Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
 Slides by Raul Olivera from FRC 111 – WildStang › Presentation from the FIRST Championships in 2008 › ON_Pneumatic_Power_Olivera.ppt.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Vacuum Vessel Production Readiness Review
Review of Helium Venting Analyses
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
PEEM III Endstation Design Review
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Alpha Magnetic Spectrometer - 02 Flight Safety Review Phase II May , 2007 Analysis - Welding and Brazing Dan Rybicki – Materials Analysis Jacobs.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
Composite Overwrapped Pressure Vessels
SBS Magnet and Infrastructure Status Robin Wines July 2015.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
All Metal Gate Valve from VAT
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration of the Spectrometer Solenoid Magnets
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Installation of the T600 at Fermilab
CERN – Zanon discussions
Senior Optical Engineer
LARP Vertical Test Facility
Figure 18.1 Typical port fuel-injection system, indicating the location of various components. Notice that the fuel pressure regulator is located on.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Welcome! Drafting 2323: Pipe Drafting
Chemical Engineering Explained
880V 21/2”-10”.
CRYOMODULE FINAL ASSEMBLY
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott

AMS-02 GSR Phase II2 Vacuum Case CLEVIS PLATE 2X OUTER CYLINDER UPPER SUPPORT RING UPPER INTERFACE PLATE 4X LOWER INTERFACE PLATE 4X LOWER SUPPORT RING STRAP PORT 16X ELECTRICAL/PLUMBING/ CRYOCOOLER PORT 25X CONICAL FLANGE 2X INNER CYLINDER

Phil MottAMS-02 GSR Phase II3 Vacuum Case with External Hardware VC Burst Disc with Zero Thrust Vent Warm He Tank with MMOD Shield SFHe Tank Burst Disc with Zero Thrust Vent

Phil MottAMS-02 GSR Phase II4 SUPERFLUID HELIUM TANK MAGNET RACETRACK COIL (DIPOLE COIL ROTATED 90 o ) VACUUM SPACE 1 x TORR SUPER INSULATION & VAPOR COOLED SHIELDS UPPER CONICAL FLANGE Vacuum Case Cross Section UPPER SUPPORT RING UPPER INTERFACE PLATE OUTER CYLINDER INNER CYLINDER OUTER JOINT INNER JOINT LOWER SUPPORT RING LOWER INTERFACE PLATE LOWER CONICAL FLANGE Skin thickness between each rib varies from.152” -.265”

Phil MottAMS-02 GSR Phase II5 Inner Joint  Welded Joint – U Groove Design, 3 Pass.  O-Ring joint not possible due to design constraints on both sides of the joint.  Joint is designed for 3 welds – Initial plus 2 contingencies.  Three complete closeout welds will take place prior to the closeout weld on the Flight Assembly:  First Article (initial & 1 re- weld)  STA at vendor’s facility for pressure and leak tests.  STA at SCL in Culham, England. UPPER or LOWER CONICAL FLANGE INNER CYLINDER MAGNET KEEP-IN ZONE 5/16 WELD PREP COMPLETED WELD

Phil MottAMS-02 GSR Phase II6 Outer Joint  Double O-Ring bolted joint.  Mechanical attachment:  Conical Flange, Upper: UNJF  Outer Cylinder, Upper: UNJF  Outer Cylinder, Lower: UNJF & UNJF  Conical Flange, Lower: UNJF  O-Ring material is Viton, 75 Durometer.  Test ports between each O- Ring for individual leak checks. TYPICAL O-RING CONFIGURATION FOR SUPPORT RING TO OUTER CYLINDER AND SUPPORT RING TO CONICAL FLANGE HEX PLUG TO SEAL TEST PORT with O-Ring O-RINGS OUTER CYLINDER CONICAL FLANGE SUPPORT RING O-RING TEST PORT VACUUM SPACE INTERFACE PLATE

Phil MottAMS-02 GSR Phase II7 Feedthru Ports & Cryocooler Ports  Mechanical Attachment  UNJF  Double O-Ring joint  Viton, 75 Durometer  Test Port between O-Rings O-RING TEST PORT (HEX PLUG NOT SHOWN FOR CLARITY) ORIENTATION & LOCATION WILL VARY DEPENDING ON THE ATTACHED COMPONENT OUTER CYLINDER O-RINGS SUPPORT RING (UPPER OR LOWER) MATING COMPONENT VACUUM CASE FEEDTHRU PORT

Phil MottAMS-02 GSR Phase II8 Strap Port  Closeout Cap Mechanical Attachment  UNJF  Double O-Ring joint  Viton, 75 Durometer  Test Port between O-Rings SUPPORT RING STRAP CLOSEOUT CAP STRAP ASSEMBLY O-RINGS (TEST PORT NOT SHOWN IN THIS VIEW)

Phil MottAMS-02 GSR Phase II9 Closeout Weld

Phil MottAMS-02 GSR Phase II10 Closeout Weld Inspection  Joint design does not allow for x-ray inspection of the weld  Weld is visually and dye penetrant inspected.  Weld is ultrasonically inspected using a phased array system. The STA weld at the vendor was inspected manually.  Both methods have been qualified to MSFC-SPEC-504C using flat plates and a First Article.

Phil MottAMS-02 GSR Phase II11 Vacuum Leak Test  Both the Flight and STA VC’s were vacuum tested at the vendor. Both met the vacuum requirement of 1 x 10-6 torr.  Each O-Ring was individually tested.  Helium leak rate for both VC’s met the spec of 1.0 x 10-7 std cc/sec

Phil MottAMS-02 GSR Phase II12 Proof Pressure Test  The STA VC has been successfully proof pressure tested with argon at the vendor and at SM.  Proof pressure: 1.8 atm absolute (26.5 psi). [1.0 x MDP]