PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI 02. 04. 2009.

Slides:



Advertisements
Similar presentations
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Advertisements

Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro HIM / Mainz University OLYMPUS Collaboration.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
R 3 B Gamma Calorimeter H. Alvarez Pol – R 3 B Gamma Calorimeter NUSTAR Calorimeter WG – Valencia 17/06/05 H. Alvarez Pol, D. Cortina, I. Durán GENP –
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Superconducting Large Bore Sextupole for ILC
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Mapping separation power Klaus Götzen GSI Darmstadt PID TAG Meeting 15. Feb
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Maximum Areas in HPK Rule (ATLAS internal only) Y. Unno (KEK) 2015/1/13, 2015/4/8 updated, Y. Unno1.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
J.RItman PANDA Collab. Meeting, May 2003 Status of the PANDA Simulations Event Generator UrQMD p A MVD Resolution Time of Flight Estimates of Data Rates.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
“CENTRAL SUPPORT FRAME” -
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
A study on Fatigue Strength for Tank Structures subject to
Stephan Aulenbacher MAGIX Collaboration Meeting
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
General remarks about the HESR and PANDA vacuum system
Work progress in Turin x the MVD
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
PANDA Mechanical Design
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
LumiCal mechanical design, integration with LDC and laser alignment
Update on mechanical structure for the ENDCAP calorimeter
Integration issues at IHEP
EMC BWE PANDA Insertion
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
New Design for Beam Test Structure
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
An alternative forward endcap calorimeter design
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
SuperB Integration Summary of previous integration sessions.
Option 1: Reduced FF Quad Apertures
Presentation transcript:

PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop2 Backward Endcap EMC 1.– Requirements - Boundary Conditions - Dimensions 2.– Geometry & Setting - Geometry - Interaction with STT - Interaction with MVD - Interaction with Beam Pipe 3.- Next Step - Fixing in the Assembly 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop3 Backward Endcap EMC Distance Target-BW Endcap560 mm Maximum Outer Radius448 mm Minimum Inner Radius150 mm Boundary Conditions 1.– Requirements - Boundary Conditions - Dimensions 2.– Geometry 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop4 Backward Endcap EMC Crystals DimensionsStraight Geometry Length 200 mm Face 24,4x24,4 mm (barrel smallest back face crystal) Picture 1.– Requirements - Boundary Conditions - Dimensions 2.– Geometry 3.- Next step 4.- Summary Dimensions Straight Geometry: 0,6284 str

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop5 Backward Endcap EMC 2.– Geometry & Setting

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop6 Backward Endcap EMC Geometry 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary 540 Crystals 424 Crystals 488 Crystals

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop7 Backward Endcap EMC Interaction with the STT (I.a) Ring: Same volume 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop8 Backward Endcap EMC Interaction with the STT (I.b) Carbon Fibre Tray Fulfils the STT Cabling requirements 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop9 Backward Endcap EMC Interaction with the STT (II.a) Different Outlet 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop10 Backward Endcap EMC Interaction with the STT (II.b) Carbon Fibre Tray Fulfils the STT Piping requirements 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop11 Backward Endcap EMC Interaction with the STT (III) 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop12 Backward Endcap EMC Interaction with the MVD Space Beam Pipe-BW Endcap mm 2 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop13 Backward Endcap EMC Interaction with the Beam Pipe (I) Maximum Angle from the Target 17,17º 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary First Crystal starts at R183,50 mm (z=-594)

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop14 Backward Endcap EMC Interaction with the Beam Pipe (II) Beam Pipe Flange 1100 mm from the Target 1.– Requirements 2.– Geometry & Setting - Geometry - Interaction STT - Interaction MVD - Interaction Beam Pipe 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop15 Backward Endcap EMC 3.– Next Step

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop16 Backward Endcap EMC Fixing in the Assembly Hold the Endcap in 4 or 8 Points in the Backward DIRC Support Ring 1.– Requirements 2.– Geometry & Setting 3.- Next step - Fixing the Assembly 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop17 Backward Endcap EMC Geometry: Cutting in 4 sides (up-down-left-right) Space for the STT (Cabling & Piping): Enough Space for the MVD (Cabling & Piping): To Discuss Angle for the Beam Cone: 17,17º Maximum Fixing: In the Backward DIRC Support Summary 1.– Requirements 2.– Geometry & Setting 3.- Next step 4.- Summary

02/04/2009David Rodríguez Piñeiro - GSI Darmstadt - Mechanical Workshop18 Backward Endcap EMC Personal Contact: Tel: +49 (0) /1634 www-panda.gsi.de Thank you!