Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para a Bienal 2006 Rio de Janeiro, 01/08/2006.

Slides:



Advertisements
Similar presentations
Requirements Based Evaluation of BPL for Power System Sensing, Command and Control Applications Erich W. Gunther EnerNex Corporation
Advertisements

EDF R&D CIM for DA Status, Feedback & Challenges.
Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell Missouri Public Service Commission.
1 Process Control and Data Acquisition Systems CM4120 Chemical Plant Operations January 2006.
Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para o Colóquio de Madri 2007 Rio de Janeiro, outubro/07.
Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para o Colóquio de Madri 2007 Rio de Janeiro, outubro/07.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Frankfurt (Germany), 6-9 June 2011 José Gonzalo – Spain – Session 3 – Paper 0422 ‘MINIMUM COMMON SPECIFICATION FOR SUBSTATION PROTECTION AND CONTROL EQUIPMENT.
Rejuvenated MiCOM P40 Double the practicality
Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para a Bienal 2006 Rio de Janeiro, 31/julho/2006.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
Understanding the IEC Standard 李嘉凱 指導教授:柯開維.
Hanover-Fair 2002 IEC The world-wide standard for communication in substations HM IEC   Substation Protocols Benefits Customer.
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
Team Dec13_11: Cole Hoven Jared Pixley Derek Reiser Rick Sutton Adviser/Client: Prof. Manimaran Govindarasu Graduate Assistant: Aditya Ashok PowerCyber.
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
Collaboration Oriented Architecture COA Position Paper An Overview Adrian Seccombe Board of Management, Jericho Forum ® CISO & Snr Enterprise Information.
Steven A. Kunsman (USA) CIGRE Study Committee B5 Preferential Subject 2 Specification and Evaluation of Substation Automation Systems Session Summary Steven.
Customized instruction-sets for embedded processors Fisher, J.A. Design Automation Conference, Proceedings. 36th, 1999, Page(s): speaker:
Business Data Communications Chapter Six Backbone and Metropolitan Area Network Fundamentals.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Finding Protection Cycles in DWDM Networks 2002 IEEE ICC on Volume 5, 28 April-2 May Page(s): Reporter: Jyun-Yong Du.
CMMI Overview Quality Frameworks.
Project Risk Management EECS811: IT Project Management Presenter: Gavaskar Ramanathan.
In Focus-I & R Excellence Quality, Training, & Coaching-Best Practices for I & R Contact Centers Amy Latzer Chief Operations Officer Alliance of Information.
© ABB - Page 1 IEC in ABB CIGRE © ABB - Page 2 IEC and ABB The IEC61850 in SA will be a comprehensive solution for the entire SA domain.
© ABB - Page 1 Long lifetime guaranteed for IEC Designed for the future... SCL ACSI APP COM.
Network Topologies.
A N OPTIMAL RELIABILITY ALLOCATION METHOD FOR DIGITAL SUBSTATION SYSTEMS Y UZHOU H U, P EICHAO Z HANG, Y ONGCHUN S U, Y U Z OU Adviser: Frank, Yeong-Sung.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Enterprise Systems & Architectures. Enterprise systems are mainly composed of information systems. Business process management mainly deals with information.
A Digital Age Skill for All [space for presenters name, organization]
1 Toronto, Ontario - October 31 and November 1, 2002 October 31, 2002 David Dern Technology Roadmap for Intelligent Buildings Marketing Director Continental.
Instituto de Investigaciones Eléctricas
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
INTERNATIONAL ELECTROTECHNICAL COMMISSION © IEC:2007 PC118 WG1 Draft Framework China PC 118/WG1 Meeting, , Santa Clara.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
IEEE Globecom 2010 Tan Le Yong Liu Department of Electrical and Computer Engineering Polytechnic Institute of NYU Opportunistic Overlay Multicast in Wireless.
Security Patterns in Wireless Sensor Networks By Y. Serge Joseph October 8 th, 2009 Part I.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Large-Scale Enterprise GIS Systems.
Manjula Dewadasa Arindam Ghosh Gerard Ledwich
Ordering Tool Guideline
Optimization of Wavelength Assignment for QoS Multicast in WDM Networks Xiao-Hua Jia, Ding-Zhu Du, Xiao-Dong Hu, Man-Kei Lee, and Jun Gu, IEEE TRANSACTIONS.
© Copyright year ABB. All rights reserved BSE033264R0001, Industrial IT for improved productivity.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
Doc.: IEEE /0121r1 Submission January 2010 Craig Rodine, Electric Power Research InstituteSlide 1 Some High-Level Smart Grid Requirements Date:
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
2D/3D Integration Challenges: Dynamic Reconfiguration and Design for Reuse.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Chapter 11 Extending LANs 1. Distance limitations of LANs 2. Connecting multiple LANs together 3. Repeaters 4. Bridges 5. Filtering frame 6. Bridged network.
Klaus-Peter Brand Switzerland PS2-Q8 : Migration This question refers to migration scenarios or procedures. Migration is very individual depending.
Loop-Free Updates of Forwarding Tables Author : Jing Fu, Peter Sjödin and Gunnar Karlsson Publisher : IEEE Transactions on Network and Service Management.
ARTEMIS SRA 2016 Trust, Security, Robustness, and Dependability Dr. Daniel Watzenig ARTEMIS Spring Event, Vienna April 13, 2016.
Latency and Communication Challenges in Automated Manufacturing
Selected ICT-based Wide-Area Monitoring Protection and Control Systems (WAMPAC) applications
An array-based study of increased system lifetime probability
CMMI Overview Quality Frameworks.
Network Innovation Allowance Project: South East Smart Grid
ISO New England System R&D Needs
Outline Introduction Switchgear Modeling in IEC 61850
Anne Pratoomtong ECE734, Spring2002
Praesideo Cobranet Interface
Experience in Network Management and Automation, since 1980
Srinivas Aluri Jaimin Mehta
Collaboration Oriented Architecture COA Position Paper An Overview
Northern States Power Company
Presentation transcript:

Cigré/Brasil CE B5 – Proteção e Automação Seminário Interno de Preparação para a Bienal 2006 Rio de Janeiro, 01/08/2006

Dados do Artigo Número  101 Título  IEC Impact on Substation Automation Products and Architectures Autoria  Luc Hossenlopp – AREVA  E. Guimond – SNC-Lavalin País  França/Canadá

Objetivo The aim of this paper is to analyze the example of one of the initial projects developed according to the IEC standard and have a look on what this is practically changing in term of products and architecture of the substation automation system. The example is then generalized with the observations made on other projects in order to outline some general guidelines when using this technology.

Objetivo The project in example consisted in a new 400kV GIS substation connected to a combined cycle power plant on one side and to the Algerian transmission grid on the other side (04 Geradores e 02 Saídas de Linhas). Some of the constraints and challenges included: -Use and integrate qualified protection relays. -Link with the Power Plant control system by a fully redundant IEC link. -Engineer the project within 6 months from order to Factory Acceptance Tests, this was completed in january/2005.

Objetivo Diagrama Unifilar:

Objetivo Products: The system is made of IEDs from five different suppliers with different communication capabilities. The requirement for qualified protection and metering IEDs has lead to the use of legacy communication protocols for some of the products since they were not available on IEC when the project started.

Objetivo Logical Architecture (Not Physical Architecture):

Destaque Redundancy A more delicate question concerns the management of the link redundancy. This is not defined by the standard and several solutions are currently proposed. The reconfiguration performance in case of a failure of the main link is the key issue: few solutions enable to stay compatible with the “4 ms” transfer time (traditional reference when assessing performance for substation communications) between IEDs. For instance the fast spanning tree is an algorithm defined by the IEEE 803.2w standard to reach real time performance, however its current implementation does not respect this constraint with a typical architecture made of a ring with 20 different switches.IEC

Dúvidas 1. Qual o resultado dos Testes de aceitação em fábrica e campo? 2. Foi realizado testes de avalanche e qual foi a sua performance?

Conclusões IEC is a very exciting technology possibly driving a lot of innovations. One needs to pay attention that this is still a young one (thus theory and reality might differ) and more importantly that this is only a base for the definition of a system. It will naturally reinforce the need for a robust system design (architect mission) and the use of more advanced engineering tools (configuration, simulation).

Respostas às questões do REP Perguntas: