Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR) USP-IAG Universidade de São Paulo 18-19th June 2008 Team Management (Claudia & Keith)

Slides:



Advertisements
Similar presentations
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Structural and Functional Integration for Power Converters To investigate the application of advanced manufacturing techniques to the fabrication and automated.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 iBTF module Prototyping Version.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 FEA Analysis Summary Version.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 BTFI Data Reduction (Keith.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
+ International Research Experience for Undergraduates Brazil SUNY Oswego Advisor: Dr. Shashi Kanbur SUNY Geneseo Alex James & Eamonn Moyer.
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
Onboard Data Processing Units
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Etalon Controller (Luiz Cavalcanti/Jean-Luc.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
Jun 4, 2008 Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Claudia Mendes.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t D e s i g n L a b o r.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Software Giseli Ramos.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 SOAR Preliminary Interface.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Using a Project Model for Assessment of CDIO skills Tomas Svensson, Svante Gunnarsson Linköping University Sweden June
Micro and Nanosystems IST Programme Call Micro/nano based subsystems Francisco J. Ibáñez European Commission
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 BTFI Optics (Keith Taylor)
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
PANIC Near-infrared camera 3.5m CAHA (0.45”/pixel) 2.2m CAHA (0.23”/pixel) Matilde Fernandez IAA, CSIC.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Julian David Rodriguez Javier.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Requirements Flow-down (Keith.
Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Volume-Phase Holographic Gratings Modelling Brazilian Tunable Filter.
Event Name mm/dd/yyyy Luiz Cláudio de Oliveira Pereira National Institute of Metrology, Standardization and Industrial Quality Inmetro - Brazil MARKET.
Sistemas de Información Agosto-Diciembre 2007 Sesión # 9.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
VirtuLab: Web Based Flow Visualization Facility Midpoint Review Team 6 Members: Justin Scott Karen Davis Sydni Credle Mentor/Client: Professor: Dr. Shih.
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Fernando Luís Fontes Emulator.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Camera PDR/CD1 Planning 19 September 2008
SOAR Data Reduction Pipelines
Jim Fast Pacific Northwest National Laboratory
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Welcome ! Capstone Design Lab is a newer 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
WBS 1.03 Readout Systems Scope, Cost and Schedule
Integration & Commissioning
DES Blanco602 Opto-Mechanics
ELENA tune measurement
PHI Status Report SO Cleanliness Working Group #24
10/month is the present production rate 2 FTE + sporadic contributions
USP-IAG Universidade de São Paulo
2K CB FDR Overview:  Agenda, Charge, Review Process
ChE 473K Plant Design R. Bruce Eldridge.
. - t !!l t. - 1f1f J - /\/\ - ' I __.
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
Electronics Contract Manufacturing Service Topscom provide an extensive turnkey electronics manufacturing service range of fabrication, engineering and.
USP-IAG Universidade de São Paulo
The ASTRI Camera for the Pathfinder
Progress in the ITER Neutral Beam Test Facility
Evaluate the integral {image}
Presentation transcript:

Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR) USP-IAG Universidade de São Paulo 18-19th June 2008 Team Management (Claudia & Keith) Version 1.0

BTFI Team Management BTFI phases: – Design Post-PDR to final specifications and drawing set – Fabrication – Assembly, Integration & Test – Commissioning

BTFI Core Team (in no particular order!) Claudia Mendes de Oliveira (CMdO – IAG/USP) Keith Taylor (KT - contracted) Rene Laporte (Rene - INPE) Fernando Laurenco (FL – INPE) Cesar Strauss (CS – INPE) Luiz Reitano (Reitano – INPE) Antonio Cesar de Oliveira (ACdO – LNA) Fernando Fontes (FF – contracted) Dani Guzman (Dani – contracted: AstroInventions) Giseli Ramos (Giseli – IAG/USP) Bruno Quint (Bruno – IAG/USP) Luiz Cavalcanti (Luiz – IAG/USP) Javier Ramirez Fernandez (Javier – USP) Antonio Kanaan (AK – UFSC) Fabricio Ferrari (FFe – U. Santa Maria)

Design Phase Responsibilities Optical – Final iteration with manufacturers (DJ – subcontract) – Placing orders IAG) Opto-Mechanical – Design (Rene + INPE) – Drawings (FL + INPE) Instrument Control Electronics – Design (Denis + INPE) Detector Controller – Design (Olivier – PhotonEtc sub-contract) – Comms PCB & Power Supply (Denis + INPE) FP Controller – Design (Jean-Luc Gach + LAM) Software – Instrument Control (Giseli + IAG) – CCCP-v2 (Olivier U.Montreal + IAG) – OtF to Pipeline DR (CMdO + KT + IAG + AK + UFSC/USM )

Fabrication Phase Responsibilities Optical – Managing procurement (KT) Opto-Mechanical – Fabrication (eg: MetalCard and/or Proteo) Instrument Control Electronics – Fabrication (Denis + INPE) Detector Controller – Fabrication (PhotonEtc) – Comms PCB & Power Supply (Brazilian Industry) FP Controller – Fabrication LAM) Software coding – Instrument Control (Giseli + IAG) – CCCP-v2 (Olivier U.Montreal + USP) – OtF to Pipeline DR IAG + AK + UFSC/USM)

AI&T Phase Responsibilities Optical – Evaluation & acceptance testing + I&T (KT + Rene + LNA?) Opto-Mechanical – Acceptance (Rene + Reitano - INPE) – I&T (Rene + Reitano + INPE or LNA) Instrument Control Electronics – Test (Denis + CS) Detector Controller – Debug and evaluate (Dani – sub-contract to AI) – Test USP + Dani) FP Controller – Debug, evaluate and test IAG) Software test & debug – Instrument Control (Giseli + IAG) – CCCP-v2 IAG) – OtF to Pipeline DR (Bruno + CMdO + IAG + AK + UFSC/USM)

Commissioning Responsibilities Final Instrument Integration INPE or LNA- tbc) – Opto-mechanical (Rene, Reitano, CdO) – Control Electronics (Denis + CS) – Detector Controller (Javier + Giseli + FF) – FP Controller (Luiz) – Software Instrument Control (Giseli and/or FF) CCCP-v2 (Giseli) Data Red n spec - OtF to Pipeline (Bruno + AK) On-site Integration & Final Test SOAR) – Rene, Reitano, ACdO, Denis, CS, Giseli, FF, Luiz, Bruno, AK Commissioning SOAR) – CMdO, KT, Rene, ACdO, Denis, Giseli, Luiz, Bruno, AK, FFe, FF