Energy Efficiency Engineering Ltd. Jozef Jachniak, P.Eng. GAS FIRED EQUIPMENT FIELD APPROVALS PART2.

Slides:



Advertisements
Similar presentations
Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Advertisements

Fired And Unfired Pressure Vessels
East Carolina University Compressed Gas Safety Training Program
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
29 CFR 1910 Subpart H Hazardous Materials Presenter Roberto Dickinson OSHA Training Institute Instructor.
Sidney Manning Chief Administrator/Inspector Plumbing & Gas
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
Codes and Standards to be followed in the design and construction of the Green Energy facility National Fire Protection Assoc (NFPA); American Gas Association.
Designing and Installing Exterior Vapor Distribution Systems INTRODUCTION Course Overview and Objectives.
ASME Nuclear Conformity Assessment
Gas Transmission Pipelines
Environmental Health and Safety Radiation Control and Radiological Services.
How to pass the test Stephen Shorrocks David Starr.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Michigan’s Hydrogen Rules Department of Environmental Quality.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
NFPA 31 Standard for the installation of Oil- Burning Equipment
ISO OPERATIONAL CONTROL
1 Canadian Fire Alarm Association The Perspective from a Municipal Building Department Wednesday May 5, 2010 Presented by:Mike Seiling, CET, CBCO, Chief.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
AIFPA March 2011 Safety Codes Act and Alberta Fire Code Responsibilities.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
MODULE 6 Vehicle Parking, Servicing, and Security.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Energy Efficiency Engineering Ltd. Jozef Jachniak, P.Eng. GAS FIRED EQUIPMENT FIELD APPROVALS.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
NFPA 2 Overview Susan Bershad, Staff Liaison, NFPA.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Hot Work Permit Osan AB Fire Emergency Services.
Flammable Liquids Directorate of Training and Education
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Unit 13 Oil-Burning Equipment
Cross Connection Survey Training
How to have a successful Field Inspection / Approval
Alberta Development Officers Association
Oil and Gas Sidney Manning Chief Administrator/Inspector
Global Connections Day Building Safety Service Provider
Who is Liable for a Construction Accident?
Flammable and Combustible Liquids
INDUSTRIAL FIRE SAFETY. INTRODUCTION Industrial Fire Safety is the set of practices intended to reduce the destruction caused by fire. The measures of.
East Carolina University Compressed Gas Safety Training Program
Emergency Electrical Power Supply for Buildings
Understanding Construction Codes
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Council Orientation October 24, 2017
Risk Management Student Powerpoint
CSA Medical gas Standard
Gas Transmission Pipelines
Presentation transcript:

Energy Efficiency Engineering Ltd. Jozef Jachniak, P.Eng. GAS FIRED EQUIPMENT FIELD APPROVALS PART2

What will we talk about today? Part 1 Review Review Compliance Requirements Who is Responsible and For What? Who is Safety Code Officer? Who Else May Require Compliance? What Does Alberta Gas Code Regulation Require? Who is the CSA B149.3 For? Who is the CSA B149.1 For? What is the CSA B149.1 All About? What is an Inspector Looking For?

What will we talk about today? (cont.) What Is the Objective of ENEFEN Field Approval What Does ENEFEN Field Approval Consist Of? How Do We Do Field Approvals? Introduction to ENEFEN Database How do We Do Design and Engineering? Engineering Calculations Quality Control and Safety Compliance The End Result

Part I Review Introduction to ENEFEN What does ENEFEN do? Why are Field Approvals required? Safety legislation(s) behind Field Approvals Which codes do we have to comply with? What does CSA do? Who is AHJ (Authority Having Jurisdiction) Who is IB (Inspection Body)

Part I Review (cont.) What is the Province Wide Variance all about? Who is responsible for compliance? Non-compliance is an offence Penalties can be imposed (monetary and jail) Bill C-45 assigns criminal liability for accidents to individuals at organizations Uncertified appliances and equipment require special inspection and approval What is the difference between “certification” and “approval”

Part I Review (cont.) Who can do Field Approvals? What is the accreditation all about? How about P.Eng. doing a Field Approval? Is stamping of a drawing sufficient? What documentation is required? Who will check it? What will happen if there is no proof of Field Approval? How about GRANDFATHERING?

Review of Compliance Requirements Primary Compliance is with the Provincial Act(s) Alberta Safety Codes Act requires compliance with: Amusement Rides Standards Building Code Electrical Code Elevating Devices Code (including Ropeways) Fire Code Gas Code Plumbing Code Pressure Equipment Safety Private Sewage Disposal Systems

Who is Responsible? Minister (co-ordinate and encourage) Owner (ensure compliance, maintenance, safety) Designer (ensure compliance, submit for review or registration, notify if deregistered) Manufacture (ensure compliance) Contractor (ensure compliance) Vendor (do not advertise or sell, lease or dispose of if non compliant, provide warnings if non-compliant) P.Eng. (ensure compliance) COMPLIANCE WITH ACT !!

Who is Not Liable? Crown Council or members of council Safety Codes Officers Accredited Agencies and their employees and officers Administrators

Who is a Safety Codes Officer? Individual designated by Administrator Person who holds appropriate certificate of competency and meets the requirements of regulation

What Can a Safety Codes Officer Do? Enter premises without warrant Carry out an inspection Review designs and evaluate quality management systems and manufacturing, construction processes Photograph or otherwise record Ask for full disclosure in writing or orally Temporary close and disconnect Require tests or evaluations Apply to Court for enforcement

Who Else Can Require Compliance? Energy Resources Conservation Board (ERCB) Electrical Inspector Fire Department Inspector Insurance Company

What does Alberta Gas Code Regulation Require? CSA B Natural Gas and Propane Installation Code CSA B Propane Storage And Handling Code CSA B Installation Code for Propane Fuel Systems on Tanks on Highway Vehicles CSA B Natural Gas Fuelling Stations Installation Code CSA B Natural Gas for Vehicles Installation Code Alberta Building Code 2006

Who is the CSA B Code For? CSA B Code For Field Approval of Fuel- Related Components on Appliances And Equipment CSA B is For Accredited Inspectors and Safety Codes Officers CSA B Is Not a Design Guideline CSA B is a MINIMUM REQUIREMENT CSA B is not a LAW, it is just a guideline for Field Approvals

What is the CSA B For? CSA B is for Installers of: Appliances, equipment, components and accessories where gas is to be used for fuel purposes Piping and tubing systems from utility termination or propane tank Vehicle natural gas refueling appliances Stationary gas engines and turbines

What Else Does CSA B Reference? CSA B references 50 other standards Among those standards are: B51-09 Boiler, pressure vessel and pressure piping code B Code for Field Approvals C22.1 Canadian Electrical Code Part I National Building Code of Canada NRC 2005

What Does CSA B Include? Definitions Approval Requirements (B149.3) Responsibilities of the Installer (compliance, operator training, manufacturers instructions) Training and quality of labour Suitability of use Meter and Service Regulator Electrical Connections and Components Mobile Homes Hazardous Locations

What Does CSA B Include? (cont) Leak detection Appliance Clearances Appliance Accessibility Outdoor Installations Appliances in Garages Combined Heating Systems Automatic Fire Extinguishing systems High Altitude installations Odorization

What Does CSA B Include? (cont) Pressure Controls Piping and Tubing Systems (pressure drops, sizing, expansion) Venting of Pressure Controls (sizing) Installation of specific Appliances Flue Venting Combustion Air Supply Natural Gas Compressors and Cylinders Vehicle Refueling Appliances

Installer's Responsibilities Compliance With Above 27+ Installation Topics Use of ONLY Certified or Field Approved Appliances Testing and Commissioning of the Installation Operator / Owner Training Documentation of Installation and User Manuals Rating Plate Appropriate Inspections, and Permits

What Is an Inspector Looking For? Appliance Proof of Certification (sticker) OR Compliance with (B ) : Pilot Gas Valve Train Main Gas Valve Train Burner Additional Requirements for Liquid Propane Trains Qualifications of the Installer (Mechanical, Electrical) Installation Unions and Flanges Pressure Test Points Pressure Ratings Bleed Vents Control Devices

What Is an Inspector Looking For? (cont) Observation of Main Burner Flame and Ignition Source Pneumatic Control Systems Ignition Systems Combustion Safety Controls Purge Low Fire Start Temperature, Pressure and Level Safety Limits Gas pressure Safety Limits Auxiliary Fans and Dampers Special Appliance Applications Appliance Location Hazards

What Is an Inspector Looking For? (cont) Accessibility Explosion Relief Temperature Controllers and Sensors Fuel /Air Ratio Controllers Gas / Air Mixers and Blowers Programmable Controllers (PLC’s) Electrical Power Supply Appliance Circuits (wiring diagram) Rating Plate Initial Startup Procedure

What Are The Objectives Of ENEFEN Field Approval? To Systematically Review Various Aspects of Design, Assembly, Installation, Wiring, Testing, Commissioning, Documentation, Operator Training To Confirm that the Final Installation Meets or Exceeds Applicable Codes and Sound Combustion Engineering and Controls Principles. To Review Potential Hazards and Methods of their Avoidance / Mitigation To Confirm that the Installation can be Safely and Reliably Operated and Maintained in its Process and Environment

What Does NFN Field Approval Consist Of? EVALUATION ENGINEERING & DESIGN DESIGN APPROVAL IN PRINCIPLE FIELD INSPECTION

What Does NFN Field Approval Consist Of?

How Do We Do Field Approvals? Proprietary MySQL Database Of Field Approval FAQs and FRAs Google Docs and Excel Interface Client Document Tracking System Automated and Repeatable Evaluation Process Extensive Reporting Compliant with Code Requirements

Data Base Content Groups Client and Owner Contact Data Client Project Data Process Data Location Data Appliance Data Main / Secondary / Pilot Fuel Data Instrument Gas Data Electrical Data

Data Base Content Groups (cont.) Heater Shell Data Fire Tube Data Stack Data Windbox Data Flame Cell Data Main Burner Data Pilot Burner Data Combustion Air Controls Data

Data Base Content Groups (cont.) Heater Permissives Data BMS / FSG Data Heater Control System Main Fuel Train Pilot Fuel Train Fuel Gas Venting Controls PLC Based BMS

Data Base Content Groups (cont.) Factory Acceptance Testing Marking and Alarms Installation Upstream Piping Installation Mechanical / Electrical Startup and Commissioning Combustion Readings Documentation Personnel Training Heater Code Compliance Data

How Do We Do Design and Engineering? Standard Design Codes Client and Application Templates Automatic Drawing Generation Automatic BOM Generation Library of Computerized Engineering Subroutines Rating Plate Design Generation Provincial Application Forms Generation P.Eng. Stamping for Alberta, BC and SK

Engineering Calculations? Thermal Heat Transfer Fuel Mixtures Properties Thermal Oxidation Fuel Train Pressure Drop PSV Sizing Vent Line Sizing Combustion Efficiency Calculation EfficiencyGram Calculation

How About Quality Control and Safety Compliance? Standards Of Operations Compliant with ISO/IEC Accreditation with Standards Council of Canada in Progress ENEFEN Field Approval Process Reviewed and Accepted in writing by Alberta Municipal Affairs ISNetworld Registered Health and Safety Program in Place Approved Vendor for Various Oil Companies

Any Questions? Please feel free to call Jozef at THANK YOU

Safety Legislation?

Code?

CSA B149.1 Installation Code?

What else is required?

Approval of Appliances

Responsibilities

Responsibilities of the installer

More responsibilities 1

More responsibilities 2

More responsibilities 3

Province Wide Variance

Prohibitions

Penalties

INSPECTION AND APPROVAL REQUIRED

Administration

ENEFEN Approvals Accepted by AMA

CSA B149.3