TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,

Slides:



Advertisements
Similar presentations
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Advertisements

TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, CERN, 14 May 2002Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Design updates since February.
TPC meeting, CERN, April 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, April 2002 B.S.Nielsen, J. Westergaard Niels.
TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
OFD 1 Oli Durney LBTI Optical Engineer Steward Observatory University of Arizona NIC Aperture, Pupil, and Filter Wheel Positions Rev. 2.3 September 19,
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Technical Board, 18 September 2002Børge Svane Nielsen, NBI1 Laser rays on TPC mylar strips Technical Board, 18 September 2002 Børge Svane Nielsen and Jørn.
Laser Design Review, CERN, 27 Jan 2003Børge Svane Nielsen, NBI1 TPC Laser system  Functions of the system  Basics of the design  Construction tolerances.
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
19/12/06SAM_LGS_1, CTIO, Optics1 SOAR at Horizon Telescope Ring Section= x336mm Laser Box Width= mm.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
TPC Calibration with laser tracks B.S. Nielsen & G. Renault for the ALICE Collaboration Niels Bohr Institute.
3. Image motion due to optical element motion
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Installation of Delphi Frame  ITS Installation.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Laser DCS meeting, Utrecht, 13 June 2005Børge Svane Nielsen, NBI1 TPC laser controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser controls.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
LAUNCH X improvements. LAUNCH ©Auto Testing Division Content Sensor headProgrammeTarget dataClampsCabinetTurn table, Side slip.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Mars Sextant PDR Opti 523 Paul Ward-Dolkas.
Update on Pavia MM mechanical prototype
new straw end plug: D=10.6 mm straws support frame Levan option
Pre-installation and Functional Tests
Laser calibration systems
status of the second field cage
Ongoing and to do work M.Lenti.
nSW Alignment Installation
LumiCal mechanical design, integration with LDC and laser alignment
Progress on 1.8m Telescope with 127-element Adaptive Optics at IOE
Simplified Procedure Draft
Presentation transcript:

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard, Jørn Westergaard Niels Bohr Institute Work and developments since June 2003:  Assembly of short laser rods  Full rod production and installation  Status of quartz optics  Mechanics on end-plates  Controls

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI2 Rod gluing and installation 1.Drill holes in short rods: done 2.Mount mirror bundles in support rings: done 3.Glue mirror support rings onto short rods: done 4. Glue short rods into full length rods at CERN. Scheduled to commence 20 October.  alignment fixed during gluing, using green laser 5.Angle measurements on final rod possible in lab at CERN before installation, using same green laser 6.Angle measurements possible again during rod installation in field cage, using same green laser 7.Re-measurements with TPC in final orientation

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI3 Short laser rods & rings Micromirror positions as seen by laser beam: Near end-plates Near central electrode

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI4 Short rod gluing at CERN

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI5... awaiting full rod gluing: All rods are numbered with final destination and micro-mirror numbers for construction database

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI6 Green laser assembly Green laser has been fitted with telescope to produce 20 mm beam will be used for full length rod gluing and (with 90  prism) for installation of rods in FC should be used again to re-measure angles with horizontal TPC TPC end plate

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI7 Other on-going activities  Quartz components for end-plates and laser hut ordered: Delivery has started of 22 prisms of 2 types, 28 beam splitters of 4 different specs, 10 mirrors of 2 types, 45 windows of 2 types. Testing started  Ray has progressed on the placement of the laser hut   Design in progress on opto-mechanical supports on end-plates 3d CAD drawings of TPC end plates being made for clarity   DCS: laser remote control: RS axis adjusters control: Ethernet or RS-232 cameras: USB to PC downstairs, as ITS alignment discussing collaboration with M.Cherney / Creighton U.

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI8 Laser hut placement

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI9 Beam transport on end plates limited space between TPC and space frame  move beam transport 10º from vertical plane special prism ”knee” in beam transport on shaft side prism Muon side Shaft side

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI10 3d system drawing

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI11

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI12

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI13

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI14

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI15 Laser system principle