Material Tour of Boiler - Catastrophic Failures of Boiler Components Presented by George W Galanes, P.E. Metallurgical Consulting Engineer Diamond Technical.

Slides:



Advertisements
Similar presentations
Fired And Unfired Pressure Vessels
Advertisements

FOCUS POINTS FOR SITES TO IMPLEMENT TOWARDS BOILER TUBE FAILURES PREVENTION (Actionable points for site based on failure analysis ) SCOPE: BOILER PRESSURE.
East Carolina University Compressed Gas Safety Training Program
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
Test to Failure of 3/8-Inch Tube Ferrule Connections in an Effort to Determine the Shear Strength of a Varying Number of Threads Engaged P.O. Box
MATERIALS TESTING.
BMFB 4283 NDT & FAILURE ANALYSIS
Refuge Alternative Examinations, Approvals, and Refits Stakeholder Meeting-MSHA HQ June 27, 2012.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
2013 California State Emphasis Program.  During a 4 Crude Unit meeting with regulators Chevron personnel admitted they were “thinking about” clamping.
1 Heat Exchangers. Standards of Conduct in Training 2.
2011 MADCS Conference.  FMA is a tool to help identify:  Priorities for rehabilitation  Improvements for operation, maintenance and data collection.
Gas Transmission Pipelines
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Stainless Steels Stainless steels are iron base alloys that contain a minimum of approximately 12% Cr, the amount needed to prevent the formation of rust.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS ACCIDENT INVESTIGATION Prepared by: Miss Hairul Nazirah Abdul Halim.
Learning Objectives  Recognize the need for an investigation  Investigate the scene of the accident  Interview victims & witnesses  Distinguish.
PRESENTED BY ABC TEXAS GULF COAST CHAPTER
Lab 6B -Fracture Toughness and Fracture Toughness-limited Design Big bang for the buck!
Process Hazard Analysis DOW Fire & Explosion Index ChE 258 Chemical Process Safety University of Missouri - Rolla.
Incident Reporting Procedure
ACCIDENT INVESTIGATION. Accident Investigation An Employer should immediately investigate the cause of any accident or other incident that : çresulted.
Introduction to Equipment
Process Safety Management
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
STRUCTURES Outcome 3 Gary Plimer 2008 MUSSELBURGH GRAMMAR SCHOOL.
EXAMPLE FEP REPORT – Flow Erosion Assessment Program Investigation Report – May 2009 EIMAGING POWER GENERATION.
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
Destructive Examination & Testing 2 Destructive Examination Destructive Examination renders the weld or material unfit for further service.
Significant Potential Incident Unauthorized Weld on Pressurized Water Line Timmins, Ontario, Canada October 17, 2011.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Boil Water Notices – Mandated vs. Precautionary Operating Board November 6, 2014.
MECHANICAL TESTING.
Welding Inspection and Metallurgy
1 Full document available on EDMS Metallurgical qualification of AISI 316L TIG welded tubes Summery - Richard French.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Risk Identification. Hazards and Risk Section 2: ACCIDENT THEORIES 2.1 Single Factor Theories  This theory stems from the assumption that an accident.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
EFFECTIVE ACCIDENT/INCIDENT INVESTIGATION 15 FEBRUARY 2013 PHILIPPINE ASSOCIATION OF SAFETY ENGINEERS -QATAR- -QATAR- COMMITTEE ON SAFETY EDUCATION 2013.
STRUCTURES Young’s Modulus. Tests There are 4 tests that you can do to a material There are 4 tests that you can do to a material 1 tensile This is where.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
1 Advantages of combining gamma scanning techniques and 3D dose simulation in dose optimisation problems. F.Vermeersch IDPBW, Nuclear Studies Occupational.
Accident analysis One-hour training.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Lockout/tagout for authorized employee
ACCIDENT INVESTIGATION PRESENTATION
Incident Reporting And Investigation Program
Compressor Safety Practices
Teknologi Las Kapal Destructive Testing.
ACCIDENT INVESTIGATION PRESENTATION
Material Tour of Boiler - Catastrophic Failures of Boiler Components
Compressor Safety Practices
East Carolina University Compressed Gas Safety Training Program
Incident Reporting And Investigation Program
MATERIALS TESTING. Why are metals tested ? Ensure quality Test properties Prevent failure in use Make informed choices in using materials Factor of Safety.
1/18/2019 6:28 AM C h a p t e r 8 Failure Dr. Mohammad Abuhaiba, PE.
Mechanical Properties: 2
LOP Flare Pilot Outage Shell Martinez Refinery 7/6/18
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Boiler Room LOG Sheets: Interpreting the Records
Gas Transmission Pipelines
Presentation transcript:

Material Tour of Boiler - Catastrophic Failures of Boiler Components Presented by George W Galanes, P.E. Metallurgical Consulting Engineer Diamond Technical Services, Inc

Introduction Discuss two rather important and recent failures of high temperature and high pressure boiler components Discuss two rather important and recent failures of high temperature and high pressure boiler components Both failures were catastrophic and resulted in loss of equipment Both failures were catastrophic and resulted in loss of equipment One failure caused injury to plant personnel One failure caused injury to plant personnel What happened? What happened?

Primary Superheater Link Pipe Ruptures

Typical Boiler Layout Pri SH Inlet Feeder Pipes (30 total) (136 sweeps) “ O.D. x “ minimum wall thickness of SA335 P1 material (carbon – moly steel). Design pressure is 4,180 psig and 830 deg. F.

History Repeats….. ▪ 1982: - 5” long tight through wall crack found during hydro during forced outage - Boat sample analyzed by internal lab: “contained many sulfide inclusions”, no Charpy testing completed, no graphitization, inconclusive failure mechanism. - Repaired: grind / re-weld. ▪ 1990: - Through wall crack found during hydro during a forced outage. - No metallurgical analysis completed - Repaired: grind / re-weld. ▪ 2004: - Through wall crack / on-line leak - No metallurgical analysis completed - Replaced elbow with upgraded P22 material during a scheduled 11 day outage. ▪ 2009: - Multiple elbow failure event during unit shut-down. - Metallurgical Analysis performed however results did not detect grain boundary graphitization because of unfamiliarity with the damage mechanism. ▪ 2011: - Single elbow failure of a previously repaired elbow during steady state conditions. - Detailed seq. of events on subsequent slides.

What happened on that day Sequence Of Events: Thursday 2/10/11, Primary Superheater inlet pipe 7:37 a.m. (during normal AM load increase (5 mw/min) at 606 mwg) INJURIES Two Plant employees and one contractor employee were air lifted to a burn center All with 2nd degree burns; released following day. Two Plant employees taken by ambulance to regional Medical Center Both released same day. One employee treated for dust inhalation (Released same day)

Type of Rupture

Teamwork A root cause analysis (RCA) team was assembled. A root cause analysis (RCA) team was assembled. Team members consisted of operations personnel, plant personnel, and outside consultants to ensure a methodical review of events and known process for establishing causal factors. Team members consisted of operations personnel, plant personnel, and outside consultants to ensure a methodical review of events and known process for establishing causal factors. In addition, fracture mechanics and boiler flow modeling were used to assist in RCA. In addition, fracture mechanics and boiler flow modeling were used to assist in RCA. Outside entity was the lead in conducting the RCA to ensure independent technical oversight. Outside entity was the lead in conducting the RCA to ensure independent technical oversight. The failed sweep was sent to a metallurgical laboratory for comprehensive metallurgical analysis; The failed sweep was sent to a metallurgical laboratory for comprehensive metallurgical analysis; Chemical Analysis Chemical Analysis Tensile testing Tensile testing Hardness Testing Hardness Testing Impact testing Impact testing Metallographic examination Metallographic examination

Look Closely It was determined that the cause of failure in the primary superheater (PSH) inlet sweep was a damage mechanism confirmed to be grain boundary graphitization.

What Happened…. This type of damage mechanism is time dependent, meaning as the This type of damage mechanism is time dependent, meaning as the Grade P1 remained in elevated temperature service, the pipe would exhibit continued significant loss in toughness and ultimately fail catastrophically (no leak before break) in service. The failure initiated and propagated from the OD surface of the The failure initiated and propagated from the OD surface of the bend extrados. This location would have been exposed to the highest forming strains. Bulk hardness testing confirmed the extrados as having the highest hardness( approximately 200 HV in comparison to straight sections at 165 HV). Loss of toughness and significantly reduced elongation values Loss of toughness and significantly reduced elongation values were confirmed in the formed sweeps versus straight sections of Grade P1 piping based on extensive mechanical property testing.

Summary Grain boundary graphitization was confined to formed bends Grain boundary graphitization was confined to formed bends did not appear to have been thermally treated after forming. did not appear to have been thermally treated after forming. Because the grain boundary graphitization damage mechanism is not Because the grain boundary graphitization damage mechanism is not well understood or reported in literature it was more difficult to quantify severity of damage in comparison to the more traditional form of graphitization damage (graphite nodules). well understood or reported in literature it was more difficult to quantify severity of damage in comparison to the more traditional form of graphitization damage (graphite nodules). Fortunately, after extensive sampling of sweeps and straight pipe Fortunately, after extensive sampling of sweeps and straight pipe sections of known Grade P1 PSH pipe material, there was no grain sections of known Grade P1 PSH pipe material, there was no grain boundary graphitization observed in straight sections of Grade P1 pipe boundary graphitization observed in straight sections of Grade P1 pipe because these pipe spools contained no residual forming strains. because these pipe spools contained no residual forming strains.

Prevention………….. Based on the findings from the Unit PSH sweeps, a review was Based on the findings from the Unit PSH sweeps, a review was was performed to determine the extent of Grade P1 pipe material installed in this boiler and in a second boiler (sister unit). Carbon steel piping was also sampled as a precaution. No grain boundary graphitization damage was detected for carbon steel piping. Carbon steel piping was also sampled as a precaution. No grain boundary graphitization damage was detected for carbon steel piping. In addition, a search of Grade P1 material was expanded to include In addition, a search of Grade P1 material was expanded to include the remaining coal-fired units for this client. No other Grade P1 piping was installed in the boiler proper. After careful review of metallurgical test results for sampled Grade P1 pipe After careful review of metallurgical test results for sampled Grade P1 pipe material locations in both boilers, it was recommended to replace the original Grade P1 sweeps with SA 335 Grade P22 material and monitor the remaining P1 piping until full replacement using SA 335 Grade P22.

Failure #2 Warm-Up Line for an HRSG during start-up

Warm-Up Line Failure Investigation Activities Associated with Root Cause Analysis and metallurgical failure analysis; Activities Associated with Root Cause Analysis and metallurgical failure analysis; Mapping of the failed warm-up line Mapping of the failed warm-up line Removal and preservation of failed segments Removal and preservation of failed segments Engineering Review of operating information Engineering Review of operating information Engineering Review of the design basis of the warm-up line Engineering Review of the design basis of the warm-up line Selection of a metallurgical lab to perform laboratory analysis in support of the failure investigation. Selection of a metallurgical lab to perform laboratory analysis in support of the failure investigation.

Failed Warm-up Line

More Pictures …

And more pictures..

Warm-up Line ID Surface

View of the ID pipe surface

Local thinning from corrosion

Results Failure of the warm-up line Failure of the warm-up line internal wastage that weakened the pipe resulting in catastrophic rupture in service at multiple locations within the line. The internal wastage The internal wastage corrosion from either stagnant or pooled condensate during off-line conditions from exposure to air atmosphere. There was no evidence of internal erosion or erosion/corrosion that contributed to the failure.

RCA Causal Factors Reverted control logic for the 12” Fischer regulating valve that exposed the weakened line to internal operating pressure near main steam pressure conditions. Reverted control logic for the 12” Fischer regulating valve that exposed the weakened line to internal operating pressure near main steam pressure conditions. However, it is important to note that if the warm-up line did not sustain internal corrosion it would have safely accommodated main steam internal pressure based on original design (ASME B31.3). However, it is important to note that if the warm-up line did not sustain internal corrosion it would have safely accommodated main steam internal pressure based on original design (ASME B31.3). Lack of urgency in reviewing the previous pipe inspection results from February, The pipe inspection results indicated excessive local wall thinning that if given proper review would have resulted in immediate corrective actions – repair or replace of severely thinned pipe sections prior to return to service. Lack of urgency in reviewing the previous pipe inspection results from February, The pipe inspection results indicated excessive local wall thinning that if given proper review would have resulted in immediate corrective actions – repair or replace of severely thinned pipe sections prior to return to service. The need to have a sufficient number of drains to ensure proper drainage of this warm-up line to prevent stagnant or pooling of condensate when the line is valved out. The need to have a sufficient number of drains to ensure proper drainage of this warm-up line to prevent stagnant or pooling of condensate when the line is valved out.

Prevention Corrective Actions Develop inspection plans for the warm-up line and other high energy steam lines. The inspection program results should be reviewed independently of site personnel to ensure no gaps or missed opportunities for corrective actions. Develop inspection plans for the warm-up line and other high energy steam lines. The inspection program results should be reviewed independently of site personnel to ensure no gaps or missed opportunities for corrective actions. Survey the replacement warm-up line and other lines that are used on an infrequent basis to determine the need for drains or drain pots to avoid having similar internal corrosion problems. Survey the replacement warm-up line and other lines that are used on an infrequent basis to determine the need for drains or drain pots to avoid having similar internal corrosion problems.

Questions?