P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs.

Slides:



Advertisements
Similar presentations
Common Components of a Traditional Wood Framed Building
Advertisements

for Storm Survival, Long Term Reliability and Safety
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Seismic Retrofitting Of Older Homes
Type III Legacy Buildings Prosser Fire District 3 - Officer Development.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
CE A434 – Timber Design Structural Behavior.
MUSE 11B Buildings in Earthquakes Why do buildings do the things they do?
Type III Construction Jeff Prokop Ordinary Construction 200.
Infrared Thermography and The Building Envelope Regardless of the building type involved, infrared thermography can provide remarkable, nondestructive.
Jason A. Coffin, CFEI, CVFIOCIFire.com Marcus O. Durham, PhD, PEThewayCorp.com Robert A. Durham, PhD, PEThewayCorp.com.
Structures and Components.  Footing is located at the base of the foundation wall ◦ It is always at the bottom ◦ It is stuffed into the ground ◦ The.
Sample Problem ASCE 7-05 Seismic Provisions
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Chapter 19 Floors.
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
2001 Winter Presentation. Site Location Site View.
My Work Plan Carla Dickof.  I have reviewed the literature review done within our group  I am currently reviewing further case studies as well as research.
Architectural CAD I – IM230
World Trade Center 7 Building Performance Assessment.
George Read Hall The University of Delaware
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Common Components of a Traditional Wood Framed Building
Chapter 4 Lesson Goal After completing this lesson, the student shall be able to understand the effects of fire on common building materials and be able.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Explain the benefits of exterior home care Analyze home maintenance techniques.
E E R I TECHNICAL BRIEFING ON SEPTEMBER 30, 2009 PADANG, INDONESIA EARTHQUAKE Outline Building Types and Occupancies Acceleration Response vs Design Base.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Integrants: Arliss Delgado Ricardo Uzcategui Universidad Simón Bolívar Ingles para arquitectos y urbanistas II.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
WALLS.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
APPLICATIONS OF TECHNOLOGY
UNIT III.  Material used for engineering purpose can be divided into three group those required for their  1) Mineral Characteristics 2) Structural.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
2005 PS3 Summer Institute Buildings in Earthquakes Why do buildings do the things they do?
CAD-Architecture Inst: Mr. Johnston Logan High School
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
OBJ: SWBAT create a CAD Rendering of a Utility shed.
Coverage of Hikmat-Almasri Stadium
APPLICATIONS OF TECHNOLOGY
WALL Barrios Laura Bigott Dairet
How Completed Interiors Are Achieved: Designing & Building
Multistory Office Building
Southern Lehigh School District
High Altitude Performance Center
Floating Semi-Self Sustaining Housing Unit ET494
Warm-up 9/19/16 What template are we using?
Architecture Mr. Graves
NFPA 600, INDUSTRIAL FIRE BRIGADE Module : 11 BUILDING CONSTRUCTION.
Common Components of a Traditional Wood Framed Building
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Collapse Patterns.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Common Components of a Traditional Wood Framed Building
North Shore at Canton The Pennsylvania State University
Common Components of a Traditional Wood Framed Building
© OnCourse Learning.
Community Practice Asset Management.
The Edge Extreme Makeover.
Presentation transcript:

P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs to bring interest to our paths. JIM PANKO, PE MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S OVERVIEW 3 Story brick structure Wood framed floors and roof MARSHALL HOTEL INVESTIGATION CITY HALL WEST MAIN ALLEY DAILY GRIND MARSHALL HOTEL FOUNDATION 2 ND -ROOF

P A U L S E N A R C H I T E C T S ROOF STRUCTURE 1 ½”x9 ¼” Hem-fir joist at 16” O.C. Snow load capacity of 35 psf Moisture damage at north end of structure from insufficient roofing membrane MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Failed roof membrane MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Failed roof membrane MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Failed roof membrane MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Damaged roof structure on North end MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Damaged roof structure on North end MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Water intrusion at light well MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOF STRUCTURE Damaged roof structure at light well MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S THIRD FLOOR 1 ½”x13 ¼” Hem-fir joist at 16” O.C. Live load capacity of 60 psf Moisture damage at light well and North end of structure MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S THIRD FLOOR Moisture damage in light well bearing wall and adjacent floor joist. MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S THIRD FLOOR Moisture damage at north end of structure from leaking roof MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S SECOND FLOOR 1 ½”x13 ¼” Hem-fir joist at 16” O.C. Live load capacity of 60 psf Moisture damage at various locations MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S SECOND FLOOR Inadequate drainage on light well roof Load bearing light well wall transfers load to second floor joist MARSHALL HOTEL INVESTIGATION ROOF DRAIN

P A U L S E N A R C H I T E C T S SECOND FLOOR Water damage at various plumbing lines Water damage from leaking roof MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S MAIN FLOOR 1 ½”x 9 Hem fir 16” O.C. Live load capacity of 80 to 85 psf Shear failure on part of floor structure MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FOUNDATION Stone and cast in place concrete foundation walls Foundation is connected to adjacent Structures MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FOUNDATION MARSHALL HOTEL INVESTIGATION Inside Daily Grind looking at east foundation wall of Marshall Hotel Inside City Hall looking at west foundation wall of Marshall Hotel

P A U L S E N A R C H I T E C T S PARTY WALLS Marshall Hotel west bearing wall is independent from adjacent structure. MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S PARTY WALLS Marshall Hotel east bearing wall is independent from adjacent structure. MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOFTOP SIGN Corroded sign structure Six guy cables failed MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S ROOFTOP SIGN Corroded sign structure & failed guy wire MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FRONT SIGN Remove remaining glass tubing MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FRONT CANOPY Can support a balanced snow load 35 psf Structurally inadequate to support the snow loads from the effects of drifting per ASCE 7-05 MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FRONT CANOPY Bolt insufficient to support drift loads MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S FIRE ESCAPE Structurally adequate to support snow load and self weight as an un-occupied structure. Depending on future occupancy, may not be adequate to serve as an exit. Fire escape appears to impede on Right of way for alley. MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S CONCLUSIONS MARSHALL HOTEL INVESTIGATION REQUIRED REPAIRS AS UN-OCCUPIED STRUCTURE ACTION Removal of rooftop sign Removal or repair of canopy Removal of loose roofing material Removal of remaining glass on front sign Replacement of roofing membrane Repair of all damaged roof structure TIME FRAME 60 Days At the time of replacing roofing membrane

P A U L S E N A R C H I T E C T S ESTIMATE OF REPAIRS Cost estimate for repairs required to protect the general public from harm as an un-occupied structure. Additional repairs and upgrades will be required before the structure can be occupied. MARSHALL HOTEL INVESTIGATION

P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs to bring interest to our paths.