Follow the ABCGA April is Safe Digging Month. Follow the ABCGA.

Slides:



Advertisements
Similar presentations
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Advertisements

Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
NATURAL GAS: The Next Step Emily Fisher Special Projects Coordinator.
Greater Chicago Damage Prevention Council REQUESTING PERMITS Excavator Responsibilities (Contractual and Municipal) A permit is required for any excavation.
Improving the level of public service. City of Cedar Rapids  GIS Manager City of Cedar Rapids  GIS Analyst Russell Camp, GISPAdam Galluzzo.
Emergency Action Plans
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
2015 TGA Safety Roundtable. UtrzxJIEbE.
PUBLIC LAND DISPOSITON MAPPING SDW & ALTALIS BACKGROUND - DIDS.
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
1 THE LACLEDE GROUP Natural Gas Distribution Overview and Safety MISSOURI ONE CALL SYSTEM OPERATING COMMITTEE MEETING DECEMBER 19, 2013.
Jaime Medina. At Texas811 we have set our sights on leading the Damage Prevention Industry and to improve its future Last Month Texas811 celebrated its.
1 PSE&G’s Solar 4 All™ Program: Pole-Attached Solar Installations in Your Area December 22, 2009 January 12, 2010.
Federal Agency Update – January 2009 Pipelines & Informed Planning Alliance (PIPA) Communications Task Team Status Danny Gibbs Spectra Energy / INGAA It’s.
113 East College Avenue, Suite 200 Tallahassee, Florida
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
The Day After The Shakeout Place your Counties Logo Here MT DES Exercises.
Natural Gas Pipeline Safety EDM Services, Inc. April 2009.
| Part 1: Background About Georgia 811 Georgia Dig Law Notification requirements Penalties Hours of operation Positive Response.
Utilities Drawing Project U N I V E R S I T Y OF K E N T U C K Y.
Louisiana State Police Emergency Services Unit. The Emergency Services Unit is comprised of: Explosives Control Explosives Control HazMat HazMat Right-to-Know.
Carly Ruacho, AICP, Senior Planner Skagit County Planning & Development Services Pipeline Safety Project.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
ATCO Electric Process Customizations Utilizing InService Presenters: Kent Mack and Corey Lunty I2CO Presentation.
MnDOT-ACEC/MN Annual Consultant Conference March 5, 2012 Leveraging SUE Data for Utilities on Projects Tom Swafford- Utility Mapping Services, Inc.
Mission Statement The Orange/Chatham County Utility Coordinating Committee will provide a forum for utilities, governmental agencies, and contractors within.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Track # SHAW ENVIRONMENTAL © 2006 The Shaw Group 4171 Essen Lane Baton Rouge LA USA.
Chapter 3.1 Quiz Review. In economic terms, land, labor, capital and entrepreneurship are called Factors of Production.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
BOWLING GREEN STATE UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY Tornado Safety.
When a Locate is needed South Dakota Law Chapter 49-7A requires that anyone who engages in any type of excavation provide advance notice of at least 48.
Reducing Third Party Damage to High Pressure Pipelines Neil Jackson Policy Manager, Transmission.
Gas Safety and Excavating: What you need to know Presented by the BC Safety Authority.
February 18, 2010 Terasen Gas. A Fortis company. Dig Safe B.C. Abbotsford Damage Prevention Burn blue. Save green.
What is Energy? Energy makes things go. It is the capacity to do work, heat something up, or change it in some way.
Smoke Testing Information
USDA Rural Development. -- Improving the quality of life -- Increasing economic opportunity.
Offshore Notification System www.GulfSafe.org.
GEODETIC CONTROL MARK TYPES. Call Before You Dig Avoid Careless Damage and Accidents Digging can be dangerous and costly without knowing where underground.
INTELLIGENT NETWORKS YOUR COMMUNITY OUR COMMITMENT.
Working around Underground Pipes and Cables. Who we are Dial Before You Dig is a not for profit member based association. Dial Before You Dig provides.
IMCO’s excavations in the vicinity of Olympic’s pipeline.
Contact Information Cari Kobialko Data Integrity Manager Tel: (604) Location.
CONSTRUCTION DAMAGE April 4, 2007 MISSOURI COMMUNITY FORESTRY COUNCIL ANNUAL MEETING.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
Advertising and Marketing 2014 Report and 2015 Plans.
Introduction Pipeline safety awareness meetings in a presentation setting are nearing the end of their lifecycle and usefulness. Pipeline and utility.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
MAX RESIDENCY Residential layouts BIAAPA Approved plots, sites for sale near BIAL- Bangalore International Airport by leading land developers Maxworth.
1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.
Presentation Overview
Preventing to Damage to Canada’s Critical Underground Infrastructure Mike Sullivan – Executive Director.
NORTH TRUNK SEWER REPLACEMENT PROJECT
Michigan’s Utility Notification
BODY MECHANICS OBSERVING FIRE SAFETY PREVENTING ACCIDENTS AND INJURY
SD INTRASTATE PUBLIC EDUCATION
Locating Gas Structures
Fueling the Future of the Fairbanks North Star Borough
SD INTRASTATE PUBLIC EDUCATION
Presentation transcript:

Follow the ABCGA April is Safe Digging Month

Follow the ABCGA

Check out the new app “DIG INFO AB” Available Now!

Follow the ABCGA Background Under both the rural and urban land of Alberta lies an extensive infrastructure of pipes and cables Today’s society depends heavily on the safe operation of all buried facilities, which are estimated to span more than 1,500,000 km in Alberta, including 400,000 km of high pressure pipelines

Follow the ABCGA Background These many facilities include: communications electrical infrastructure gas distribution water sewer storm drainage transmission pipelines oil and gas production lines

Follow the ABCGA What can you do? As a contractor, homeowner, or landowner, you can save time and money while keeping yourself, your community and your province safe by following a few simple rules:

Follow the ABCGA Click Before You Dig Failure to Click Before You Dig is the most frequent cause of damage to infrastructureClick Whatever the project may be, plan ahead and utilize the free service offered by Alberta One-Call Do your Part: Dig with C.A.R.E.

Follow the ABCGA Planting a tree, putting up a fence, or installing a mailbox? 1.Visit or the new app at “DIG INFO AB” at least 2 working days before you plan to disturb the groundwww.ClickBeforeYouDig.com 2.Alberta One-Call will notify buried facility operators who will then send a representative to mark their facilities 3.You can safely dig!

Follow the ABCGA Key Messages: Plan Ahead Contact Alberta One-Call at least two working days prior to any ground disturbance Allow time for buried facilities to be located Respect the locate marks Follow facility owner instructions to hand expose any conflicting buried facilities before using mechanical excavation equipment near them Report any damage caused or found to the facility owner DIG WITH C.A.R.E.!

Follow the ABCGA Benefits of Clicking/Tap over Calling Before You Dig Available 24 hours No waiting on hold You can include a map of the exact location of where you need the locates In Case of Emergency or if you do not have access to a computer you can call

Check out the nationwide portal 1.Click on any province 2.Book your locate

Follow the ABCGA As April is the traditional start-up of the annual digging season the ABCGA declares: Remember: We are all responsible for preventing damage to Alberta infrastructure all of the time. April is Safe Digging Month Please dig with C.A.R.E!