Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Vacuum Vessel Production Readiness Review
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
ATLAS Pixel Detector BCM Signal Cable October 5, 2005 E. Anderssen, LBNL.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
LHCC referee meeting L.Rossi - INFN / Genova CERN - March Status of insertable pixel  Layout in 2000 (Dubna layout)  Reasons for the change.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
HFT-Beam Pipe D. Beavis BNL March 14, Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.
Composite Joining Techniques: Bolted Joints LBNL Composites Workshop February 29-March 3, 2016.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
Hcal Geometry and Assembly
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Mechanics: (Tim).
Installation step 4. (3 days)
Integration issues at IHEP
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
The IR beam pipe M. Sullivan For
Preliminary PXL support models with assembly fixtures
TEC Services Status 30/12/2018 Nick Lumb.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL

Engineering Division Description The MSC directly supports the IST and Pixel detectors as well as the Beam Pipe mid-section The MSC is supported by externally by the Cone Structures (bolted flanges to Cones) IST and Pixels are Cantilevered from the MSC Interface Flange, along with Far Beam Pipe Support Breaks (bolted flange joints) necessitated by assembly (discussed later) 2 Pixel Insertion Tube IST MSC Interface Flange

Engineering Division MST Supports Pixel Insertion Tube Simply supported at both ends Cantilever section is bolted to inside of ESC (East Support Cylinder/Cone) Fingered interface to allow IST Services to pass thru this interface Lengths still under iteration with ESC design 3

Engineering Division Assembly Sequence Drives MSC Layout IST is integrated first (and tested) on smaller MSC Cylinder Interface Flange is present to allow service integration (connector strain relief) Beam Pipe installed/Supported after IST Integrated onto MSC Note Pixel Kinematic mounts also part of this structure Mounts May interfere with IST… 4 Pixel Kinematic Mounts

Engineering Division Staged Assembly of Beam Pipe Access to Vacuum Flange during assembly necessitates split in ISC Note also Beam Pipe support at MSC Interface flange—access needed to make up support Large overhang, and External Pixel Insertion tooling may lead to longer PIT Services for IST Now routed over PIT View to left shows gaps in fingers for IST Services 5 ? <Length Between Supports

Engineering Division IST Services on Outside of MSC Route is moderately torturous, but gap can be increased with minimal effort Tubes (~1cm OD Rigid Aluminum) need to be routed thru this gap along with cables of similar size 8 Support Fingers, so 3 Staves per Gap (3-6Tubes/3Cables) 6 12mm

Engineering Division Integration Status Recent work on Cone structures shifted Pixel Mount locations (potential interference with IST) IST working on shorter layout—may alleviate Lengths are easy to change—Mfg limit ~2.8m which we are nowhere near Beam Pipe supports still need to be designed, but scheme allows access to flanges Pixel Insertion well understood for internal geometry External Pixel insertion scheme not yet—may affect length of PIT External Support on East End of Beam Pipe will affect Pixel Insertion (longer PIT may help by removing this external support) 7