will be complete. ODEQ will then begin addressing the details of incorporating the new effluent limits that are in the WLA report (and the WQMP) into discharge permits.

CANADIAN RIVER STUDY