Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Pavement Rehabilitation Method
Bruthen Intersection Rehabilitation AustStab Awards of Excellence 2014 QRCG INNOVATION OR EXCELLENCE IN SUSTAINABILITY Sponsored by.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
Full-Depth Reclamation with Cement Metropolitan Government Pavement Engineers Council.
Sustainable Pavement Management Plan AustStab Awards of Excellence 2014 City of Gold Coast Category 3: Innovation or Excellence in Sustainability in pavement.
1 Resurfacing and Curb Ramps. 2 FHWA’s Americans with Disabilities Act Program / Section 504 of the Rehabilitation Act of 1973 The primary purpose of.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
NDDOT/LTAP Assistance Conference Mandan, North Dakota November 30, 2011.
Intro to our RoadRedi Team Trevor Chisholm- General Manager Patrick Grey- Estimator Steve Flemming- General Superintendant Pat Benoit- Superintendant.
District Information Session For the American Recovery and Reinvestment Act.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Long-Term Durability of Full-Depth Reclamation using Portland Cement
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Small City Funding Opportunities Transportation Improvement Board June 2010.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Transportation Alternatives. MAP-21 & TAP MAP-21 requires the following with respect to the allocation & selection of projects: ◦TAP funds sub-allocated.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Pavement Maintenance II
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Joint Urban Roadway Standards Workshop April 27, 2006.
Washington State Transportation Commission March 20, 2007 Jeff Monsen, PE Intergovernmental Policy Manager.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Maintenance & Rehabilitation Strategies Lecture 5.
Phase 2: 30% Design Plans September 4 th, 2012.
June 2012 Washington State Transportation Improvement Board Small City Funding Programs.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Julie Skallman State Aid Division Director & State Aid Engineer.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Geometric Design: General Concept CE331 Transportation Engineering.
Complete Streets Training
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Full Depth Reclamation
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Ferndale Complete Streets Ordinance
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Jefferson County SA Red Rocks Site Approval
District 3 Complete Streets Projects
Land Use Challenges In Maryland Today
Pavement Preservation
Early Voting Starts Oct. 20 | Election Day Nov
Illinois’ Joint Research Adventure
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves agricultural, residential and recreational traffic. Stemilt Loop Road Full-Depth Reclamation, Phase II, will continue preservation work started last year on Stemilt Loop Road.

Stemilt Loop Full Depth Reclamation, Phase II Full Depth Reclamation (FDR) is a pavement rehabilitation technique in which the full flexible pavement section and a predetermined portion of the underlying materials are uniformly crushed, pulverized or blended, resulting in a stabilized base course. Concrete is added to the mixed material for additional strength. The material is watered and compacted, resulting in a uniform high strength subgrade. After the new subgrade has set, a chip seal surface treatment will be used for the new driving surface. This process was successfully used for the first phase of Stemilt Loop FDR in 2010, and this project will be a second phase, taking the preservation work from milepost 2.18 for an additional two miles.

Stemilt Loop Full-Depth Reclamation, Phase II Full-Depth Reclamation (FDR) is a cost effective option for preservation work on Stemilt Loop Road. Full-Depth reclamation is not only an economically viable option, it is also a “green” option. FDR recycles materials from the existing roadway and requires less shipping of materials. Phase II will extend the previously completed preservation work that has already been well received by orchardists and residents of the area. Total Project Cost: $500, 000 County Funds: $ 67,500 Federal STP Funds Requested: $432,500

Chelan County Manson Downtown Overlay and ADA Upgrade: Wapato Way is a Rural Major Collector that runs through the community of Manson. The road serves agricultural, residential and tourist traffic. Phase I of the project will grind and overlay work at Wapato Way from Manson Boulevard to Green Street and upgrade deficient ADA facilities.

Manson Downtown Overlay and ADA Upgrade: The Manson Downtown Overlay and ADA Ramp Upgrade is Phase I of Chelan County’s Manson Downtown Business District project, identified on the County’s Six-Year Transportation Improvement Plan. Work will occur inside the current roadway prism and therefore will not require a lengthy environmental process or right-of-way purchase. Phase I of the project will grind and overlay work at Wapato Way from Manson Boulevard to Green Street. Wapato Way provides access for shopping, residential traffic, and tourism. The Manson Community Council and downtown business owners are in support of this much needed preservation project.

Stemilt Loop Full-Depth Reclamation, Phase II Curbs with outdated and dangerous ADA ramps from the sidewalk to street level will be corrected to the current ADA compliant standard at the time of the preservation work, improving mobility, safety and livability of the area for the disabled as well as all other motorized and non-motorized users. Total Project Cost: $250,000 County Funds: $ 33,750 Federal STP Funds Requested: $216,250