PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-26-1 252 CHURCH STREET OLIN.

Slides:



Advertisements
Similar presentations
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P-31-1 DATE: FOSS 9 & 10 – DOOR REPLACEMENT.
Advertisements

NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
WESLEYAN P BID PACKAGE #19
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
About the Instructor & Presenter: Paul G. Baillargeon, AHC, FDAI Vice President, Technical Consulting Door Security & Safety Foundation A noted veteran.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P C CAPITAL FY 15 OLIN LIBRARY
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS WEST SIDE DOOR LOCATIONS (DOOR A & DOOR B) DOOR LOCATION PLAN (BASEMENT FLOOR PLAN) MAJOR MAINTENANCE FY 15 Draft Only A B

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y WEST ELEVATION WEST SIDE DOORS TO BE REPLACED WITH NEW FRP DOORS. ALSO PROVIDE NEW HARDWARE AS NOTED. 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS Draft Only P-26-2 DOOR ‘A’ DOOR ‘B’

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS P-26-3 DOOR ‘A’ – EXISTING CONDITIONS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS P-26-4 DOOR ‘B’ – EXISTING CONDITIONS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y Scope of Work (Reference MMFY15 Project Manual for all general project requirements) (See photo sheets for scope location clarifications) DOOR ‘A’ Contractor shall remove and discard door leaf, hinges, closer and threshold. Salvage “Deliveries Only” sign for reinstallation. Contractor shall salvage lockset and core – return to Owner. Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material. Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Submit shop drawings for final review and approval. Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb. Contractor shall prep and level concrete floor to accept new threshold. Repair exist interior VCT floor at threshold. Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames. Paint shall match existing colors. Contractor shall schedule door installation with Owner. Delivery access must be maintained at all times. Door removal and installation of new door must occur within the same day. Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS Draft Only P-26-5

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y Scope of Work (Reference MMFY15 Project Manual for all general project requirements) (See photo sheets for scope location clarifications) DOOR ‘B’ Contractor shall remove and discard door leaf, hinges and threshold. Salvage “Fire Panel” sign for reinstallation. Contractor shall maintain and protect existing automatic door closer, electric latch and card reader system. Contractor shall re-install activated electric latch, latch sensor and wiring. Coordinate with ISG (Integrated Security Group), Mike Veronese, , and new hardware to ensure compatibility and proper installation. Contractor shall salvage lockset and core – return to Owner. Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material. Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb. Submit shop drawings for review & approval. Contractor shall prep and level concrete floor to accept new threshold. Repair exist interior VCT floor at threshold. Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames. Paint shall match existing colors. Contractor shall schedule door installation with Owner. Egress must be maintained at all times. Door removal and installation of new door must occur within the same day. Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS Draft Only P-26-6

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y Products (Reference MMFY15 Project Manual for all general project requirements) Contractor shall field measure, coordinate, furnish and install the following. Verify all field dimensions for proper ordering. DOOR ‘A’ 1.DOORS: 1 ¾” thick FRP door with insulated core: Model # Ceco; Commercial Door Systems; or Approved Equal 2.HINGES: 3.EXIT DEVICE: 4.CLOSER: 5.THRESHOLD: 6.DOOR BOTTOM: 7.PERIMETER WEATHERSTRIPPING: 8.CORE: DOOR ‘B’ 1.DOORS: 1 ¾” thick FRP door with insulated core: Model # Ceco; Commercial Door Systems; or Approved Equal 2.HINGES: 3.EXIT DEVICE: 4.CLOSER: 5.THRESHOLD: 6.DOOR BOTTOM: 7.PERIMETER WEATHERSTRIPPING: 8.CORE: 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS Draft Only P-26-7