GSI Helmholtzzentrum für Schwerionenforschung GmbH Platforms and Infrastructure Collaboration meeting GSI-CERN 2014-10-02.

Slides:



Advertisements
Similar presentations
DEVELOPMENT OF ONLINE EVENT SELECTION IN CBM DEVELOPMENT OF ONLINE EVENT SELECTION IN CBM I. Kisel (for CBM Collaboration) I. Kisel (for CBM Collaboration)
Advertisements

Planar-GEM Trackers Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
HEPTECH meeting at Sofia Overview of Technology Marketing at GSI.
Latest News of the PHELIX Control ystem Latest News of the PHELIX Control System Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Instrumentation Collaboration meeting GSI-CERN
Description: Short description of the idea (elevator pitch) Business Impact: Describe the business need addressed by this idea. Why is this important.
Naming of element 110 Darmstadtium Element 111 approved by IUPAC.
Interface issues on Super-FRS magnets test at CERN CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang Meeting for Super-FRS magnets test.
| Status Report | Gesellschaft für Schwerionenforschung GmbH | PBSP | Philipp Gardlowski | 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH.
ARIS, Tokyo 2014 Spins, Moments, and Radii of Cd by High-Resolution Laser Spectroscopy D. T. Yordanov 1, D. L. Balabanski 2, M. L. Bissell 3, K.
Characterization of double sided silicon micro-strip sensors with a pulsed infra- red laser system for the CBM experiment Pradeep Ghosh 1,2 & Jürgen Eschke.
CBM Building and Infrastructure
In the G4/ROOT hierarchy there are three conceptual layers: - G4VSolid: shape, size - G4VSolid: shape, size - G4LogicalVolume: material, MF, sensitivity,
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Performance of the PANDA Barrel DIRC Prototype 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt 2 Goethe-Universität Frankfurt Marko Zühlsdorf.
July-2008Fabrizio Furano - The Scalla suite and the Xrootd1 cmsd xrootd cmsd xrootd cmsd xrootd cmsd xrootd Client Client A small 2-level cluster. Can.
This study has been performed with an apparatus consisting of two identical standard MWPCs, a clean gas system, an outgasing box, a Copper X-ray generator.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of Super-FRS Construction M. Winkler CERN-GSI Technical Coordination Meeting.
European Science Foundation Exploratory Workshop How to Constrain the High Density Symmetry Energy HiDeSymE ne European Science Foundation Exploratory.
Standalone FLES Package for Event Reconstruction and Selection in CBM DPG Mainz, 21 March 2012 I. Kisel 1,2, I. Kulakov 1, M. Zyzak 1 (for the CBM.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
Collinear laser spectroscopy with the COLLAPS setup M. L. Bissell on behalf of the COLLAPS collaboraion IS508: Mn IS519: Zn IS529: Ca.
NUFRA2015 Fifth International Conference on Nuclear Fragmentation From Basic Research to Applications October, 2015, Kemer (Antalya), Turkey.
GSI Helmholtzzentrum für Schwerionenforschung GmbH CRYRING Commissioning Issue tracking.
ROOT I/O in JavaScript Browsing ROOT Files on the Web For more information see: For any questions please use following address:
UPDATES OF IRRADIATION TESTS AT GSI ON LHC COLLIMATOR MATERIALS E. Quaranta, F. Carra, P. Hermes CollUSM August 1 st 2014 BE BEAM DEPARTMENT Many thanks.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland SMS CERN General Infrastructure.
Global Tracking for CBM Andrey Lebedev 1,2 Ivan Kisel 1 Gennady Ososkov 2 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany 2 Laboratory.
PHELIX shot database (PSDB) Udo Eisenbarth GSI Helmholtzzentrum für Schwerionenforschung GmbH CS Workshop, Jena Experiments Shots Instances.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Sabrina Appel | PBBP11 March GSI Helmholtzzentrum für Schwerionenforschung GmbH Tracking simulations.
Scan ~100 bar entry positions with laser diode measures transmitted intensity (relative to reference intensity) determine attenuation length (Λ) by aiming.
The Periodic Table of Videos by Brady Haran, and Martyn Poliakoff Science Volume 332(6033): May 27, 2011 Published by AAAS.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
1 ADAMAS Dec 2012 Piotr Koczoń,GSI Start Detector for - observation - simulation - realisation P.Koczoń / DetLab GSI Helmholtzzentrum für.
Spectroscopic study of the key rp- process waiting point 58 Zn A.Arcones, P.Boutachkov, I.Dillmann, C. Domingo-Pardo, H. Geissel, J. Gerl, M. Gorska, G.
GSI Helmholtzzentrum für Schwerionenforschung GmbH FAIR Proton Linac Status and plans with France GSI Helmholtzzentrum für Schwerionenforschung GmbH
GSI Helmholtzzentrum für Schwerionenforschung GmbH UNILAC: Review follow-up and upgrade plans W. Barth.
GSI Helmholtzzentrum für Schwerionenforschung GmbH The Optimized Superconducting Dipole of SIS100 for Series Production ICEC26 March 9th, 2016 GSI Helmholtzzentrum.
O. Kester, NuSTAR annual meeting, 27/02/2013
HADRON 2009, FloridaAnar Rustamov, GSI Darmstadt, Germany 1 Inclusive meson production at 3.5 GeV pp collisions with the HADES spectrometer Anar Rustamov.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 GSI Helmholtzzentrum für Schwerionenforschung GmbH.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Fast Beam Abort FAIR FC2WG: M.S. Mandaković, CSCO
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Dr. Hans Müller Primary Beams, Dept. SC Magnets and Testing (PB-MT) GSI Helmholtzzentrum für Schwerionenforschung.
The Planar GEM-Tracker …mechanics clashes Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
Short or Tall?. Short Tall Short Tall Short Tall. 3
Status of the FAIR Project
Testing of SC Magnets Status - November 2010
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
(Procurement, testing of magnets)
SIS-18 RF KNOCK-OUT OPTIMISATION STUDIES
Alhussain Abuhozaa,b, S. Biswasb, U. Frankenfeldb, J. Hehnerb, C. J
Introduction - MM FAIR Project - F.COTTENOT G.VILLIGER
Lattice Field Theory Research highlights of the NIC group
Beam dynamics of Super-FRS and MM requirements
پروتكل آموزش سلامت به مددجو
Systematic measurements of the gain and the energy resolution of single and double mask GEM detectors Saikat Biswas*a,b, D. J. Schmidta, A. Abuhozaa,d,
FAIR magnets fiducialisation WP 7.5
Revision 1 July 2016.
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Idea_Title (1/2) 2016 Activity Proposal Idea
are different varieties of
The PHELIX Control System PCS
are different varieties of
Collaborative Business Models
Student Projects AEPSHEP 2018 – Results –
Presentation transcript:

GSI Helmholtzzentrum für Schwerionenforschung GmbH Platforms and Infrastructure Collaboration meeting GSI-CERN

GSI Helmholtzzentrum für Schwerionenforschung GmbH FoS Long Multiplett

GSI Helmholtzzentrum für Schwerionenforschung GmbH FoS Small Multiplet

GSI Helmholtzzentrum für Schwerionenforschung GmbH Dipole (old design)

GSI Helmholtzzentrum für Schwerionenforschung GmbH Total WeightLengthWidthHeight Short Multiplet<25 t Long Multiplet <70 t Dipole47 t Additional fixed values: Beam height: 2 m Height of Cryo-connection: 3.3 m Cryo-Interface beam direction Multiplet Dipole Cryo-Interface beam direction Multiplet Dipole Cryo- Interface A Cryo- Interface B Remark: 9.75° type. 11° type is about 300 mm longer (and heavier)