REMBESAN Pada sheet pile (Turap)/ bawah tubuh bendung (solid dam)

Slides:



Advertisements
Similar presentations
SMNO.jursntnhfpub.Sept2012
Advertisements

 Masuklah Kebawah meja dan lindungi tubuh anda dari benda – benda yang berjatuhan  Menggunakan bantal untuk melindungi kepala  Jangan menyalakan kompor,
BAB 2: JAHITAN TINGKATAN 3: EKONOMI RUMAH TANGGA
Evaporasi / transpirasi - Air yang ada di laut, di daratan, di sungai, di tanaman, dsb. kemudian akan menguap ke angkasa (atmosfer) dan kemudian akan.
SISTEM PEREDARAN DARAH
(NEMERTINA = NEMERTEA)
ILMU BANGUNAN KAPAL.
Penyebab Banjir dan Cara Menanggulangi Banjir
Jenis-jenis pili Pili berbibir Pili bertiang Apa itu pili ?
IKATAN KIMIA Aturan Oktet
Oleh Donnydjleihitu.wordpress.com Donny Dwy Judianto Leihitu, ST, MT.
NON-EUCLIDEAN GEOMETRIS
KELAS CEPHALOPODA Sepia Nautilus
STANDAR KOMPETENSI Mengekspresikan diri melalui karya seni rupa
Akses di Dalam Kampus UKM Tidak perlu ID dan Password Portal e-Jurnal.
BERSUCI /THAHARAH Apipudin, MA.Hum MASJID AN-NABAWI BANJAR WIJAYA (CIPONDOH, TANGERANG) 17 NOPEMBER 2014 KAJIAN SETELAH SUBUH.
Langkah 1 : login
16/04/20152D MEH untuk Aliran Air Tanah1 Kasus Aliran 2D 1. Aliran air tanah 2. Aliran permanen.
C. SEGI BANYAK BERATURAN
RITA APRILLIA A.04 “STATISTIKA DESKRIPTIF”
Perencanaan Underpass Jalan Masuk Gandaria City
FKIP AKUNTANSI UMS 1. Pengertian Bank 2. Fungsi Bank 3. Jenis dan Bentuk Bank 4. Produk Bank.
pejelasan  1.air yang ada di laut,di daratan, di sungai, di tanaman dan kemudian akan menguap ke angkasa dan kemudian akan menjadi awan, dalam keadaan.
Aplikasi Termodinamika Menggunakan Tabel XSteam.
REKAYASA FONDASI I PERTEMUAN III TEKANAN TANAH LATERAL PADA DPT Oleh :
B A B IV Data Kualitatif maupun Data Kuantitatif harus disajikan dalam bentuk yang ringkas dan jelas Salah satu cara untuk meringkas data adalah dengan.
DO NOW #21.5 On a separate sheet of paper, use the ladder method and convert the following: m = ______ cm cm = ______ mm kL = ______.
BEBAN DI PERMUKAAN TANAH
Introduction to Accounting Name:. The Basic Accounting Equation Write the equation here. Use Video 1.
Accounting Unit. MSBCS-BCSIII-5: The students will examine basics of accounting. a) Define credits and debits. b) Identify account types (assets, liabilities,
Trial Balance. The information for ledgers comes from balance sheets. -This means it is already in balance. As you make changes to the Ledger, it is possible.
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
Today’s Weather. What causes the weather? 4F53-B998-E6D91AE43323&blnFromSearch=1&productcode=US.
CENTURY 21 ACCOUNTING © Thomson/South-Western 1 LESSON 8-1 Chapter Eight-Recording Adjusting And Closing Entries For A Service Business Objectives: Define.
Unknown Solids Lab Observation Sheet √ Physical Properties Materials: 5 solids (A, B, C, D, E)scoopula glass square Procedure: 1. Using a scoopula, transfer.
What do we call these things? 6 Atoms which happen to be of 3 different elements.
© 2000 South-Western Educational Publishing SUPPLIES ADJUSTMENT ON A WORK SHEET Label the two parts of this adjustment with a small letter a in parentheses,
National Park Vincent Brito. Location  Rocky Mountains  Region-West  State-Colorado Capital-DenverCapital-Denver  Longitude °w4  Latitude-40.4°n.
CENTURY 21 ACCOUNTING © Thomson/South-Western LESSON 6-1 Creating a Worksheet.
Electronic Waste = e-Waste
Bamboo Roofing Sheets.
LESSON 6-1 Creating a Worksheet
Extending Financial Statement Information on a Work Sheet
ANSWER SHEET LISTENING (PartⅠ~ Ⅳ) READING (PartⅤ ~ Ⅶ) NO
EXTENDING BALANCE SHEET ACCOUNT BALANCES ON A WORK SHEET
OLEH : FATIMA SARI RITONGA FISIKA 2014.
POMPA & KOMPRESOR) Desain Impeller Marfizal, ST, MT.
Trigonometri 6 February 2010 chris2ade.wordpress.com
Hydrology Engineering IR HERMONO S. BUDINETRO, M. ENG
KEBUTUHAN AIR TANAMAN PENGENALAN SISTEM IRIGASI BENDUN G SALURAN PEMBAWA BANGUNAN BAGI S U N G A I SALURAN INDUK S ALURAN SEKUNDER BOKS TERSIER KE SAWAH.
ORTHOGRAPHIC PROJECTION 1
1. A flow in permeable layer of soil like figure below
انواع المخاليط (التدريس الابداعي )
اصول گودبرداری و ایمن سازی
Extending Financial Statement Information on a Work Sheet
LESSON 6-1 Creating a Worksheet
LESSON 6-1 Creating a Worksheet
LESSON 6-3 Extending Financial Statement Information on a Work Sheet
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
LESSON 6-1 Creating a Worksheet
Balance Sheet Accounts
Subbasin Loss Methods HEC-HMS.
ACCOUNTING I Chapter 4 Assignment Sheet
Represented By:. “Provides Professional Services in Power Supply & Air Conditioning Business” PRESENT AGENDA.
Extending Financial Statement Information on a Work Sheet
HISTORY OF THE EARTH ANSWER SHEET
LESSON 6-1 Creating a Worksheet
Extending Financial Statement Information on a Work Sheet
This is my sheet And this is my sheet.
Presentation transcript:

REMBESAN Pada sheet pile (Turap)/ bawah tubuh bendung (solid dam) Lapisan kedap air

Contoh he = 10m Lap. Kedap air Berapa debit alirannya, jika diketahui K = 0,085 m/det.

REMBESAN 2. Pada tubuh bendung Ket : K = permeabilitas tanah (hydraulic conductivity)

REMBESAN 2. Pada tubuh bendung Koreksi air keluar dari bendung Ket : K = permeabilitas tanah (hydraulic conductivity)  = sudut kemiringan tubuh bendung

REMBESAN 2. Pada tubuh bendung Koreksi air masuk ke bendung Ket : K = permeabilitas tanah (hydraulic conductivity)  = sudut kemiringan tubuh bendung

REMBESAN 3. Pada tanggul sungai Ket : K = permeabilitas tanah (hydraulic conductivity) L = lebar tanggul