Installation of the new end mirror 1Frans Mul - July 2008
The goal, a new mirror Mirror 140 mm replaces mirror 80 mm in the I.M.C. 2Frans Mul - July 2008
Index New design New marionette New mirror New recoil mass New gear box New installation tool Balancing Electrical test Installation in the I.M.C. end tower Numbers Future improvements 3Frans Mul - July 2008
New design New design Design by: Roma 1 and Nikhef 8 July 2008Frans Mul - A new design of the marionette and gear box due to a larger mirror ( 140 mm) and Reaction Mass. - The pitch between the wires from the mirror measures140 mm. - The pitch between the wires from the RM measures190 mm. - The mirror and RM range for- and backward is 55 mm. 55 mm 190 mm 140 mm
New marionette New marionette Frequency results by: Paola, Eric Pre design 5Frans Mul - July 2008
center of gravity New marionette New marionette Center of gravity Compensation ring for a heavy gear box Gear box with the contra tungsten mass 6Frans Mul - July 2008
New marionette New marionette Machining by: Willem 7Frans Mul - July 2008 Start with 200 kg After machining 75 kg ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand
New marionette New marionette Wiring by: Vincenzo, Fabio, Francesco, Rodolphe 8Frans Mul - July 2008
New mirror New mirror Installation by: Michele, Paola 8 July 2008Frans Mul - From the container to the installation tool and vacuum clamp. The front and back side of the mirror is covered with a protection foil. Technical details Beautiful, no scratching !
New recoil mass New recoil mass Vertical balancing: by Paola Old recoil mass New recoil mass center of gravity 10Frans Mul - July 2008
New gear box What is new ? The pitch between the wires The bearings, ceramic and linear The self-brake wire stretchers The end stops The tungsten contra mass The 55 mm for- and backward range old 11Frans Mul - July 2008 Self-brake wire stretcher
New gear box New gear box Wiring by: Francesco, Fabio, Rodolphe 8 July 2008Frans Mul -
New installation tool Gear box R.M. X-Y-Z Translation units Mirror X-Y-Z Roll, yaw, pitch Translation units Frame Mirror vacuum clamp unit 13Frans Mul - July 2008
14Frans Mul - July 2008 mass = mass New installation tool Installation tool by: Nikhef Tungsten contra mass Mirror and reaction mass
New installation tool New installation tool Wiring by: Paola Mirror vacuum clamp 15Frans Mul - July 2008 Steel wires 0.2 mm 8 mm
8 July 2008Frans Mul - New installation tool New installation tool Wiring by: Paola, Michele Peeling the protection foil With out the compensation ring detail
Balancing Balancing Horizontal at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a water level 0.05 mm / m Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. During this procedure the safety belts where taken off! 17Frans Mul - July 2008
Balancing Balancing Vertical at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a theodolite. Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. 18Frans Mul - July 2008
Electrical test Electrical test Trim mass test in the marionette by: Vincenzo, Fabio Tungsten Trim mass Open contact Each switch has been tested for 30 times in open and closed position 30x End switch with kapton isolation 19Frans Mul - July 2008 Small modifications by Paul
30x Electrical test Electrical test Gear box test by: Vincenzo, Fabio 20Frans Mul - July 2008 Each switch has been tested for 30 times in open and closed position.
Installation in the I.M.C. end tower Highway to building ………. 8 July 2008Frans Mul - The road Road test Marionette on the road
Installation in the I.M.C. end tower Marionette by: Franco, Jo 8 July 2008Frans Mul - Modification marionette lifting tool The marionette on his way The marionette on his wire
Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul -
Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul -
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco, Michele 8 July 2008Frans Mul - After the mirror installation the safety structure is mounted.
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - Each switch has been tested in open and closed position. The mirror and RM is moved 55 mm for- and backwards.
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - It looks like the design !
Installation in the I.M.C. end tower Installation in the I.M.C. end tower mirror end reaction mass 8 July 2008Frans Mul - Tuesday 01 July 2008 The MC tower bottom part has been finally closed and at about 12:15 AM (local time) the pumping system started the tower evacuation. The protection film of the MC mirror has been successfully removed.
Numbers Marionette mass inclusive: Top mass, 2 trim mass 2 moveable trim mass Mounting parts Sub. Total mass: 99.93kg Exclusive wires, mounting strips en bolds for the wires. Gearbox mass: 4.75kg Contra mass: 13.67kg Exclusive wires. Sub. Total mass: 18.42kg Mirror mass: 1.61kg Inclusive magnets. Reaction mass inclusive: Coils Coil holders Front ring Mounting parts (bolds) Sub. Total mass: 14.16kg Total mass < kg 29Frans Mul - July 2008 Mirror 140 mm thickness 45 mm. The mirror and RM range for- and backward is 55 mm. Wires for the mirror and RM are 0.2 mm steel. Marionette material: ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand
Future improvements 8 July 2008Frans Mul - Modify transport lorry. Modify entrances off the buildings. Shock sensors during transport. Fixation tool for stabilize recoil mass and mirror in the tower on the safety structure. All the drawings will be prepared in Amsterdam and send to Cascina.
Installation of the new end mirror 31Frans Mul - July 2008 E N D