1 Alberta Airspace & Services Project (AASP) AOCM Presentation Nov 30, 2011 Jim Strukalo – NAV CANADA Project Manager

Slides:



Advertisements
Similar presentations
1 Summary of day 4 Performance Based Navigation The symposium fully supports the PBN concept. It acknowledges that it addresses the States current and.
Advertisements

2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Airservices Australia The NOSS Experience Airservices Australia The NOSS Experience Marcus Knauer – NOSS Project Manager.
ICAO PBN Symposium Regulatory and Certification Forum Safety case – procedure ready for publication? Jeff Cochrane, Manager CNS Service Design.
Hans Koolen NMOC/CFMU Network Operations Services
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
The Role of the Regulator Session 5 Presentation 2.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
Findings/Analysis/CAPs
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Security, Technology and Collaboration The Security Network February 25, 2009 Janelle Miller Director Aviation Security Alaska Airlines / Horizon.
ODOT’s New PI Manual Kevin E. Davis Environmental Supervisor Office of Environmental Services.
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
PBN Airspace Concept Process
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
1 SMS Pilot Program at PIT ACAA Training & Development1 SMS Pilot Program at PIT Safety Management System (SMS) Pilot Program Experience at Pittsburgh.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Integrating information towards Digital ATM Mini Global Demonstration Presented By: Thien Ngo Date:August 28, 2013.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Requirement for PSR Primary Surveillance Radar
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Copyright © 2009 International Water Association STEP 2 ESTABLISH PRELIMINARY WSP VISION.
PDP Improvements Update & Discussion. | 2 Background  Ten proposed improvements aimed to streamline and enhance the GNSO PDP Ten proposed improvements.
NEAA – the Northeast’s Answer to the Dangers of Competition in Helicopter EMS.
Runway Incursions and Prevention Initiatives in Canada Alyre Boudreau Aerodrome Safety (613)
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
NCHRP Study (30) Performance Measures for Context Sensitive Solutions – A Guidebook for State DOTs As presented by Sally Oldham at the 2005 Midwest.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Ray Moy December 01, 2010 Federal Aviation Administration Research, Requirements and Transition.
Information requested following SMS implementation presentation.
1 TC’s Data Requirements for General Aviation: Implications for Flight Schools Air Transport Association of Canada 2010 Annual General Meeting Vancouver,
Northern Lincolnshire Healthy Lives Healthy Futures Programme Stakeholder Presentation December 2013.
Office of Performance Review (OPR) U.S. Department of Health and Human Services (DHHS) Health Resources and Services Administration (HRSA) Stephen Dorage.
State Safety Inspections and Sponsor Expectations.
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
International Coordinating Council of Aerospace Industries Associations 1 Runway Excursion Risk Mitigation The Value of a Collaborative Response Gerardo.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Warren Township Study To Examine Enrollment Project (STEEP) Project Plan & Criteria High Level Timeline Sub-Committee Goals & Deliverables Revised October.
Air Line Pilots Association, International Shared Skies: Safe Integration of Remotely Piloted Aircraft Captain Sean Cassidy 1 st Vice President National.
FlightSafety Academy Professional Flight Training.
Working Group 1: Evolving 911 Services Status Update September 21, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
The Global Voice of ATM Building ATM Capacity in the Middle East.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
Sally Lyon and Staff August 26, OPERATING REVENUES AND OTHER INCOME BUDGET FY 2016.
CITY COUNCIL WORKSHOP – APRIL 12, Strategic Action Plan Evaluation Results.
Overview of the PBN Airspace Implementation Processes
Aviation System Block Upgrades and NAV CANADA Planning
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
Alberta Development Officers Association
System Planning To Programming
Presented by United Arab Emirates
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Technical and Public Advisory Committee Meeting #3
How do airports plan to solve their future ATM challenges?
ICAO PBN Symposium Regulatory and Certification Forum
Presentation transcript:

1 Alberta Airspace & Services Project (AASP) AOCM Presentation Nov 30, 2011 Jim Strukalo – NAV CANADA Project Manager

2 AASP Goals To maintain or enhance the level of safety within the new airspace system. To renew the airspace and procedures in Alberta and update our systems in support of the new parallel runway in Calgary, To update the NAV CANADA airspace system to take full advantage of current and planned technologies that will enable our customers to utilize the latest in flight deck technologies and To complete the development and design of the project by May 2013 for implementation and opening of the new runway in May of 2014.

CYEG CYYC Calgary Parallel Runway Ops – May 2014

4

55 Collaboration Fully collaborative design process. Technical Design Working Group established, to facilitate the design process Customer technical representatives (Pilots), Air Traffic Controllers and Planning Specialists Additional consultation through individual and/or AASP group meetings: Customers Air Carriers Oil Sands and Additional Corporate Flight Training and Recreational Airport Authorities Calgary, Edmonton Additional Stakeholders Adjacent Facilities – WG, VR, FAA (SEA, SLC) TC NAV CANADA Departments – AIS, Airspace Design Specialists, Procedures, Simulators Communities

6 Current Project Status Business Case – nearing completion 4 Options Developed – based on bedpost design STARs for the 4 options in draft Circulated amongst Design Working Group Upcoming design meeting to get feedback on STARs Enroute phase of flight - designs work in progress

7 Near Term Next Steps Meet with Design Working Group to review YC terminal designs. Finalize Option Cases – (4) Fast Time simulation of Option Cases to evaluate efficiencies to Base Case. Narrow the design to 1 or 2 and focus on these for final efficiency determination. Further business case analysis. Finalize Enroute portions of plans.

88 ' JunOct 2012 FebJunOct 2013 FebJunOct 2014 FebJun ' 14 Today 60 Day SMS Review 7/31/14 30 Day SMS Review 6/30/14 Runway Opening 5/29/14 AIS Submission 6/3/13 Design Complete/Lockdown 5/31/13 Final Bedpost Location 5/31/12 Stakeholder/DWG Meeting 8/24/11 Stakeholder Meeting 6/23/11 AASP Project Kickoff 6/1/11 Design Development 6/1/115/31/13 SMS 6/1/116/30/14 Communications Planning 9/12/115/30/14 Aero Studies 10/1/112/28/13 Staff Planning TCU & Twr 10/3/115/30/14 Procedures Design 1/1/1312/31/13 AIS Management & Q.C. 4/1/135/29/14 Training Design 9/1/134/30/14 Training Delivery 1/1/145/29/14

9 Edmonton Terminal Airspace Review Timelines - driven by CYXD and CZVL milestones. Current Project Activities Stakeholder Identification Review of current airspace structure Identification of operational opportunities for both Customers and ANSP Areas of Initial Consideration A review of the utilization of the airspace to the North and Northeast of CYXD; since RWY has been closed. A feasibility review of resizing the size of Class C airspace, with the closure of CYXD, and a goal of increased access to this airspace. i.e. the Chipman Soaring Area Assurance that any new approaches are kept within controlled airspace and the impact this will have on future designs. Collaborative Approach To determine requirements and constraints of Stakeholders. Communication and coordination for customer feedback is a project requirement.

10 Comments Time to Update the System?