1 st Petal Prototype Fabrication completed October 27, 2008.

Slides:



Advertisements
Similar presentations
An Introduction to Glued Rigs
Advertisements

James Rasmussen.  Original dash was made from sheet metal, foam, and vinyl  Was too heavy for its purpose  Didn’t offer standard gauge sizes  Didn’t.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Mechanics/Cooling U.S. Silicon Strip Upgrade Meeting M. Gilchriese August 12, 2008.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Experiences and Issues with Carbon Foam at BNL & Yale BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006.
1 IST development status  Seattle  Composite Design.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Strip Petals: Local supports and prototype tests
Are there better ways to build a stave?
LBL Status August 5, 2008.
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
? ENDCAP: Mechanics IFIC-Valencia.
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
SANDWICH CONSTRUCTION
ODU SAE FORMULA MAE 435.
Aluminum Clamshell Vacuum Chamber Development Plan
Presentation transcript:

1 st Petal Prototype Fabrication completed October 27, 2008

1 st Prototype Components

Weights Weights of components are summarized below End-closeouts were aluminum for this prototype, would not be the case for real object (carbon material) ItemWeight(g) Carbon fiber facings61 Honeycomb16 POCO foam27 SS Tube32 Epoxy30 CGL30 Carbon tubes15 Subtotal211 Closeouts+pins43 TOTAL253

2 nd Prototype – Proposed Changes Add a bit more honeycomb(gap to side carbon tubes too large) Grind honeycomb flat before gluing to facing. Grind honeycomb to thickness after gluing one side to facing to improve thickness uniformity. Demonstrated on prototype piece Small increase in length of POCO foam(right up to outer closeout) Bond POCO foam/tube assembly to facings with Hysol 9396/30%(or more) BN instead of CGL-7018 => make rigid connection between foam and facing. Use bond-line control (the equivalent of 75 micron little shims) Modify U-section of POCO foam to allow for tube contraction as result of the above Reduce size of closeouts Bond closeouts with bond line control(glass beads) Decide about precision location of carbon tubes – try it on this prototype? Some minor tooling modifications to make assembly easier Currently scheduled for assembly Dec. 1-12