The AER-Unconventional Framework SPE Presentation February 19, 2014 Robyn Swanson C.E.T., P. Eng. Tel: 403-213-4250

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

By V Misser. INTRODUCTION financial record management; financial record management; monitoring and evaluating spending trends; monitoring and evaluating.
Internal Control–Integrated Framework
“Sustainable Water Management in the Oil and Gas Industry” John Tintera PG #325 Blythe Lyons Katie Carmichael Texas Alliance of Energy Producers.
Canada’s Offset System for Greenhouse Gases Dean Stinson O’Gorman New Brunswick Climate Change Hub meeting October 7, 2009.
Strengthening the Medical Device Clinical Trial Enterprise
Cost Benefit Analysis of proposed reforms to water access for Petroleum & Gas Projects Qwater Conference 7-8 November 2014.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
Outcomes focused regulation and compliance in practice Peter Scott Peter Scott Consulting
41 st Asia Pacific Economic Cooperation Energy Working Group 2011 Regulating British Columbia’s Natural Gas Presented by: Paul Jeakins BC Oil and Gas Commission.
EVOLUTION OF SPACING AND POOLING IN COLORADO Denver Association of Division Order Analysts July 21, 2014 Denver, Colorado Steve Sullivan Welborn Sullivan.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
OVERVIEW OF PETROLEUM ENGINEERING.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Process Safety Management
Corvelle Drives Concepts to Completion Positioning Master Data Management for Success PPDM Association October
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Internal Auditing and Outsourcing
Reforms to Victoria’s native vegetation permitted clearing regulations.
Syktyvkar, Komi Republic April 1, 2009 Presented by Marcelo Levy Responsible Forestry Solutions.
Ship Recycling Facility Management System IMO Guideline A.962
Proposed Regulated Waste Framework Julian Chan - EHP.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
EQARF Applying EQARF Framework and Guidelines to the Development and Testing of Eduplan.
INTERNAL CONTROL OVER FINANCIAL REPORTING
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Joint Forum of Financial Market Regulators Forum conjoint des autorités de réglementation du marché financier Guidelines for Capital Accumulation Plans.
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
1 DOE Office of Natural Gas and Petroleum Technology Overview of Environmental Program Retroactive Metrics Analysis July 2000.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
TOPIC 12 STAKEHOLDERS AND SUSTAINABILITY. Introduction to Agenda 21 The Earth Summit held in Rio De Janerio, Brazil was attended by 178 country leaders.
Holistic Approach to Security
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Nexia International Network versus Association Requirements.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
FORUM GUIDE TO SUPPORTING DATA ACCESS FOR RESEARCHERS A STATE EDUCATION AGENCY PERSPECTIVE Kathy Gosa, Kansas State Department of Education.
Chapter 19 Managing growth and harvesting. Learning Outcomes On completion of this chapter you should be able to: Distinguish between the various life.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Audit of predetermined objectives PFMA Reputation promise/mission The Auditor-General of South Africa has a constitutional mandate and, as the.
Waste Management Amendment Bill B Submission by Business Unity South Africa January 2014.
Evaluating Engagement Judging the outcome above the noise of squeaky wheels Heather Shaw, Department of Sustainability & Environment Jessica Dart, Clear.
Coalbed Methane Assessment and Analysis of Produced Water Disposal Options, Northern Cheyenne Reservation, Montana Project FEW Shaochang Wo, Principal.
DRAFT USEPA Office of Compliance Update: 90 CWA Action Plan, State Review Framework, & OECA National Priority Selection Presentation to NACAA Chris Knopes.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
RISK MANAGEMENT IN THE PUBLIC SECTOR CONVERGING MULTIPLE STAKEHOLDER’S EXPECTATIONS Organised by National Treasury Presented by WELEKAZI DUKUZA CEREBRO.
Environment Mick Borwell Environmental Issues Director.
Hydraulic Fracturing (Fracking)
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
International Association of Oil and Gas Producers Europe’s Indigenous Oil and Gas Production GSE Workshop Brussels – 24th May 2007.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Update from the Faster Payments Task Force
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
10th Air Quality Governance Lekgotla Session: 7.3
New Special Education Teacher Webinar Series
Presentation transcript:

The AER-Unconventional Framework SPE Presentation February 19, 2014 Robyn Swanson C.E.T., P. Eng. Tel:

© 2013 IHS Introduction Most recently the AER and industry have been faced with applying the existing rules to the development of resources that are being referred to as unconventional resources. The key/crucial question is do we require a complete new set of regulations to accommodate ‘unconventional resource’ development or are we able to work within the existing regulations with some minor tweaking? 2

© 2013 IHS Introduction Topics: - Definitions - Current regulations - Proposed regulations - Conclusions - Questions 3

© 2013 IHS Introduction - The AER has identified the key challenges of unconventional oil and gas development to be management and protection of water, performance assurance of multistage hydraulic fracturing technology, and regional effects of activities on the landscape. 4

© 2013 IHS Definitions - The AER defines unconventional oil as tight oil: oil found in low-permeability rock, including sandstone, siltstone, shale, and carbonates. - The AER refers to unconventional natural gas as tight gas: natural gas found in low-permeability rock, including sandstone, siltstones, and carbonates, shale gas: natural gas locked in fine-grained, organic-rich rock, coalbed methane (CBM): natural gas contained in coal. - A friend defines Conventional Resources as “resources you make money on, unconventional resources are those you don’t make money on”. 5

© 2013 IHS Definitions 6

© 2013 IHS Definitions 7

© 2013 IHS Current Regulations - The BC OGC allows for project area development through Good Engineering Practise (GEP) approvals. Typically GEP’s are issued for gas or oil. A GEP allows the operator an unlimited increase in well density, and commingling if the approval is for more than 1 formation. - Saskatchewan and Manitoba regulations do not make provision or contemplate unconventional resource development. - In Alberta, currently there is no similar or equivalent approval to GEP that would allow unrestricted development within a specified project area. 8

© 2013 IHS Current Regulations - Existing spacing regulations allow for unlimited Coal Bed Methane (CBM) and shale gas development on a per drilling spacing unit basis. - Operators need to be cognizant of honouring the target areas, to avoid offtarget penalties. - Shale gas and CBM wells have historically had control well requirements but a moratorium has been placed on the requirement for additional CBM control wells, for now. 9

© 2013 IHS Current Regulations - The development of unconventional oil resources is done within the existing regulation. - Currently, to increase the well density beyond the default, one oil well per quarter section you would need to submit an application for a holding. - Generally, the AER approves incremental increases in well density on smaller land blocks of common ownership on a lessor and lessee basis. - It can be several years before full cycle development to the operator’s satisfaction is achieved. 10

© 2013 IHS Current Regulations - Operators can be faced with postponements of spud dates while they await holding approvals or have to keep wells shut until the holding approval is issued. - Wells may be temporarily non compliant for violating a buffer condition which can result in a high risk enforcement action and shut in. - Delays in spacing approvals can be compounded by uncertainty in well classification. - The AER has guidelines with respect to oil versus gas well classification. - Recently, the exploitation of high liquids tight gas plays has resulted in well classification confusion.. 11

© 2013 IHS Current Regulations - In my opinion, the confusion results primarily from the higher liquids volumes that are produced in the horizontally drilled wells. - Often when these same zones are developed with vertical wells they are clearly gas wells. - Once you have your spacing in place and well classification sorted out then you have to contemplate and apply for good production practise (GPP), concurrent production (CCP) commingling and/or enhanced recovery if it is an oil play. 12

© 2013 IHS Proposed Regulations - About a year or so ago, December 2012, the AER released Regulating Unconventional Oil & Gas in Alberta – A Discussion Paper and invited feedback from industry. - In the December 2012 discussion paper the AER proposes regulation of unconventional resources with a risk based and/or play focused regulation. - July 2013 issued an update to their Unconventional Regulatory Framework (URF)which is a presentation describing the current regulations for oil and gas development and how the AER will respond to new development. 13

© 2013 IHS Proposed Regulations 14

© 2013 IHS Proposed Regulations The AER has defined a risk based regulation as a decision-making framework used to ensure that a regulatory response is applied at a level that is proportional to the severity of the risk. The AER describes a play focused regulation as the following A play represents a three-dimensional entity that is the target of oil or gas development. It has a number of characteristics that can be used to describe it, including - the specific geological formation, - areal extent, geographic location, - types of fluids in the rock, 15

© 2013 IHS Proposed Regulations - other geological and reservoir characteristics and - often targets the source rock. 16

© 2013 IHS Proposed Regulations - Because each play may require slightly different regulation the play based regulatory framework will induce the AER to develop a risk profile and appropriate regulatory responses that are play specific. - Play focused regulation would be defined by characteristics such as Geology Geographic area and corresponding land use Technology being employed Fluids produced, and other Reservoir properties. 17

© 2013 IHS Proposed Regulations - These characteristics would be used to determine the level or type of risk that development of the play might generate. - This would be done early on in the identification of the unconventional resource play so as to attempt to develop strategies to mitigate risk for the play including taking into consideration Provincial and regional policies that affect oil and gas development in Alberta such as Water for Life and the Land-use Framework. - The key takeaway here is the AER’s existing regulatory requirements and processes will remain effect unless modified for a specific play. 18

© 2013 IHS Proposed Regulations - What will it look like and how do you qualify as a play? - Any exploration play, begins with the drilling of an exploratory well. - So how do you get an area declared as play? - from Regulating Unconventional Oil & Gas in Alberta. 19

© 2013 IHS Proposed Regulations - Eventually the AER will formally declare a resource play based on resource potential and development activity. - The AER intends to establish performance indicators and measures to monitor and evaluate whether regulatory outcomes are being achieved in a play. - AER may adjust or change the play boundaries and specific requirements as the play evolves and matures. 20

© 2013 IHS Proposed Regulations - The regulatory outcomes prescribed for Unconventional Resource plays will address: Water management Waste management Air quality Conservation Orderly development Public safety Information and advice 21

© 2013 IHS Proposed Regulations - In the early stages of exploration, individual operators will be submitting individual applications for well licenses, pad approvals, holdings, etc. - At some stage of development an individual operator may submit a project plan approval for their lands (geographic area) in a specific formation. - Assuming the AER would get several such project plans and feel they have sufficient information regarding the play development they may (and this where things get a bit murky for me) require The operators who have submitted and received approval for project plans to collaborate on the multi company play development plan, OR 22

© 2013 IHS Proposed Regulations The AER may decide, with or without operator consultations, to declare a particular geographic area and formation as a Play Development Area. - At this point the AER will identify expected outcomes, modifications to existing AER requirements, and new requirements and/or regulatory processes for that play in a Board Order - Hence, the reason I said earlier that rules and requirements may/can change as a play develops and matures. 23

© 2013 IHS Proposed Regulations - The AER Play Board Order will require operators within the play declared area follow all current regulatory requirements except where modified or superseded by play-focused requirements in the Board Order. - The play development plans must address 1. Water management practices 2. Surface Infrastructure development 3. Subsurface reservoir management 4. Stakeholder engagement 5. Life cycle wellbore integrity 24

© 2013 IHS Proposed Regulations - The AER will review and approve plans that are complete and satisfactorily address the five issues. - It is not clear to me that reservoir management strategies such as commingling, well density, GPP, CCP and ER are part and parcel of the play OR project development plan submission while addressing the five issues. 25

© 2013 IHS Proposed Regulations - Whether you are applying for a project plan or play development plan you will have to apply for a Pad Approval - The Pad Approval can be applied for outside of the project or play development plan or be a part of either of those submissions - The purpose of the pad approval is to: reduce effects on the environment and land use streamline and improve the efficiency of the application and approval process for repeat activities that occur on one location support early multiwell production operations 26

© 2013 IHS Proposed Regulations enable bundling of approvals for drilling and completing multiple wells and surface equipment on one pad - The pad approval could be issued for a period of upto 3 years from the approval date. 27

© 2013 IHS Proposed Regulations - Finally how would the AER monitor the operator or operators for compliance assurance - The monitoring could be handled through Audits Regular evaluations, by the AER, of the Plan’s effectiveness Requirements for regular/annual reports and/or presentations A monitoring protocol in the Project or Play Development plan that the operators /applicant stipulates 28

© 2013 IHS Conclusions - Regardless of whether the AER proceeds with the proposed Unconventional Regulatory Framework the existing regulations will remain in place and will continue to apply. - The URF will introduce another level of requirements and compliance for which regulations may not exist. - The URF will require collaboration between and amongst the operators; that may or may not be realistically achievable. - A Project or Play Development plan approval does not necessarily provide approval for holdings, GPP, CCP, ER, etc. - these may have to be applied for outside of, or in addition to the Plan Approval. 29

© 2013 IHS Conclusions - Who takes responsibility for the Play Development Plan Approval? Presumably the Plan Approval would be issued to only one of the operators who would be responsible for the compliance assurance for the Plan. I strongly encourage operators to stay engaged and on top of the proposed URF as the AER proceed with their implementation strategy, part of which includes meeting with key stakeholders and representatives from appropriate government departments to discuss the Play Development Plan approach and determine best practices. 30

© 2013 IHS QUESTIONS? 31