Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Construction tolerances.

Slides:



Advertisements
Similar presentations
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Advertisements

TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, CERN, 14 May 2002Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Design updates since February.
TPC meeting, CERN, April 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, April 2002 B.S.Nielsen, J. Westergaard Niels.
TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Technical Board, 18 September 2002Børge Svane Nielsen, NBI1 Laser rays on TPC mylar strips Technical Board, 18 September 2002 Børge Svane Nielsen and Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
TPC status Marian Ivanov. Outlook TPC performance ExB correction Alignment Nonlinearities and edge effects Drift velocity calibration.
TPC Calibration with laser tracks B.S. Nielsen & G. Renault for the ALICE Collaboration Niels Bohr Institute.
Study of GEM-TPC Performance in Magnetic Fields Dean Karlen, Paul Poffenberger, Gabe Rosenbaum University of Victoria and TRIUMF, Canada 2005 ALCPG Workshop.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Measuring distortions in a TPC with photoelectrons D. Karlen University of Victoria & TRIUMF June 2, 2007.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Update of Victoria TPC R&D Dean Karlen, Thanos Michailopoulos, Chris Nell, Paul Poffenberger, Gabe Rosenbaum University of Victoria and TRIUMF, Canada.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Toby Shoobridge David Benham NERC Space Geodesy Facility Herstmonceux, UK
Brewer Ozone Spectrophotometer Pointing and Levelling C.T. McElroy York University Canada.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
LCTPC photoelectron calibration system D. Karlen / U. Victoria & TRIUMF LCTPC subsystems meeting DESY, February 25-26, 2008.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
1 Laser alignment system Status report Leszek Zawiejski Eryk Kielar, Krzystof Oliwa, Wojciech Wierba, INP PAN, Cracow, Poland Wojciech Slominski, Jagiellonian.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Marian Ivanov TPC ExB and V drift calibration and alignment.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Upgrade of the HSX Thomson Scattering System HSX TS upgrade requirement K. Zhai, F. S. B. Anderson, D. T. Anderson, C. Clark, HSX Plasma Laboratory, Univ.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Phase Feed-Forward Piotr Skowroński (CERN)
on behalf of the CLIC active pre-alignment team
VELO-installation meeting CERN, January 17, 2006
Laser calibration systems
T1 status (a selection from EDR presentations)
LumiCal mechanical design, integration with LDC and laser alignment
Target and Horn status report
Robert Pushor, Catherine LeCocq, Brian Fuss, Georg Gassner
Status of muon monitor R&D and construction
BGC Collaboration Meeting –
Presentation transcript:

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Construction tolerances and alignment  Lab tests at NBI  Status of system components  Production status and installation Design Review, CERN, 27 January 2003 Børge S. Nielsen, J.J. Gaardhøje, N. Lindegaard and Jørn Westergaard Niels Bohr Institute A. Lebedev, Brookhaven National Laboratory

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI2 Laser system objectives Electronics testing Sector alignment Drift velocity monitoring – Pressure, temperature – Temperature gradients (stratification?) – ExB effects, space charge Two possible approaches: – Relative measurements, rely only on time stability of laser ray position – Absolute measurements, requires knowledge of absolute position of laser ray. More ambitious

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI3 TPC Laser principle μJ/pulse,  = 1 mm 266 nm, 100 mJ/pulse, 5 ns pulse,  = 25 mm

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI4 Beam pattern inside TPC Radial beams Stratetic sector boundary crossings Avoid laser beam crossings 8 ’layers’ of rays along z 336 laser tracks in full TPC 

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI5 Spectron Laser Systems (UK): model SL UPG Pulsed UV laser (Nd:YAG): 100 mJ / 5 ns 266 nm, max 10 Hz expanded beam  = 25 mm divergence < 0.35 mrad, pointing stability < 0.1 mrad remote controllable (RS-232) UV laser

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI6 Laser hut and laser beam transport (1)

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI7 Laser hut and laser beam transport (2)

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI8 Beam transport on TPC end plates (1) Shaft side Beam entrance 90º mirror Beam entrance 90º mirror Beam splitter 50/50 Prism 30º bend Beam splitter 33/67 Beam monitor Beam splitter 99/1 Beam splitter 50/50 Prism 30º bend Muon side beam entrance

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI9 Beam transport on TPC end plates (2) Muon side Beam entrance 90º mirror Beam entrance 90º mirror Beam splitter 50/50 Prism 30º bend Beam splitter 33/67 Beam monitor Beam splitter 99/1 Beam splitter 50/50

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI10 Muon arm side beam transport limited space between TPC and space frame  move beam transport 10º from vertical plane adds 2 mirrors on shaft side + modifies beam transport on muon side attach 50 mm pipe on outside of TPC permanently special prism ”knee” in beam transport on shaft side ”standard” prism Muon side Shaft side We are currently considering to move back into the vertical plane

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI11 Design in progress on opto-mechanical supports on end-plates (copy/modify STAR systems): Optics on TPC end plates Prism holder Construction foreseen in NBI workshop Laser beam Market survey on optical components for end-plates ongoing Piezo-electric adjustment system from New Focus on order 

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI12 Mirror adjusters Based on commercial piezo solution  3 fully adjustable mirrors per half-TPC Ethernet interface

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI13 Laser rod with mirrors

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI14 Mirror support rings All rings have been produced at NBI

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI15 Micro-mirror z positions (a) (b) (a)  4 micro-mirrors per rod, at about (0, 1/3, 2/3, 1) length  vary z positions slightly between odd (a) and even (b) rods

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI16 Alignment by Poisson spot Wide laser beamBall or disc Screen Camera d = 266 nm

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI17 Operational aspects Sensors and remote controls:  Remote setup and monitoring of laser  CCD cameras for beam positioning: entrance mirrors on end plates end points on end plates end of laser rods  Remote beam manipulation:  4 mirrors in laser hut 1 entrance mirror on each end plate Data taking:  Test + special calibration runs: trigger from laser trigger laser (  several 10 Hz)  Normal physics runs: low rate trigger from laser

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI18 Stability of laser and beams Design with micro-mirrors  laser ray positions determined by the mirror positions and angles, not by the main laser beam or movable optics. Mechanical stability of the TPC is good enough for precise (100  m) relative measurements once the TPC is installed. During construction and installation, the TPC will undergo stresses due to handling (rotation) and change of loads (ROCs, cables etc). ’Absolute’ positions must refer to: TPC end plates, ROCs and Central Electrode.

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI19 Construction tolerances and alignment accuracy (1) What is known precisely and ’absolutely’ during construction? (   m)  pad plane z and wire z and x/y position  central electrode z position Well measured relative to each other (   m, 0.05 mrad):  internal dimensions and angles in micro-mirror bundles  micro-mirror bundles in support rings  bundle support rings in uninstalled rods Less well measured or prone to move during handling (  500  m, 0.2 mrad):  rod positions relative to ROCs, central electrode and ALICE x,y,z

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI20 Construction tolerances and alignment accuracy (2) ’Internal alignment’ and iterations (offline analysis) :  electrons from central electrode  ’absolute’ z  electrons from ROC pad plane and wires  ’absolute’ z, x/y  laser tracks close to outer rods  good relative alignment  laser tracks are straight lines  iterate to best ’absolute’ positions of laser rays  track time variations Additional alignment relative to end plates with horizontal and loaded TPC (   m, 0.05 mrad):  measure rod / micro-mirror bundle positions by survey through rods (fiducial marks useful)  measure some beams near inner cylinder with HeNe laser after rod installation

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI21 Status and Tests  Laser lab at NBI  Micro-mirror production in Moscow  Tests of micro-mirrors at NBI  Status of other components

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI22 Laser lab at NBI power supply 1064 nm laser doubler  532 nm quadrupler  266 nm expanding telescope amplifier rod with micro-mirrors CCD camera

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI23 Reflected 1 mm beam FWHM=0.93mm z=31cm z=200cm FWHM=0.95mm pure Fresnel diffraction

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI24 Reflected 1 mm beams (2) 16 cm 47 cm FWHM=1.00mm 1.17mm0.93mm 19 cm 1.01mm 23 cm 1.10mm 31 cm 0.93mm 100cm 150cm 0.79mm 200cm 0.95mm z=250 cm 1.14mm beam divergence 0.35 mrad Fresnel diffraction Measured

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI25 Micro-mirror production 1 mm  quartz fibres cut at 45º, polished, coated 7 micro-mirrors/bundle All 60 bundles produced and delivered in September 2002, but problems with surface quality on some mirrors and mechanical precision on some cups preliminary: 46 accepted based on surface quality most of these will be accepted after being mechanically improved at NBI additional 30 bundles almost ready in Moscow reflecting surfaces brass cup mechanical reference surface Micromirror bundle

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI26 Angles measurements (1)  and  angles of all micromirror faces measured by goniometer in Moscow     (5 arc sec)

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI27 Angles measurement (2) Re-calculation of angles to take into account offset centres of 7 mirrors  systematics in re-calculation still to be understood

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI28 Angles measurement (3) However: reference surface not good bundle not fixed to support in reproducible way  only relative angles any good from this measurement Reference surface has been turned off in NBI workshop to provide good surface

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI29 Mirror surfaces (1) Looked at all mirror reflections after 2.5 m. Example: bundle 18+19

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI30 Mirror surfaces (2) Analysed all mirror reflection profiles after 2.5 m. Example: bundle Rejected bad reflectivities and image shapes. Good mirrors generally have quite uniform reflectivity

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI31 Mirror reflectances Acceptance level: 150 (arbitrary units) Preliminary accepted bundles (based on reflectivity and image quality): 46 bundles out of 61 received Amplitudes of profiles on previous slide: Micro-mirror number

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI32 Angles NBI (1) All mirror angles have been re-measured at NBI, using laser beam setup. Estimated precision:   0.5 mrad (2 arc min)   0.5 mrad (2 arc min)

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI33 Angles NBI (2)

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI34 Angles NBI (3) Mean =  Sigma = 0.51  Mean =  Sigma = 0.94 

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI35 Linear NBI L Mean = mm Sigma = 0.57 mm

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI36 Rod gluing 1.Drill holes in short rods 2.Mount mirror bundles in support rings. 3.Glue mirror support rings onto short rods. Theta alignment guaranteed by jig + machined surface 4. Glue short rods into full length rods. Phi alignment adjusted during gluing 5.Measurements on final rod possible before installation. Foreseen for February-March at CERN.

Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI37 Production status and installation schedule Notes and presentations: Rod system: Micro-mirror bundles: ready ~1 Feb 2003 Mirror support rings produced Mirror testing: ongoing, fall beginning 2003 Rod production at CERN: spring 2003 Optics system: Principle design: done Detailed design: spring 2003 Production and installation: mid spring 2004 Commissioning: Together with TPC chambers: 2nd half Integration: Principle design: done Install laser in UX25: