Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,

Slides:



Advertisements
Similar presentations
Collimation and tagging instrumentation for the GlueX photon beamline Richard Jones Igor Senderovich, Anne-Marie Carroll University of Connecticut APS/DNP.
Advertisements

TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Microscope Performance at elevated dark rates Richard Jones University of Connecticut collaboration GlueX collaboration meeting, Newport News, Feb. 2-4,
Diamond Radiator Development Brendan Pratt University of Connecticut GlueX Collaboration Meeting, Jefferson Lab, October 2011.
Tagger Microscope:  Performance Features Under Test Detector Alignment  Simulations show that when fiber axis is aligned to < 3 o of the e - trajectory.
James M c Intyre University of Connecticut GlueX Collaboration Meeting JLab, Feb. 2-4, 2011.
Active Collimator Test in Hall B Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting September ,
Beam Position Stabilization Using an Active Collimator in Hall D at Jefferson Lab Richard Jones, University of Connecticut, for the GlueX collaboration.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Tagging Near the End-Point Richard Jones, University of Connecticut GlueX Collaboration Meeting, Newport News, May 8-10, Current design capabilities.
Experimenting with Quarks Prof. Richard Jones University of Connecticut, Storrs Science Symposium, Darien High School, May 28, 2008.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Status of Møller Polarimeter Peter-Bernd Otte September 23, th Collaboration Meeting, Mainz.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
M. Dugger, February Triplet polarimeter study Michael Dugger* Arizona State University *Work at ASU is supported by the U.S. National Science Foundation.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
A Measurement of Two-Photon Exchange in Unpolarized Elastic Electron-Proton Scattering John Arrington and James Johnson Northwestern University & Argonne.
Thomas Jefferson National Accelerator Facility Page 1 IPR June 26-28, 2007 Tagger microscope R&D: silicon photomultiplier tests integrate pulsesintegrate.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Gain stability and the LYSO beam radiation monitor measurements
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
EZDC spectra reconstruction and calibration
Collimation and tagging instrumentation
SHiP straw tracker prototype tests
M. Jones B. Wojtsekhowski
Example of DAQ Trigger issues for the SoLID experiment
The PrimEx-I Experiment
Tagger Microscope Detector & Electronics Status
G0 Beam Polarization T. Horn, D. Gaskell Jefferson Lab
C.F. Feb
C.F. Feb
Collaboration between Hall C and Hall D
Presentation transcript:

Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich, Brendan Pratt, James McIntyre, Fridah Mokaya, Alex Barnes, Chris Pelletier, John Turner, Anne-Marie Carrol, Jessica Hyde – University of Connecticut Alex Somov, Hovanes Egiyan, Jefferson Lab GlueX collaboration meeting, Bloomington, May 9-11, 2011

2 Outline Goals Preparations Run conditions Active collimator data Microscope prototype data Status of analysis and outlook

GlueX collaboration meeting, Bloomington, May 9-11,20113 Goals Active Collimator Measure the error of the beam centroid position as a function of the input filter bandwidth. Record the current on all four sectors in a pair of opposing quadrants simultaneously. Check that we have correctly understood the reason for anomalous peaks seen in the data from the 2007 beam test. Microscope Prototype Measure the light yield for a high energy electron moving along the axis of a fiber. Measure the TDC time resolution achievable using the UConn preamp, leading edge discriminator, F1TDC. Check the rate dependence (efficiency, time resolution) predicted by our simulation with real data.

GlueX collaboration meeting, Bloomington, May 9-11,20114 Preparations Construction of prototypes at UConn (reported before) Igor Senderovich, Brendan Pratt, James McIntyre, RJ drive down to JLab during Spring Break, installation begins. Active collimator installed in Hall B alcove Active collimator installed in Hall B alcove Alex SomovHovanes Egiyan UConn crew went home, leaving microscope in the hands of Alex Somov and Hovanes Egiyan. found DAQ crate, electronics found a DAQ computer that is legal built a CODA system from scratch designed and tested a readout trigger verified that everything worked reminded RJ not to worry built and tested trigger scintillator found the right hookups in Hall B got AC translation stage working with our labview-based DAQ had Hall B contacts to get it done with minimal disruption to them

GlueX collaboration meeting, Bloomington, May 9-11,20115 Preparations Construction of prototypes at UConn (reported before) Igor Senderovich, Brendan Pratt, James McIntyre, RJ drive down to JLab during Spring Break, installation begins. Active collimator installed in Hall B alcove Active collimator installed in Hall B alcove Alex SomovHovanes Egiyan UConn crew went home, leaving microscope in the hands of Alex Somov and Hovanes Egiyan. Microscope prototype installed under Hall B tagger Microscope prototype installed under Hall B tagger Both devices were tested during 6 intensive days of the photon tagger re-commissioning, Mar. 26 – 31. Both devices were tested during 6 intensive days of the photon tagger re-commissioning, Mar. 26 – 31.

GlueX collaboration meeting, Bloomington, May 9-11,20116 Preparations James McIntyre Brendan Pratt Igor Senderovich

GlueX collaboration meeting, Bloomington, May 9-11,20117 Run conditions Beam energy: 3361 MeV Current: 15 nA, 60 nA Collimator: 2.6 mm Radiator: radiation lengths, gold stability – very good collimator DAQ – labview over VNC, no issues prototype DAQ – full CODA install, data rates pushed the limits, dead time 2.5 kHz with event size 4kB (10 MB/s to disk) thanks to Dave Abbott for help with hanging DAQ

GlueX collaboration meeting, Bloomington, May 9-11,20118 Active collimator

GlueX collaboration meeting, Bloomington, May 9-11,20119 Active collimator data inner wedges, horizontal scanouter wedges, horizontal scan  extra peaks are gone, line shapes are now completely normal, analysis underway

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype placement scan of relative count rate in direction along the tagger magnetic field floor layout under the Hall B tagger

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype placement fiber axis as installed ?

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype rates 60 nA corresponds to 50 kHz / 2mm energy bin observed rate 2-5 kHz per fiber probably were not perfectly centered along x trigger scintillator counts much faster, per nA, than 5 x summed fiber rate some fraction of rate in trigger counter comes from bg – lots of interactions in fp material upstream some fraction of rate in trigger counter comes from bg – lots of interactions in fp material upstream phototubes on trigger scintillator saturated at around 350 kHz, one worse than the other. phototubes on trigger scintillator saturated at around 350 kHz, one worse than the other. about 1.3 x 10 8 triggers recorded, full 500 ns fADC traces recorded, so analysis does not need to rely on the trigger. about 1.3 x 10 8 triggers recorded, full 500 ns fADC traces recorded, so analysis does not need to rely on the trigger.

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber A1

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber B1

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber C1

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber D1

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber E1

GlueX collaboration meeting, Bloomington, May 9-11, Microscope prototype data A B C D E beam’s eye view dispersion direction fiber sum2 the gains were never matched

GlueX collaboration meeting, Bloomington, May 9-11, Status of analysis and outlook 600 expected mean pixel count ~ 350 x 1.7 = pixels 600 is 400 saturation cuts spectrum off at 1600 pixels, visible in peak asymmetry – see fiber C1 – 600 is 400. ADC peak 1200 nominal design is ~ 2 mV / pixel pedestal(400) + signal(800) = ADC peak 1200 so far, evidence is consistent with expectation so far, evidence is consistent with expectation summed channels difficult to analyze single fiber fADC is 500 mV full scale, 0.5 mV/count using Qsum should be possible to resolve single-pixel pulses,TBD time resolution results yet to come, against beam RF time resolution results yet to come, against beam RF