FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River Case Study Melissa Grader U.S. Fish and Wildlife Service.

Slides:



Advertisements
Similar presentations
Planning for fish bearing waters between Glen Canyon Dam and Lake Mead.
Advertisements

The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River Case Study Robert Gates FirstLight Power Resources Services.
Instream Flow Problem Solving the Platte River in Nebraska Ann Bleed Flow 2008.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Tidal Energy in Alaska Permitting Issues Michael Murphy Devine Tarbell & Associates.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
THE GEOMORPHIC RESPONSE OF RIVERS TO DAMS Speakers – John Berry and John Esler.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Decommissioning and Site Restoration of Non-Federal Hydroelectric Projects John A. Schnagl Federal Energy Regulatory Commission (202)
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
JT Petty: WMAN 445 Lecture Notes Lecture 5.2: STATE POLICY.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Sept 18, 2008CVEN 4838/5838Slide #1 Lecture 8 Regulatory Processes.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Chelan County PUD March 16, Staff recommendation for license action and resolution License Order Rehearing and Clarification Rehearing Items License.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 8, 2010.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
GKRSE law offices of GKRSE 1 Federal Regulatory Issues Affecting the Development of Hydro in the Northeast Nancy J. Skancke Law Offices of GKRSE Washington,
New Technologies: Fish & Wildlife Permitting Issues Cherise M. Oram STOEL RIVES LLP NWHA Annual Conference – February 20, 2008.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
FCRPS Adaptive Management Implementation Plan (AMIP) 1 September 15, 2009.
SCOPE CREEP IN LICENSE IMPLEMENTATION  Root Causes Ambiguous license terms/plans Ambiguous license terms/plans Changing social values Changing social.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Fish and Wildlife : Regulatory Framework and Challenges Cherise M. Oram STOEL RIVES LLP Hydrovision 2008 Ocean/Tidal/Stream Power Track 7D “Environmental.
New Technologies: Fish & Wildlife Permitting Issues Cherise M. Oram STOEL RIVES LLP NWHA Annual Conference – February 20, 2008.
1.What is the standard relicensing process in the U.S. and what is the ALP (Alternative Licensing Process) ? 2.How did we convince FERC to agree to an.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Public Meeting May 15, 2007, 6-9 pm Millville Grange Palo Cedro, CA.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Margaret Byrne, U.S. Fish and Wildlife Service
Overview of Proposed Alaska National Wildlife Refuges Regulatory Changes U.S. Fish and Wildlife Service.
Water Quality Certification for hydropower licensing in Wisconsin.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
HYDROPOWER Themes: 1. Ongoing interest group conflict over: development vs. environment (universal) public vs. private ownership 2.How the licensing process.
Director’s Order 12 contains information concerning review of other agency proposals.
1 Water Quality Standards - CWA and Porter-Cologne An Overview.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Origin  On October 18, 1997 – 25 th Anniversary of Clean Water Act – Federal agencies were asked to rededicate their efforts to cleaning up the Nations.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Submittal And Review Of New And Revised Water Quality Standards
Water Quality Standards Submittal & Review Process
Environmental Flow Protection in TCEQ Permitting
Michigan Dept. of Environmental Quality Water Resources Division
WATER POLICY And Management in AlabamA
The Clean Water Acts of 1977, 1981, & 1987
Clean Water Act (CWA) Purpose
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Presentation transcript:

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River Case Study Melissa Grader U.S. Fish and Wildlife Service

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX POLICY PUBLIC DIALOGUE SCIENCE INSTREAM FLOW DECISION

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River 2 nd largest watershed in CT 1,946 sq. mi. 123 miles long, from MA thru CT

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Hydropower Relicensing  Regulatory body is the Federal Energy Regulatory Commission  Existing license(s) due to expire  New license lasts years relicensing represented major opportunity to address instream flow issues associated with the Project Impetus for instream flow decision:

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Housatonic River Project David Ellis; 14 ft. high dam 0.3 mile long bypass reach 24 ft. high dam 2-mile long bypass reach 140 ft. high dam no bypass reach 124 ft. high dam

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Stakeholders Licensee Resource agencies Anglers Boaters Hikers Lake associations NGOs Tribal nation Abutters Municipalities

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Issues

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX StakeholderPosition / Goal for Relicensing LicenseeEssentially status quo, with small increases in bypass and below-project flows Resource agenciesImprove water quality; improve bypass and below-project flow regimes; fish passage BoatersNo change to operations at FV and BB AnglersImproved flow regime at FV and BB

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX FERC Process Decision made within what policy context:  FPA governs (re)licensing process  In issuing permits, FERC shall: “...give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality.”  Comprehensive regulations (18 CFR Parts 1 to 399) FERC responsible for determining whether a proposal represents the most comprehensive plan for development of the waterway for all beneficial public uses within the meaning of Section 10(a) of the FPA Relevant sections include 10(a), 10(j), 4(e), 18  Requires consultation with stakeholders and submittal of applicable permits (e.g., CZM, WQC, etc.)

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX FERC Process Decision made within what policy context: 10(j) Recommendations  Pursuant to this section of the FPA, fish and wildlife recommendations must be included in the license unless inconsistent with other Federal Law. Recommendations must provide for protection, mitigation, or enhancement of fish and wildlife Requires dispute resolution with agencies if FERC finds recommendation inconsistent If recommendation not adopted, FERC must find that conditions it selects meet requirements of Section 10(a) “best adapted” to comprehensive development of the waterway

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Decision made within what policy context: 401 Process  Section 401 of the Clean Water Act requires that an applicant for a federal license or permit provide a certification that any discharges from the facility will comply with the Act, including water quality standard requirements. Goal is to restore and maintain chemical, physical and biological integrity of surface waters, providing for protection and propagation of fish, shellfish, and wildlife and provide for recreation in and on the water  Implemented through State’s 401 process Must ensure project meets water quality standards  narrative and numerical criteria  existing uses (anti-degradation)  designated uses  Courts consistently ruled that that FERC must include all conditions of 401 certificate in a project license (unless authority is waived)  States differ in 401 process (e.g., appeals, reserved authority)

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Science: FERC & 401 both rely on it  Need sound and thorough administrative record upon which to base decisions  Scientific method should be proven  FERC process requires applicant and agencies to propose studies, and consult on study design For the Housatonic River Project, decision made to use IFIM and IDF **both serve to evaluate relationship between habitat and flow** IFIM  Used below FV and BB, and in lower BB bypass reach  Conducted three analyses with data

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Flow Studies 1. Habitat vs. Flow

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX * For trout fry in summer 2. Habitat Time Series

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX 3. Dual-Flow

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Flow Studies IDF ~ FV and upper BB bypass reaches and d/s of Stevenson dam

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Public Dialogue: FERC  Under TLP, a number of points in process allow for public participation/involvement applicant holds public meeting after filing the ICD public notice issued once application is filed with FERC (soliciting comments/study requests) subsequent notice soliciting protests & interventions opportunity for public to weigh in on FERC’s SD for NEPA analysis Notice of REA allowing for public comment prior to conducting NEPA public comment period after DEA/DEIS issued any intervenor has ability to appeal license

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX 401  CT DEP issued draft 401 ROR and bypass flows at FV and BB, and base flow at Shepaug and Stevenson  Provided public with opportunity to comment within 45 days (posted on website, in major newspapers)  Subsequently issued final 401 along with summary of response to comments received Public Dialogue:

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX CT DEP issued WQC requiring:  run-of-river at FV and BB  bypass flows at FV, BB  below-project flows at Stevenson  headpond fluctuation limits at Stevenson and Shepaug  DO enhancement at Shepaug  fish passage  pumping restrictions at Rocky River  various plans (monitoring, fish passage water quality, etc.) FWS issued CRP letter including 10(j) recommendations and Sect. 18 Prescription  consistent with 401 conditions  minimum flow below Shepaug Neither 401 nor fishway prescription appealable, so became part of the license issued by FERC Relicensing Outcome

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX POLICY PUBLIC DIALOGUE SCIENCE INSTREAM FLOW DECISION In FERC-driven process, policy and science contribute more than public dialogue to the decision Thames River Side Agreement  MOA signed by FWS, CTDEP and NGS  Calls for fish passage at 2 non-jurisdictional hydro projects on the Thames watershed

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Lessons Learned  Particulars of this licensing facilitated a specific outcome licensing process chosen 401 and Sect. 18 authorities off-site restoration opportunities  Coordination between DEP and FWS enhanced outcome Applicability to other Projects?  Likely not broadly applicable unique set of circumstances  Landscape very different now TTH/AFP for S. 18 new ILP

FLOW 2008 Oct. 7-9, 2008 San Antonio, TX Taftville, unlicensed Shetucket River Tunnel, unlicensed Quinebaug River