Installation of the new end mirror 1Frans Mul - July 2008.

Slides:



Advertisements
Similar presentations
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
Ejection module is the last mechanism in KOMBIS TMM8003. It is designed to eject the ready tube from machine.
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
Welcome Customer ENZFELDER GMBH Transmission- and Lifting Systems.
STATESMAN Campers, Raising the standards. STATESMAN XP- 2.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
EPFL, Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Drilling machine.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
TP4-ENERSOL-TD/PV double function
Old Main. Finalized Process Plans  Front Face Process Plan.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Motors, bearings & Sensors By Peter Lau. Disc 2 Disc 1 Dummy Disc Disc 5 Disc 3 Disc 5 Motor A Motor B Motor C.
INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD The National Institute for Nuclear Physics and High Energy Physics Kruislaan SJ Amsterdam PO Box.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Cavendish: Additional Procedures. Centering First, center front-to-back pitch. This can be done by adjusting the front knob. This should be done carefully,
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G Z.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
1 Paola Puppo Last Stage Suspension Mechanics in Virgo+MS Piacciavi, generosa Erculea prole, ornamento e splendor del secol nostro, Ippolito, aggradir.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
UNIT II WIND ENERGY COLLECTORS
Baby-MIND Modules & Services
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
End of Line “Pass Through” Conveyor
VIRGO–KAGRA Meeting about bottom filter damping
IR Detector - Test cryostat : Machining
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Extension SR1 WP3 Electrical installations
Cryostat design Mechanical design: Thermal screens: Specifications:
RESCUE BOAT DAVIT CME Models: D & D
LCLS-II SPQA Magnet Leads Soldering
Module/Ladder Assembly
INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD
MASATS Door Systems.
November technical stop activities:
Presentation transcript:

Installation of the new end mirror 1Frans Mul - July 2008

The goal, a new mirror Mirror  140 mm replaces mirror  80 mm in the I.M.C. 2Frans Mul - July 2008

Index  New design  New marionette  New mirror  New recoil mass  New gear box  New installation tool  Balancing  Electrical test  Installation in the I.M.C. end tower  Numbers  Future improvements 3Frans Mul - July 2008

New design New design Design by: Roma 1 and Nikhef 8 July 2008Frans Mul - A new design of the marionette and gear box due to a larger mirror (  140 mm) and Reaction Mass. - The pitch between the wires from the mirror measures140 mm. - The pitch between the wires from the RM measures190 mm. - The mirror and RM range for- and backward is 55 mm. 55 mm 190 mm 140 mm

New marionette New marionette Frequency results by: Paola, Eric Pre design 5Frans Mul - July 2008

center of gravity New marionette New marionette Center of gravity Compensation ring for a heavy gear box Gear box with the contra tungsten mass 6Frans Mul - July 2008

New marionette New marionette Machining by: Willem 7Frans Mul - July 2008 Start with 200 kg After machining 75 kg ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand

New marionette New marionette Wiring by: Vincenzo, Fabio, Francesco, Rodolphe 8Frans Mul - July 2008

New mirror New mirror Installation by: Michele, Paola 8 July 2008Frans Mul - From the container to the installation tool and vacuum clamp. The front and back side of the mirror is covered with a protection foil. Technical details Beautiful, no scratching !

New recoil mass New recoil mass Vertical balancing: by Paola Old recoil mass New recoil mass center of gravity 10Frans Mul - July 2008

New gear box What is new ? The pitch between the wires The bearings, ceramic and linear The self-brake wire stretchers The end stops The tungsten contra mass The 55 mm for- and backward range old 11Frans Mul - July 2008 Self-brake wire stretcher

New gear box New gear box Wiring by: Francesco, Fabio, Rodolphe 8 July 2008Frans Mul -

New installation tool Gear box R.M. X-Y-Z Translation units Mirror X-Y-Z Roll, yaw, pitch Translation units Frame Mirror vacuum clamp unit 13Frans Mul - July 2008

14Frans Mul - July 2008 mass = mass New installation tool Installation tool by: Nikhef Tungsten contra mass Mirror and reaction mass

New installation tool New installation tool Wiring by: Paola Mirror vacuum clamp 15Frans Mul - July 2008 Steel wires  0.2 mm 8 mm

8 July 2008Frans Mul - New installation tool New installation tool Wiring by: Paola, Michele Peeling the protection foil With out the compensation ring detail

Balancing Balancing Horizontal at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a water level 0.05 mm / m Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. During this procedure the safety belts where taken off! 17Frans Mul - July 2008

Balancing Balancing Vertical at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a theodolite. Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. 18Frans Mul - July 2008

Electrical test Electrical test Trim mass test in the marionette by: Vincenzo, Fabio Tungsten Trim mass Open contact Each switch has been tested for 30 times in open and closed position 30x End switch with kapton isolation 19Frans Mul - July 2008 Small modifications by Paul

30x Electrical test Electrical test Gear box test by: Vincenzo, Fabio 20Frans Mul - July 2008 Each switch has been tested for 30 times in open and closed position.

Installation in the I.M.C. end tower Highway to building ………. 8 July 2008Frans Mul - The road Road test Marionette on the road

Installation in the I.M.C. end tower Marionette by: Franco, Jo 8 July 2008Frans Mul - Modification marionette lifting tool The marionette on his way The marionette on his wire

Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul -

Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul -

Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco, Michele 8 July 2008Frans Mul - After the mirror installation the safety structure is mounted.

Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - Each switch has been tested in open and closed position. The mirror and RM is moved 55 mm for- and backwards.

Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - It looks like the design !

Installation in the I.M.C. end tower Installation in the I.M.C. end tower mirror end reaction mass 8 July 2008Frans Mul - Tuesday 01 July 2008 The MC tower bottom part has been finally closed and at about 12:15 AM (local time) the pumping system started the tower evacuation. The protection film of the MC mirror has been successfully removed.

Numbers  Marionette mass inclusive:  Top mass,  2 trim mass  2 moveable trim mass  Mounting parts  Sub. Total mass: 99.93kg   Exclusive wires, mounting strips en bolds for the wires.   Gearbox mass: 4.75kg  Contra mass: 13.67kg  Exclusive wires.  Sub. Total mass: 18.42kg   Mirror mass: 1.61kg  Inclusive magnets.   Reaction mass inclusive:  Coils  Coil holders  Front ring  Mounting parts (bolds)  Sub. Total mass: 14.16kg   Total mass < kg 29Frans Mul - July 2008 Mirror  140 mm thickness 45 mm. The mirror and RM range for- and backward is 55 mm. Wires for the mirror and RM are  0.2 mm steel. Marionette material: ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand

Future improvements 8 July 2008Frans Mul -  Modify transport lorry.  Modify entrances off the buildings.  Shock sensors during transport.  Fixation tool for stabilize recoil mass and mirror in the tower on the safety structure.  All the drawings will be prepared in Amsterdam and send to Cascina.

Installation of the new end mirror 31Frans Mul - July 2008 E N D