CTA Reunion de groupe LAPP, 01-12-2014. 23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test CSS / dish interface part Prototypes.

Slides:



Advertisements
Similar presentations
CONSTRUCTION DE LA SPIRALE DOR. Construire un rectangle dor L1 = 18,3 cm l 1 = 11,3 cm.
Advertisements

Strip me Strip me. Which clothing would you like me to remove?
Verrouillage électromagnétique pour le BWS Electromagnetic brake for the BWS.
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1. Start with Kit of Parts Original kit of parts New carbon fiber (CF) parts Flexure elements Links Steel triangles Steel faceplate Polyester flexure 2.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Walls crates cables gas chambers electronics CERN adb.
M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 >1 m 2 metallic mirror technology AIM find a suitable technology for large reflecting.
Engineering Design Review for TRD-Readout Chamber
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Hamburg - Opera Collaboration Meeting - June 2004 Fiducials & labels F.Laudisio,G.Romano,C.Sirignano Salerno Emulsion Group.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Slide 1 of 23 Community news Slide 2 of 23 Nouvelles de la communauté…
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
ipno.in2p3.fr Badesi - Sardinia - May 2006IPNO-RDD-Jean Peyré1 1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré Badesi - May.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
Application: Telecommunications Electronics Housing Functional Requirements: Magnetic isolation, heat dissipation, easy assembly Competing Technologies:
18/07/2005 S. Rangod PH/DT1 1 CNGS HORN Mini-review induced by the break of the insulating glass disk.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Florian Buchsteiner (HEPHY Vienna)
Baby-MIND Modules & Services
Plan for the installation of the TAMU screen
ATF2: final doublet support
ALICE PD group meeting Andrea Francescon.
Integration issues at IHEP
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
DOM integration meeting
IFR detector mechanics
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Dan Peterson: News on Advanced Endplate Mechanics
Business opportunities related to CERN electrical network
Module/Ladder Assembly
NPS mechanical design 11/13/2018 Jlab meeting
as a prototype for Super c-tau factory
Presentation transcript:

CTA Reunion de groupe LAPP,

23/09/2014 Catania MeetingG. Lamanna 2 Prototypes waiting for test CSS / dish interface part Prototypes built by Lorima since May Consecutive tube junction Waiting for test slot Each month lost is less time for improvements in case on non positive test conclusion ?

23/09/2014 Catania MeetingG. Lamanna 3 Les surprises du prototype manchon Pincement du manchon lors de son ouverture Largeur de rainure longitudinale insuffisante Au serrage contact sur lèvres du manchon Pincement du manchon lors de son ouverture Un petit usinage maison grâce à Laurent et hop dans la caisse !

CSS / dish interface part

Consecutive tube junction

23/09/2014 Catania MeetingG. Lamanna 6 Final definition of details  Cables and pipes supports defined Glass fiber part glued on CSS Electrical cables fixation Cooling pipes fixation  Teflon plate supports defined Glass fiber part glued on Camera frame 400mm x 600 mm reflector foreseen

> 3140 mm 3140 mm 800 mm Camera frame : Key values Camera frame deformation parking position) Shiming parking position) Rails mounting parking position)

1 - Turn to focus 2- Turn to clamp in desired position Carlos’ slide (Padova) Carlos Diaz’s rail system La définition de la fixation de la camera dans le frame a convergé

Carbon fibers structure are very sensitive to shocks : CF tubes are monolithic and thick : limited worry CF ropes are 10mm Φ and of prime importance : be careful ! Camera frame CF skins are extremely thin : be very careful !! Extreme care & protections are needed during maintenance ! Worries about shocks on CF parts Possibilité de réaliser des test expérimentaux à l’étude actuellement

23/09/2014 Catania MeetingG. Lamanna 10 Mounting : Civil work & tooling  Installation procedure on site will require :  CSS elements assembly on ground  Lifting of complete CSS  Installation on dish Mounting area close enough to mounted dish Indeed : crane cannot move once CSS is lifted ! crane Civil work to be foreseen for trestel fixation LAPP is going to start studying transportation and mounting tooling end of this year

23/09/2014 Catania MeetingG. Lamanna 11 Access tower definition Mounting area close enough to mounted dish Indeed : crane cannot move once CSS is lifted ! LAPP is going to start studying transportation and mounting tooling end of this year

23/09/2014 Catania MeetingG. Lamanna 12 Access tower definition

23/09/2014 Catania MeetingG. Lamanna 13 Access tower definition