IRI Smoothness Testing for Quality Assurance and Warranty Construction Alberta Transportation CUPGA November 15 th, 2009 Moncton, NB.

Slides:



Advertisements
Similar presentations
Volvo Construction Equipment Road Institute Paving Principles.
Advertisements

Minnesota Department of Transportation Mn/DOTs Gradual Shift from Profile Index to IRI.
Mn/DOT Combined Smoothness Specification Operator Certification Training Workshop July 12, 2010.
Why is ride important?. Our customers - the driving public values pavement smoothness very high.
Ride Specification – IRI Update Prepared by Joe Thomas, P.E. 11/1/06 MAAPT 53 rd Annual Asphalt Conference December 6, 2006.
A Connected Vehicle-Based Application to Estimate Road Roughness Transportation agencies devote significant resources towards collection of highly detailed.
Incorporating Environmental Costs in Decision Making Gordon Sparks – U of S / VEMAX Nicole Allen – M.Sc. Candidate / VEMAX September 29, 2010 Saskatchewan.
Proposal Note 555 Surface Smoothness for Bridges and Approaches
LLP HMA Pavements Inertial Profiler Prebid Meeting Solano A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
The Use of Differential Speed-Flow Curves in SATURN.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 2 Surface Characteristics.
mydocs-presentations-2011PAPAMWF-EricaRevisions
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
Lecture 12 Lecture 1L PAVEMENT CONDITION INDICES.
Introduction Surface Engineering & Aggregates and Pavement Management 1.
History Dynatest was founded in 1976 in Denmark by a group of engineers and technicians who combined  science  technology and  business into the development.
International Roughness Index (IRI) for Construction Acceptance Technical Standards Branch Knowledge Presentations to the CEA February 13 th, 2014 Jim.
Safe roads, Reliable journeys, Informed travellers New Technologies for Highway Structures “Vision” Awtar Jandu Structures Design and Management.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Pavement Ride Quality Nicholas Vitillo, Ph. D. Center for Advanced Infrastructure and Transportation.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PAVEMENT CONDITION INDICES. n Historic development of pavement condition indices n The basic functions of condition indices in PMS n Different types of.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Decision Tree Models in Data Mining
Functional (Performance-based) Maintenance Contracting in Denmark By Susanne Baltzer Danish Road Directorate Denmark.
I. Advantages of Smooth Pavements: Longer Life Public Opinion Save Fuel Less Surface Maintenance II. Ways to Ensure Smooth Pavements Subgrade and Subbase.
Geo479/579: Geostatistics Ch13. Block Kriging. Block Estimate  Requirements An estimate of the average value of a variable within a prescribed local.
OThree Chemistry MM5 Model Diagnostic and Sensitivity Analysis Results Central California Ozone Study: Bi-Weekly Presentation 1 T. W. Tesche Dennis McNally.
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Moving to International Roughness Index Measured By Inertial Profilers for Acceptance of New Asphalt Construction in Ontario By John A. Blair, Bituminous.
©2007 NPAS1 Garett Jackson, CPA Segmenting Hospital Accounts Based on Likelihood of Payment Using Predictive Models.
Toronto Catholic District School Board Budget Consultation Meeting Catholic Education Centre May 5, 2008.
On Low Speed Problem in Road Smoothness Profiling Vadim Peretroukhine Michael Nieminen September 28, 2011.
WHITE LINES SAVE LIVES ROAD MARKINGS AND ACTIVE SAFETY George A. Lee CEO - Highways Industry Confederation (UK)
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
The use of texture in the Swedish road management Thomas Lundberg Leif Sjögren Mika Gustafsson.
Ministry of Transportation Ministère des Transports Road Profiler User Group (RPUG) Stateline, Nevada September 28, 2011 Li Ningyuan Ministry of Transportation.
Douglas County Road Maintenance Funding June 27, 2011.
Comparison of Inertial Profiler Measurements with Leveling and 3D Laser Scanning Abby Chin and Michael J. Olsen Oregon State University Road Profile Users.
1 Financial Indicator Graphs for the Year Ended December 31, 2005 – Prepared by Financial Advisory Services Local Government Services Division Alberta.
Use of Probe Vehicles to Measure Road Ride Quality
Asset Management Maintenance Management System
Addressing Localized Roughness at the Project Level by Gary Higgins.
4/25/2017 9:25 AM Inertial Profiler Forum Intro to the Inertial Profiler Implementation September 28, 2015 © 2015 California Department of Transportation.
1 Financial Indicator Graphs for the Year Ended December 31, 2008 Prepared by Financial Advisory Services Local Government Services Division.
1 Financial Indicator Graphs for the Year Ended December 31, 2010 Prepared by Financial Advisory Services Local Government Services Division.
MnDOT Pavement Surface Smoothness Specification 23 rd Annual RPUG Meeting September 29, 2011.
Portorož, Slovenia Slovenia, its roads and its expertise Bojan LebenBojan Leben NK PIARC SlovenijaNK PIARC Slovenija Chairman NK PIARC SlovenijaChairman.
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
Shlomo Bekhor Transportation Research Institute Technion – Israel Institute of Technology Monitoring and analysis of travel speeds on the national road.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
National Highway Institute 4-1 REV-2, JAN 2006 PROFILE INDICES BLOCK 4.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
ROAD PROFILING-ROUGHNESS Presentation by Niranjan Santhirasegaram
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Micro-milling The Economics A Rehabilitative Strategy for Savings Presented By: Sheila Hines Georgia Department of Transportation.
Financial Indicator Graphs for the Year Ended December 31, 2010
Financial Indicator Graphs for the Year Ended December 31, 2008
Transitioning to IRI for Pavement Smoothness
Introduction and Applications
Longitudinal Joint Density Test Results
Financial Indicator Graphs for the Year Ended December 31, 2010
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Presentation transcript:

IRI Smoothness Testing for Quality Assurance and Warranty Construction Alberta Transportation CUPGA November 15 th, 2009 Moncton, NB

AT Construction Smoothness Practices Alberta Transportation (AT) has used the California Profilograph since the early 1980’s. –Full implementation of End Product Specifications for smoothness by the early 1990s. –Profile Index (PrI) assessment based upon 100 m sublot –PrI criteria for: Multi-lift Single lift Curb & gutter –Bump/Dip assessment (> 8 mm outside 7.62 m baseline)

Future Construction Smoothness AT will be moving to IRI using high speed inertial profilers –IRI (International Roughness Index) is a measure based on true road profile –Profilograph Index (PrI) is based on a profile relative to a moving reference –Profile can be collected at highway speeds, increases safety, reduces time, –IRI is already used by AT for P3 projects and PMS

IRI Smoothness Specification Study Study completed in 2009 by EBA Eng. Consultants provided: –Scan of practices and specifications of other agencies using inertial profilers. –Discussion on ProVal software and ability to provide various statistics and indices (IRI, HRI, MRI and Simulated PrI). –Discussion on Half Car IRI (HRI) vs Mean IRI (MRI) indices.

IRI Smoothness Specification Study Study completed in 2009 by EBA Eng. Consultants provided: –Conversion approximations for HRI & MRI vs PrI. –Discussion on assessments based upon discrete segments (100 m) vs continuous segment. –Use of Localized Roughness calculation in ProVal for bump/dip determination.

Current North American Agency Pavement Smoothness Specification by Type (2008)

Simulated Profilograph Index - ProVal

Discrete versus Continuous Segmentation

2009 Comparison Analysis MRI vs PrI Seven paving projects from 2008 were identified that were tested by California Profilograph which had corresponding IRI testing (network level monitoring). A payment assessment schedule for MRI based measurements was modeled after existing PrI tables. Compared bonus/penalty assessment ($) using the MRI vs PrI.

Initial Assessment Schedule Smoothness MeasurementAssessment ($/ 0.1 km) PrI (mm/0.1km)MRI (m/km)Multi Lift (C1) 0 ≤ to to to to to … … to to to to > 23> 1.40Reject

Assessment Comparison $ assessments using MRI criteria was somewhat similar to PrI values. –Six of the seven projects had a net increase in penalties ranging from $10/sublot to $34/sublot. –One project had a net increase in bonus of $12/sublot. –Increased number of reject or “must fix” sublots on six of the projects. Minor tweaking of the Initial Assessment Schedule will result in closer bonus/penalty agreement, however these are two different indexes.