A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,

Slides:



Advertisements
Similar presentations
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Advertisements

Linacs hall 300 MeV driving electron linac Positron linac.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental Sciences (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland.
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
Introduction Simulation Results Conclusion Hybrid Source Studies Olivier Dadoun A. Variola, F. Poirier, I. Chaikovska,
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
E+ stacking simulations update Frank Zimmermann on behalf of the POSIPOL Collaboration Particular thanks to: Fanouria Antoniou, Robert Chehab, Maxim Korostelev,
CLIC RF manipulation for positron at CLIC Scenarios studies on hybrid source Freddy Poirier 12/08/2010.
Issues for e+ stacking in the rings Frank Zimmermann IWLC2010, CICG, Geneva, 21 October 2010 thanks to Fanouria Antoniou, Eugene Bulyak, Peter Gladkikh,
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
2nd ECFA LHeC Workshop; 1-3 September 2009, Divonne L. Rinolfi Possible e - and e + sources for LHeC 1 Thanks to O. Brüning, A. Vivoli and F. Zimmermann.
A.Variola LCWS Bejing ERL Compton Scheme Status of the Orsay activity.
Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
23 th July 2010 CLIC meeting L. Rinolfi POSIPOL workshop 2010 L. Rinolfi A brief overview.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
17 th November2008 ILC 08 workshopL. Rinolfi CLIC e - and e + sources and ILC/CLIC common studies L. Rinolfi On behalf of the ILC/CLIC e + working group.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
Design of a one-stage bunch compressor for ILC PAL June Eun-San Kim.
Positron Sources for Linear Colliders* Wei Gai JPOS 2009, Jefferson Lab, March 26, 2009 * Acknowledgement of contributions from the ILC and CLIC e+ collaborations.
CERN 14 October 08 Injectors and Damping Rings working group S. Guiducci, L. Rinolfi CLIC08 Workshop.
Positron capture simulation for 300Hz electrondriven scheme M. Kuriki, Y. Seimiya, T. Takahashi (Hiroshima U.) T. Okugi, M. Sato, J. Urakawa, T. Omori.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
A.Variola Frascati SuperB meeting 1 Injector and positron source scheme. A.Variola, O.Dadoun, F Poirier, R.Chehab, P Lepercq, R.Roux, J.Brossard.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
20 th October 2010 IWLC Sources working groupL. Rinolfi Louis Rinolfi CLIC e - and e + sources overview for the CLIC Sources collaboration.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Compton stacking ring update
Some Aspects on Compton Scheme Positron Source Study Wanming Liu ANL Tsunehiko OMORI KEK.
LHeC Sources Rinolfi CERN Thanks to:
Positron production rate vs incident electron beam energy for a tungsten target
Positron Source and Injector
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Positron capture section studies for CLIC Hybrid source - baseline
Injector and positron source scheme. A first evaluation Thanks to O
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
ILC/CLIC e+ generation working group
Injection facility for Novosibirsk Super Charm Tau Factory
CLIC source update CLIC main beam injectors reminder
Capture and Transmission of polarized positrons from a Compton Scheme
Status of the CLIC Injector studies
SuperB e+/e- main linac and diagnostics studies
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
CEPC Injector Damping Ring
CEPC Injector positron source
with contributions from
Physics Design on Injector I
A POSITRON SOURCE USING CHANNELING IN CRYSTALS FOR LINEAR COLLIDERS
CEPC Injector positron source
CEPC injector beam dynamics
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
CEPC injector beam dynamics
Bunch Compressor Beam Line Optics
Presentation transcript:

A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ, A. VARIOLA (LAL / IN2P3-CNRS) V. STRAKHOVENKO (BINP) *

17/04/2015 A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 2 CONTENTS General scheme of the CLIC positron source Design and Simulation of the elements Future steps

e - gun Laser DC gun Polarized e - Pre-injector Linac for e MeV e - /  Target Pre-injector Linac for e MeV Primary beam Linac for e - 5 GeV Injector Linac 2.66 GeV e + DR e + PDR Booster Linac 5.14 GeV 4 GHz e + BC1 e - BC1 e + BC2 e - BC2 e + Main Linac e - Main Linac 2 GHz e - DR e - PDR 2 GHz 4 GHz 12 GHz 8 GeV 48 km 2.86 GeV  e  Target AM D 2.86 GeV 3 TeV Base line configuration CLIC Main Beam Injector Complex (2009) IP Unpolarized e + 3

4 POSITRON SOURCES USING CHANNELING FOR ILC & CLIC PROPOSED POSITRON TARGET FOR CLIC e-e- Crystal Amorphous e +, e -,   e-e- e+e+ 2 m (5 GeV) W: 1.4 mm thick W: 10 mm thick N. simulated e - : 6000  r =2.5 mm 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON

Gamma Production 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 5 CHANNELINGCOMPTON COMPTON:N  = N  / Ne - = 0.75 E  = 27.7 MeV Ee - = 1.8 GeV CHANNELING: N  = N  /Ne - = E  = MeV Ee - = 5.0 GeV By T. OMORIBy V. Strakhovenko

Positron Production 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 6 N. e + Yield e + /e -  x (rms)  mm mrad  y (rms)  mm mrad MeV  E MeV  z (rms)* mm * Positron Beam Parameters at the target By O. DADOUN

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 7 Adiabatic Matching Device Length: L = cm Magnetic field at the target : B 0 = 6 T Magnetic field at the end : B(L) = 0.5 T Magnetic Field Behaviour :

AMD RESULTS 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 8 AMD cm N*. e + Yield e + /e -  x  mm mrad  y  mm mrad MeV  E MeV  z * mm  z  cm MeV * *136.0

CAVITY 100 KW CW (P. Lepercq) 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 9 L= cm Fr = GHz Iris : r = 20mm Ez max (r=0)= 5.2 MV/m

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 10 CAVITY 100 KW CW (P. Lepercq)

Capture Section Design 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 11 e + (200 MeV) Target  AMD e-e- 63 Cavities  Solenoid AMD Length :L = 20 cm Magnetic Filed:B = T Final Aperture: r = 2 cm SOLENOID Length :L = 41 m Magnetic Filed:B = 0.5 T Drift Tube Aperture: r = 2 cm Accelerating cavities: Number of cavities:N = 63 Length:L = 60 cm Max Energy Gain:  E = 5.95 MeV Maximum Gradient:E z (r=0) = 25 MV/m Frequency: = 2 GHz

Capture Results 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 12 S cm N. e + Yield e + /e -  x  mm mrad  y  mm mrad MeV  E MeV  z mm  z  cm MeV To be optimized…

Phase spaces for the Injector 2.4 GeV Transverse Longitudinal Bunch length (rms) = 5 mm Energy spread (rms) = 65 MeV 17/04/201513A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON By A. LATINA

Phase spaces for the Injector 2.4 GeV Longitudinal distribution For acceptance  E/E = 2 % FW Capture = 74 % of e + rms bunch length 3.2 mm E mean = 2.4 GeV N e+ = 6.4 x 10 9 / bunch  E = 17 MV/m Total distribution:  E = 1.5 % rms bunch length 5 mm 17/04/201514A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON By A. LATINA

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 15 Capture Section (+ Bunch Compressor) CrystalTo the accelerator Target  Adiabatic Matching Device Pre-accelerator Chicane e-e- e+e+ SolenoidCavities  Bending Magnets Drift Magnetic field Electric field e+e+ e-e- e-e- Magnet LINAC 2 GHz

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 16 e+e+ Magnetic Chicane Quadrupoles Bunch Compressor Design Cavities

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 17 Bunch Compressor Elements Quadrupoles: Number:N = 20 Length:L = 30 cm Gradient:G = 0.5 – 5 T/m Aperture: r = 5 cm Accelerating cavities: Number of cavities:N = 63 Length:L = 60 cm Max Energy Gain:  E = 5.95 MeV Maximum Gradient:E z (r=0) = 25 MV/m Frequency: = 2 GHz Bending Magnets: Number:N = 4 Length:L = 30 cm Magnetic Field:B = T Drift Tubes: Number:N = 28 Aperture:r = 5 cm Length:L = cm

18 MAGNETIC CHICANE BS1BS2BS3BS4  E1=0 E2=  E1= -  E2= 0 E1=0 E2= -  E1=  E2=0 139 mm for =66 mrad e+e m 0.29 m 0.30 m  -- -- 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON By M. Martini Chicane Modeling: Bending angle:  = deg Drift: = 30 cm Diaphragm:r = 3.5 cm

Bunch Compressor Results 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 19 S cm N. e + Yield e + /e -  x  mm mrad  y  mm mrad MeV  E MeV  z mm  z  cm MeV

Future Steps Complete the positron source design&simulation up to the pre-damping ring. Optimize the parameters for non-polarized positrons. Study parameter changes for polarized positrons. Employ different codes for simulations (PARMELA, PLACET, GEANT4,…). 17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 20

17/04/2015A. Vivoli, CLIC Positron Source, POSIPOL 2009, LYON 21 THANKS. The End