April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Basic Refrigeration Cycle
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Presented by Jon Pannell
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Unit 205: Cold water systems
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Installation. Indoor Unit Installation Typical Installation.
Hydraulics For The Long Term
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Cooling connections in the service gap Richard French The University of Sheffield.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Production and QA of Barrel / Endcap Heat Exchangers ATLAS SCT PRR April 13 th & 14 th 2005John Morris – Queen Mary, University London Heat Exchanger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Paul Barclay SCT COOLING PRR DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
HEX Procurement Parts List Contains: qualification parts, Barrel & EndCap HEX Web site also contains a.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
P.Barclay CLRC1 SCT HEX PRR ( ) Design and qualification of fittings and filters l Background comments: »Space and assembly constraints prevent us.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Stator Plan & Schedule Chris Booth 2nd March 2009
MQXC Nb-Ti 120mm 120T/m 2m models
Coil Design and Fabrication
Service channels between Tracker and PP1
End-cap Mechanics FDR Overview of the Project
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Integration issues at IHEP
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder & On-Cylinder »Manufacture – On-cylinder only »Assembly – On-cylinder only »Post assembly operations – On-cylinder only »Schedule – On-cylinder only

April 05 Jason Tarrant CCLRC2 PRR of SCT off-detector cooling system l Design »Off-Cylinder »On-Cylinder

April 05 Jason Tarrant CCLRC3 PRR of SCT off-detector cooling system l Design »Off-Cylinder –HEX / filter –Heater »On-Cylinder –Inlet –Exhaust –Combined

April 05 Jason Tarrant CCLRC4 PRR of SCT off-detector cooling system l Design »Inlet – with fluid flow l PPF1 l 5mm OD / 3.4mm ID with filter l 3mm OD / 2mm ID through HEX l ECcap3 custom STFT l Capillaries l LMT cooling circuit (combined) – or – Disc

April 05 Jason Tarrant CCLRC5 PRR of SCT off-detector cooling system l Design – Inlet… PPF1 –6mm OD – 5mm OD –SERTO issues l 316 Magnetic? (Danielsson / Olcese) –Swagelock issues l Not survive many connection / disconnection l May need retightening after time »5mm OD / 3.4mm ID with filter –Standard Cu tube 5mm OD 0.8mm wall l Joined over 3mm OD tube exiting the HEX (QMUL design) –Filter design l Screen l 0.5mm holes (264) > 5x  3.4mm ID of inlet tube l Capillary ID 0.68 or 0.76mm

April 05 Jason Tarrant CCLRC6 PRR of SCT off-detector cooling system l Design – Inlet… »5mm OD / 3.4mm ID with filter…

April 05 Jason Tarrant CCLRC7 PRR of SCT off-detector cooling system l Design – Inlet… »3mm OD / 2mm ID through HEX –CERN stores –Coiled through HEX l 8mm ID, 13.5mm OD (touching) l 4mm pitch, 84 coils l Effective length 2923mm (incl. 10mm each end to start coil) »ECcap3 custom STFT –Space, electrical isolation, soldering compatibility To PPF1

April 05 Jason Tarrant CCLRC8 PRR of SCT off-detector cooling system l Design – Inlet… »Capillaries –ID 0.68mm or 0.76mm –Length around 2.5m (tuned) –Coiled / convoluted routing on cylinder (TBD) –Joined to LMT Cooling circuit or PPF1 »LMT cooling circuit (combined) –3.74mm OD 70um wall –Swaged-solder connection

April 05 Jason Tarrant CCLRC9 PRR of SCT off-detector cooling system l Design – Inlet… »PPF0 –Based on Helicoflex –Already tested (I.Wilmut) –Only hole  changes from original design l 2 Types 1.3 & 1.25 nominal (0.76 & 0.68mm ID)

April 05 Jason Tarrant CCLRC10 PRR of SCT off-detector cooling system l Design »Exhaust – with fluid flow l Disc or LMT cooling l 6.0mm ID / 8.1mm ID tubing l ECex1 l HEX l ECheat1 custom connection l Heater l PPF1

April 05 Jason Tarrant CCLRC11 PRR of SCT off-detector cooling system l Design – Exhaust… Disc or LMT cooling –PPF0 –LMT Cooling

April 05 Jason Tarrant CCLRC12 PRR of SCT off-detector cooling system l Design – Exhaust… »6.0mm ID / 8.1mm ID tubing –6.0mm ID l 0.2mm wall = 30mm bend R –8.1mm ID l 0.15mm wall = straight lengths only l 4x8.4mm (+1.2mm gaps) = 37.2mm

April 05 Jason Tarrant CCLRC13 PRR of SCT off-detector cooling system l Design – Exhaust… »ECex1 –Custom connection »HEX –14mm ID 0.2mm wall CuNi –370mm long body with end caps STFT

April 05 Jason Tarrant CCLRC14 PRR of SCT off-detector cooling system l Design – Exhaust… »ECheat1 custom connection –Staggered connections –Insulation issues –Fastening issues –Cu – Stain.s

April 05 Jason Tarrant CCLRC15 PRR of SCT off-detector cooling system l Design – Exhaust… »Heater »PPF1 –SERTO 6mm OD - 6mm OD

April 05 Jason Tarrant CCLRC16 PRR of SCT off-detector cooling system l Design – Off-cylinder »HEX assemblies (no inlet / filter) complete –Iteration through QMUL practical experience (end-caps – soldering of ECcap3 & ECex1) »Higher level, 1 ‘sample’ for in-house tests, rest to do »Assembly of all HEX (new) for overall view »Parameter dwg to do?

April 05 Jason Tarrant CCLRC17 PRR of SCT off-detector cooling system l Design – On-cylinder »Exhaust & LMT circuit design, PPF1 – STFT complete

April 05 Jason Tarrant CCLRC18 PRR of SCT off-detector cooling system l Installation – On-cylinder – Assembly Sites (Liv. NIK.) »Combined (Exhaust / Inlet assembly) –D9-D7 before D9 or before D6 services laid (avoid layering) –Laid using support frame –STFT clip (await connection), PPF0 connected, LMT Kapton taped –Exhaust uses insert mounted clamp, Inlet clipped to exhaust, LMT wrapped with LMTs »Exhaust –D6 –D1 with relevant Disc –Laid by hand STFT clip (await connection), PPF0 connected –Exhaust uses Support Cylinder insert mounted clamp

April 05 Jason Tarrant CCLRC19 PRR of SCT off-detector cooling system l Installation – On-cylinder – Assembly Sites (Liv. NIK.) »Inlet –D6-D1 with relevant Disc –Pre-formed coils –Laid by hand, supported above STFT, Kapton taped –Inlet clipped to exhaust

April 05 Jason Tarrant CCLRC20 PRR of SCT off-detector cooling system l Installation – On-cylinder – Assembly Sites (Liv. NIK.) »Connection for Testing

April 05 Jason Tarrant CCLRC21 PRR of SCT off-detector cooling system l Installation – Off-cylinder »Space required to ‘insert’ connection –Use R1116 envelope (post EC insertion)

April 05 Jason Tarrant CCLRC22 PRR of SCT off-detector cooling system l Installation – Off-cylinder »Order of connection –Low Z to high Z –Special spanner Z+ Z-

April 05 Jason Tarrant CCLRC23 PRR of SCT off-detector cooling system l Installation – Off-cylinder »Strain relief at STFT (ECex1) –Permanent –Adjustable l positions not guaranteed

April 05 Jason Tarrant CCLRC24 PRR of SCT off-detector cooling system l Installation – Off-cylinder »Connection for Testing –STFT break & make + drying if cold testing l Compromise for maximum HEX length –Extension pieces connected in, STFT sealed once, testing, remove & integrate SCT EC into ATLAS, add interconnect to PPF1, seal & test seal

April 05 Jason Tarrant CCLRC25 PRR of SCT off-detector cooling system l Manufacture – On-cylinder only »Piece Parts all detailed & out for manufacture with NTE (6 weeks from 24/03/05) »Attempting to get them to deliver those for D9 – D7 (including LMT cooling) ASAP

April 05 Jason Tarrant CCLRC26 PRR of SCT off-detector cooling system l Assembly – On-cylinder only »Jig details out for quote »Jig to be RAL for assembly of Interconnects, including LMT cooling

April 05 Jason Tarrant CCLRC27 PRR of SCT off-detector cooling system l Post assembly operations – On-cylinder only »Clean circuits –Flushing with Swansolve »Pressure test –To 25 Bar »Leak test –5x10-8 bar l/s (time / pressure test) »Check blockage –Simple flow test for circuits with capillaries (based on flow through Disc capillary for D9 – D7) »Bar code according to the ATLAS parts ID –With traveller document

April 05 Jason Tarrant CCLRC28 PRR of SCT off-detector cooling system l Schedule – On-cylinder only »Interconnects –SB - Models / drawings for D9 - D7 including LMT cooling - 09/03/05 –JT - Check drawings - 10/03/05 –SB - Quote pack to go to NTE - 11/03/05 –NTE - Quote back - 16/03/05 –SB / OM raise order & release through OM - 17/03/05 (actual 24/03/05) –NTE Manufacture - 6 Weeks(incl. Easter) - 28/04/05 –RAL Tech manufacture D9 (all 8 /2 types) incl.LMT cooling - 1 Week - 5/05/05 –RAL Tech manufacture D8 (all 8 /2 types) incl.LMT cooling - 1 Week - 12/05/05 –RAL Tech manufacture D7 (all 8 /2 types) incl.LMT cooling - 1 Week - 19/05/05

April 05 Jason Tarrant CCLRC29 PRR of SCT off-detector cooling system l Schedule »Jig –JT-Model Jig - 08/03/05 –Contractor detail jig - 2 Weeks - 22/03/05 –JT - Check drawings (incl. any changes) - 24/03/05 –JT -Quote pack to OM - 29/03/05 – Expected 01/04/05 (companies turning down!) –JT / OM raise order & release through OM - 29/03/05 –Manufacture 4 weeks - 26/04/05