1 Status of Forward Pixel Survey Andrei Gritsan, Mikhail Kubantsev, Nhan Tran* TB Meeting 16/04/08.

Slides:



Advertisements
Similar presentations
Work progress in Budapest A. Agocs, K. Krajczar, B. Radics, F. Sikler and G. Vesztergombi Hamburg, May 2011.
Advertisements

 (1385) ANALYSIS STATUS Enrico Fragiacomo, Massimo Venaruzzo INFN and University Trieste Resonances meeting – CERN – 04/03/2011.
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
S. M. Gibson, P. A. Coe, Photon02, 5 th September Coordinate Measurement in 2-D and 3-D Geometries using FSI Overview ATLAS Group, University of.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Wind Engineering Module 4.1 Blade Element Theory
Alignment Strategy for ATLAS: Detector Description and Database Issues
SCT Endcap Module Initial Alignments Using Survey Data Paul S Miyagawa University of Manchester.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
Workshop on B/Tau Physics, Helsinki V. Karim ä ki, HIP 1 Software Alignment of the CMS Tracker V. Karimäki / HIP V. Karimäki / HIP Workshop.
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
Effect of muon misalignments on muon p T resolution and on the search for Z' SSM → µ + µ - using 7 TeV MC samples Samir Guragain, Marcus Hohlmann Florida.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
1 ATLAS SCT Endcap C Efficiency Measurement Nicholas Austin IoP Conference April 2009.
1 Internal Alignment of VXD3 Overview VXD3 at SLD Observing misalignments with the track data Matrix technique to unfold alignment corrections Comments.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Craft Pixel Data Study (II) JC Yun, 6/12/09 1) FPix: view from interaction point 2) FPix pseudo-rapidity coverage.
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Pixel Response Simulation: Update Jan Conrad.
23/01/2007ID Software Workshop1 SCT performance from the SR1 endcap data Satoru Mima Okayama University ID Software Meeting 23-Jan Noise Study -
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
Fits to consec data In what follows the black line shows the mean and the rms of the double gaussian fit The green line (usually too small to be visible)
R. Castello (UC Louvain) on behalf of the Tracker alignment group The 2011 Tracker misalignment scenario CMS AlCa meeting Cern, 22/11/2011.
Mapping the Magnetic Field of the ATLAS Solenoid Paul S Miyagawa University of Manchester ATLAS experiment + solenoid Objectives Field mapping machine.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
PIXEL ladder alignment Hidemitsu ASANO. Photo analysis & survey beam data (with zero magnetic field) ① SVX standalone tracking Global Tracking Strategy.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
Smart Camera Network Localization Using a 3D Target John Kassebaum Nirupama Bulusu Wu-Chi Feng Portland State University.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Geometry Rigid Transformations What do the words below mean? (think 1 min, discuss in group 1 min) Translation Reflection Rotation A SLIDE. The object.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Installation of the waveguides between MB T0#2 and DB T0#2
Planar distortions for SCT Barrel Modules
Stave 4008 Z rubyballs coordinates
? ENDCAP: Mechanics IFIC-Valencia.
Integration and alignment of ATLAS SCT
Martin Weber RWTH Aachen 1st LHC Detector Alignment workshop CERN
CMS Tracker Alignment with Cosmic Data and Strategy at the Startup
HPS Collaboration meeting, JLAB, Nov 16, 2016
Plus Endcap Transfer Lines
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Geometry 2 Level 1.
Recent Results on TRT Alignment
Basic Assembly Constraints
Presentation transcript:

1 Status of Forward Pixel Survey Andrei Gritsan, Mikhail Kubantsev, Nhan Tran* TB Meeting 16/04/08

2 Concept/Formalism Each surveyed hierarchy consists of a system of points By use of rigid body formalism, we can determine how much each object is rotated and translated. We overlay survey and reference (fiducial) systems to determine ΔR and ΔΩ i = 1…N is the number of substructures per hiearchy j = 1…n is the number of points per substructure r ij is the position of each point; m ij is the mass of each point dr ij is the difference between reference and surveyed systems

3 Recap of Forward Pixel Survey Panel Survey Half Disk Survey Half Cylinder Survey Survey Hiearchy: Module Panel Half Disk (one-side) Half Disk Half Cylinder Pixel Endcap Software Hiearchy: Module Panel Blade Half Disk Half Cylinder Pixel Endcap

4 Half Disk Level Survey Using CMM measurements of fiducial points on modules, find displacements of: Modules on a Panel Panels on a Half Disk (one-side) Used stainless steel balls as reference targets to join two sides of a Half Disk “Finger-printing” of panels on half disk using known displacements of modules on a panel to find misidentified panels

5 Half Disk Error Analysis Errors at each hierarchy propagated by measurement uncertainties Using Toy MC analysis, we propagate measurement uncertainties into displacement uncertainties Module uncertainty is dominated by time/installation Panel/Blade uncertainty dependent on the number of point surveyed Panel Toy MC Study Survey errors used by alignment group

6 Results of Forward Pixel Half Disk Level Survey RMS values for module, panel, and blade local displacements Values considered as placement uncertainty Given in local frame; rotations given in Euler angles u (μm)v (μm)w (μm)  (mrad)  (mrad)  (mrad) Module Panel Blade

7 Recap of Forward Pixel Survey Surveyed Panel, Blade, Half Disk hierarchies via CMM measurements at FNAL Survey of about 200 production panels with CMMmeasurements Survey complete of all 8 FPix Half Disks Error analysis at all hierarchy levels

8 Half Cylinder Survey To create a half cylinder system, three sets of measurements used 1.Half Disk CMM measurements of sensor fiducials and 1mm phototargets for each side at FNAL 2.Half Disk PHG measurements of 1mm and 3mm phototargets at FNAL 3.Half Cylinder PHG measurements of visible 1mm and 3mm phototargets with half disks inserted at CERN In joining measurements (1) and (2), usually are about 30 common targets (next slide) In joining measurements (2) and (3), common targets vary between half disks (next slide)

9 Half Cylinder Survey Common targets in creation of Half Disk System Common targets in creation of Half Cylinder System

10 Half Cylinder Survey Results Results for each half disk in the half cylinder Values are presented about a point defined as the sum of the positions of the daughter modules of each half disk in the CMS global frame

11 Forward Pixel Survey Object A comparison of FPix Survey with Ideal Geometry All Survey measurements for each hierarchy are compiled and applied to the CMS geometry Results are saved to DB A typical plot: Δr/Δz/rΔ  vs. r/z/ 