N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Status of Phase Feedforward Tests
SLAC - End Station A ILC testrun – April '06 ...
Feed forward orbit corrections for the CLIC RTML
FONT stripline BPM resolution
Fitting to the Linear Region of I’/q
Extraction kicker scan & feedback results
Presentation transcript:

N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic

Introduction Results from 31 st October for: –IPB to IPC interpolation –Two electronics on one BPM study FONT Meeting2N. Blaskovic

IPB to IPC interpolation Take jitter run at start of shift with no change to optics other than to steer beam through both IPB and IPC in both x and y Then later calibrate with waist in x and y at each of IPB and IPC Jitter runs and calibrations taken at 0 dB to 50 dB FONT Meeting3N. Blaskovic

IPB to IPC interpolation Results: –Waveforms –IPB(Y) to IPC(Y) position correlation –Interpolated y paths from IPB to IPC –Interpolated x and y jitter from IPB to IPC FONT Meeting4N. Blaskovic

FONT Meeting5N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting6N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting7N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting8N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting9N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting10N. Blaskovic IPB(Y) I IPB(Y) Q IPC(Y) I IPC(Y) Q IPB(X) I IPB(X) Q IPC(X) IRef(X) IPC(X) Q

FONT Meeting11N. Blaskovic

FONT Meeting12N. Blaskovic

FONT Meeting13N. Blaskovic

FONT Meeting14N. Blaskovic

FONT Meeting15N. Blaskovic

FONT Meeting16N. Blaskovic

FONT Meeting17N. Blaskovic

FONT Meeting18N. Blaskovic

FONT Meeting19N. Blaskovic

FONT Meeting20N. Blaskovic

FONT Meeting21N. Blaskovic

FONT Meeting22N. Blaskovic

FONT Meeting23N. Blaskovic

FONT Meeting24N. Blaskovic

FONT Meeting25N. Blaskovic

FONT Meeting26N. Blaskovic

FONT Meeting27N. Blaskovic

FONT Meeting28N. Blaskovic

FONT Meeting29N. Blaskovic

2-on-1 resolution Split IPB(Y) signal into two sets of Honda’s electronics Use a calibration at each charge Use MFB1FF for charge normalisation (with 6 dB stripline attenuation) Histograms make use of 10-sample averaging from 37 to 46 FONT Meeting30N. Blaskovic

FONT Meeting31N. Blaskovic

FONT Meeting32N. Blaskovic

FONT Meeting33N. Blaskovic

FONT Meeting34N. Blaskovic

FONT Meeting35N. Blaskovic

FONT Meeting36N. Blaskovic

FONT Meeting37 Appendix 2-on-1 resolution vs. sampling window

FONT Meeting38N. Blaskovic

FONT Meeting39N. Blaskovic

FONT Meeting40N. Blaskovic

FONT Meeting41N. Blaskovic

FONT Meeting42N. Blaskovic