Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.

Slides:



Advertisements
Similar presentations
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Introduction The input network of the power amplifier will be designed in the example. The network synthesized will be expanded to allow for biasing of.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Physical and Mechanical Characteristics of Pb-free Solder - Copper Joints Project funded by OFES (Switzerland) Within the framework of :Cost Action 531:
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST6 Training XpresRoute (tubing)
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
AE4131 ABAQUS Lecture Part IV
Geometry Formulas Section Formulas  Perimeter of a Triangle:  Area of a rectangle:  Volume of a box:
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Geometry Honors Section 7.1 Surface Area and Volume of Boxes.
Introduction to Controlling the Output Power of a Transistor Stage A load network will be designed to maximize the output power obtainable from the Mitsubishi.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
General Instructions for “KidWind Light” wind tunnel.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Temperature Rise in PCBs1 n Temperature rise in a conductor is related to the current flow and cross sectional area. n Must not exceed the safe operating.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Geometry Formulas Section Formulas  Perimeter of a Triangle:  Area of a rectangle:  Volume of a box:
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Section P7 Equations. Solving Rational Equations.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Micro channel cooling Milestones proposal. Year 1 1) Requirement system definition in operational condition. Technology constraints for DRIE on chip design.
Summary LBNL LSWG meeting
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Date of download: 10/13/2017 Copyright © ASME. All rights reserved.
Mastering Autodesk Revit MEP 2016
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Reminder of Stave250 Tooling Design
Date of download: 12/30/2017 Copyright © ASME. All rights reserved.
GTR Proposed amendments of the three-point bending certification test figure Current : When performing certification tests according to the figure,
Chapter 7 – Special Right Triangles Review
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
2 types of scale factor problems
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
Rack Placement Chopper Workshop
Practice Geometry Practice
Presentation transcript:

Stave 130 Tooling John Carrol & Tim Jones

Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width 115 (nominal) with variability in c-channel placement – Vacuum Channels Original single channel with 4 feeds on long sides replaced by end-feed in sections Outstanding issues being worked on – ‘C’-channel jig model errors affecting z placement – ‘C’-channel spacing requirement – ‘C’-channel geometry – Extra features for locking point attachment jig – Cooling tube path at end of stave (need to understand if there’s a clash with tolling?)

Stave Assembly Tooling Face sheet locator Vacuum Jig ‘C’-channel spacer ‘C’-channel rails

Proposed Vacuum Channel Network

C-channel spacing Adjustment