KEK cavity status, March 2011 H. Hayano, 03202011 ALCPG11, WG3, 03202011 Eugene.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Recent Surface Studies in KEK-STF
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
CEA DSM Irfu May 28th A RD 05: SURFACE PREPARATION STUDIES FOR SUPERCONDUCTIVE CAVITIES F. Eozénou, T. Saeki - F. Eozenou / T. Saeki - A_RD_05.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Recent Result for the STF-2 Cryomodule Operation
Cornell Updates Commissioning of T-map for ILC single cell starts.
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
for the FNAL/ANL, JLab, and Cornell cavity teams
S0 Status report from KEK
Cost reduction activities in cavity fabrication at MHI
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
Degradation and possible sources Statistic of resonators
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene

STF Phase-2 Accelerator STF tunnel Cryomodule assembly area Cold box

STF Plan (still under discussion) CY2009 CY2010CY2011 CY2012 CY2013 CY2014 S1-Global cryomodule STF phase-2 Phase2 Injector part (Quantum Beam) 1st Cryomodule Phase2 CM-2 construction (under discussion) Cryomodule construction and assembly operation phase2 Injector construction Phase2 CM-1 construction Cavity Fabrication Facility Infra-structure construction and start-upFacility operational operation KEK EBW operational 1st KEK cavity 2nd KEK cavity, ………….. 2nd Cryomodule (under discussion) 2 cavities 9 cavities

Cavity production plan in 2011 For STF phase-2 Cryomodule (1) MHI-012, MHI-013 : went to jacketing. will go to Capture Cryomodule. (2) MHI-014, MHI-015, MHI-016, MHI-017 : under surface process and VT. They will finish in Oct (3) MHI-018, MHI-019, MHI-020, MHI-021, MHI-022 : delivery in July Surface process and vertical test will finish in March Total 11 MHI cavities are planned. ( new production batch ) * These cavities are fabricated and inspected according to High-pressure-vessel code.

MHI-012 ~ 015 ; Recent production 9 cell cavities for STF phase-2 cryomodules MHI-012: 1 st VT Q0=5.5E09 Nov 11,2010 MHI-012: 2 nd VT Q0=6.2E09 Dec 08,2010 MHI-013: 1 st VT Q0=7.5E09 Nov 25,2010, MHI-013: 2 nd VT Q0=8.8E09 Dec 22,2010, MHI-014: 1 st VT Q0=3.4E09 Jan 20,2011 MHI-014: 2 nd VT Q0=4.1E09 Feb 17,2011 MHI-015: 1 st VT Q0=1.0E10 Feb 03,2011, MHI-015: 2 nd VT Q0=1.1E10 Mar 03,2011, 1 pit on cell #6 equator outside EBW seam 3 pits on cell #2, #3, #5 equators outside EBW seam Vacuum leak at beam-pipe flange during antenna assy. Helico-flex was exchanged. wide pits on Iris EBW seam between cell #8-#9 1 pit on cell #2 equator EBW seam Local grind was done. Local grind in the next

MHI-012 Eacc, X-ray

MHI-013 Eacc, X-ray

MHI-014 1st VT 2nd VT Field emission turned on, Heating at cell#8 120 degree, X-ray onset = 5 MV/m Field emission turned on, Heating at cell#8 90 degree, X-ray onset = 5 MV/m

MHI-014 Pass-band mode excitation 1st VT 2nd VT

STF 5π/9 Comparison of T-mapping and optical inspection MHI-014 after 1st VT Iris between Cell#8-#9 278degree Iris between Cell#7-#8 119degree

MHI-015 1st VT2nd VT Quench at cell#9 0 degree, No X-ray up to 28MV/m Quench at cell#2 60 degree, X-ray onset = 14MV/m Local grinding on Cell#2 60deg

MHI-015 1st VT 2nd VT Pass-band mode excitation

π, 5π/9, Comparison of T-mapping and optical inspection Nothing was found! 62°

15 STF Cavity Group Change of defect at Cell#2 equator after EP1after 1st VT grinding startgrinding finish EP2, VT

Jlab-KEK collaboration ICHIRO#7 at JLAB 3 times EP, 7 times VT ; collaboration with JLAB ICHIRO#7 EP at JLAB Clean room work at JLAB VT at JLAB F. Furuta

EP HPR 38MV/m reached cavity MHI-08 and Y. Yamamoto MHI-08 at JLAB : direct comparison of STF process and Jlab process Y. Yamamoto and K. Watanabe 1 time EP, 2 times VT ; collaboration with JLAB

1st VT : 12MV/m Field emission (pump broken during baking) 2nd VT : 22MV/m quench at cell#1 or cell#9 (26-29MV/m at cell#4 or cell#6) MHI-08 at Jlab

end Now STF activity was stopped by the AC power down of Big earthquake (March 11). Still AC power down and water down are continued, check and repair of AC line underway. So far, two or three turbo-pump were damaged by sudden power stop and strong swing. MHI-16 baking was stopped by this pump down. There was no cavity EP process and no vertical test on that day. Instead, lab-EP was performed. Fortunately, acid overflow by the swing was not much. (a few 10ml to the floor) We could safely terminated EP process immediately even AC power down and water down. There was no visible STF building damage, no visible infra-structure (EP, VT, clean-room) damage, no visible S1-G cryomodule damage, no visible RF power source damage, etc. It will resume in April. Very appreciate for warmhearted message from everyone. Earthquake on March 11 14:46