Or, how I learned to stop worrying and embrace high-resolution imagery Carrie GuilesAnn Rodman Yellowstone National.

Slides:



Advertisements
Similar presentations
REQUIRING A SPATIAL REFERENCE THE: NEED FOR RECTIFICATION.
Advertisements

DIGITAL PROJECTS AND GIS by Stephanie C. Haas, Joe Aufmuth, by Stephanie C. Haas, Joe Aufmuth, and Mark Sullivan University of Florida Libraries
Computer Basics Hit List of Items to Talk About ● What and when to use left, right, middle, double and triple click? What and when to use left, right,
Calstock Parish Archive History on the Ground Project.
Lecture 1: Overview of Computers & Programming
Leica Photogrammetry Suite
NAPP Photo Five Pockets near Dubois. Google Earth.
CS 128/ES Lecture 10a1 Raster Data Sources: Paper maps & Aerial photographs.
Geospatial World Forum Jan 19-21, Future of Photogrammetry Rolta’s Vision.
1 High-Resolution Orthorectified Imagery for the Coastal Areas of Bering Land Bridge NP (BELA) and Cape Krusenstern NM (CAKR), Northwest Alaska William.
WILD 5750/6750 LAB 5 10/04/2010 IMAGE MOSAICKING.
GIS Tutorial 1 Lecture 6 Digitizing.
Aerial photography and satellite imagery as data input GEOG 4103, Feb 20th Adina Racoviteanu.
Sullivan University Library EbsCOhost® is a database collection that is provided by the Kentucky Virtual Library® (KYVL ® ). What is KYVL®? KYVL® is.
Systems Software Operating Systems.
High-Performance Computing for Processing Earth Observation Data By Dr Ashok Kaushal Senior Divisional Director Enterprise Geospatial & Defense Solutions.
Use of Remote Sensing Data for Delineation of Wildland Fire Effects
8/27/20151 Mosaicing Historic Photos with ArcGIS James Twoteeth GIS Analyst CDA Tribe GIS.
Possible Satellite Data Sources Chris Elvidge NOAA-NGDC January 22, 2008.
Chapter 18: Windows Server 2008 R2 and Active Directory Backup and Maintenance BAI617.
Enhancing WV's Oblique Imagery Capture to Meet the Needs of Public Safety Jason Sealy District Manager for WV, MD & DE Scott Yoder Regional Technical Manager.
Types of Computers Mainframe/Server Two Dual-Core Intel ® Xeon ® Processors 5140 Multi user access Large amount of RAM ( 48GB) and Backing Storage Desktop.
Scale, Resolution and Accuracy in GIS
Building Enterprise GIS at the West Virginia Department of Environmental Protection: 2003 Progress Information Technology Office Technical Applications.
Geographic Information System GIS This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF GIS Geographic Inf o rmation.
Conversion of Forestland to Agriculture in Hubbard County, Minnesota By: Henry Rodman Cory Kimball 2013.
Farm Service Agency National Agriculture Imagery Program (NAIP) Pecora Conference November 13, 2002 Denver, Colorado Kent Williams, USDA FSA Aerial Photography.
Land Cover Classification Defining the pieces that make up the puzzle.
U.S. Department of the Interior U.S. Geological Survey Geometric Assessment of Remote Sensed Data Oct Presented By: Michael Choate, SAIC U.S.
Orthorectification using
Geography 160 Project 3 Using Map Data and Integrating it into GIS By Jerrica, Daniel, and Aaron.
10/7/2015 GEM Lecture 15 Content Photomap -- Mosaics Rectification.
Stereo Analyst Extension ERDAS product Extension for ArcGIS Desktop View stereo image pairs 3D feature collection.
CE497 Urban Remote Sensing, Jie Shan1 Geometric rectification Homework 5.
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
Task 16 Describe the need for document control (such as ensuring that completed models are approved, labelled and stored on a suitable storage medium).
OCR GCSE Computing © Hodder Education 2013 Slide 1 OCR GCSE Computing Chapter 2: Memory.
2010 LiDAR Collection in West Virginia’s Coal Fields West Virginia GIS Conference June 9, 2010.
USFS - Region 6 Imagery Program. Landsat TM 25+ scenes downloaded from MRLC Landsat Science collection.
1 Memory Management Chapter 7. 2 Memory Management Subdividing memory to accommodate multiple processes Memory needs to be allocated to ensure a reasonable.
DIGITIZING - BUILDINGS - ROADS Digitize on rectified image.
Wetlands Investigation Utilizing GIS and Remote Sensing Technology for Lucas County, Ohio: a hybrid analysis. Nathan Torbick Spring 2003 Update on current.
Generation of a Digital Elevation Model using high resolution satellite images By Mr. Yottanut Paluang FoS: RS&GIS.
CE403, Geometric rectification Homework 6. CE403, Description Objective: geometrically rectify a portion (~2km*2km) of SPOT image over West.
LiDAR Remote Sensing of Forest Vegetation Ryan Anderson, Bruce Cook, and Paul Bolstad University of Minnesota.
ESA EOFI Kick-off meeting – 17/05/ Earth Observation for International Financial Institutions Service Trial 3 VHR satellite imagery.
U.S. Department of the Interior U.S. Geological Survey Afghanistan Natural Resource Assessment and Reconstruction Project Geospatial Infrastructure Development:
IMAGERY.
12/12/20071 Digital Resource Acquisition John Mootz, APFO Charlotte Vanderbilt, APFO.
2010 LiDAR Collection in West Virginia’s Coal Fields WVAGP Meeting December 7, 2010.
Sub pixelclassification
An Analysis of Coastal Erosion Along the Chukchi Coast at Barrow, Alaska Leanne R. Lestak, William F. Manley, James A. Maslanik, Amanda H. Lynch and Timothy.
ArcGIS 9 ch 4 Edited 11/4/05 1 Creating and Editing Data in ArcGIS 9 Data can be created and edited manually in a GIS. Using the imagery provided for your.
John Samuels October, Why Now?  Vista Problems  New Features  >4GB Memory Support  Experience.
Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Current.
Summary of CRSDC Advantages  Single point access to commercial satellite imagery  Eliminates the need for multiple agencies to establish data- purchase.
Golden Valley, Minnesota Image Analysis Heather Hegi and Kerry Ritterbusch.
Networking Objectives Understand what the following policies will contain – Disaster recovery – Backup – Archiving – Acceptable use – failover.
 ftp://edacftp.unm.edu/spenman/geog581L/examples_georefer ence FTP SITE.
Installing RMS 3.0 Contractor Mode
Image Geo-Referencing in ArcGIS
Training Using EDDMapS
Chapter 4: Application Software
Washington Geological Survey
Hazards Planning and Risk Management
Lab1 Instruction Georeferencing a raster
Hazards Planning and Risk Management
Hazards Planning and Risk Management
Digitizing - Buildings - Roads
Calculating land use change in west linn from
Presentation transcript:

Or, how I learned to stop worrying and embrace high-resolution imagery Carrie GuilesAnn Rodman Yellowstone National Park

Combination of several projects and divisions needing high-res imagery + End of year monies = 1600 square Kilometers of QuickBird Ortho-Ready panchromatic/multispectral imagery

 orthorectified, 2-foot resolution multispectral imagery with less than 2 meter overall error.  for background imagery in cartographic products and for heads-up digitizing of features  No problem! Someone HAS to have written a detailed how-to document for this!

Right?… Found 30+ journal articles, but few clues and no step-by-step methodologies

1. Mosaic (unchip) by scene 2. Source your DEM 3. Orthorectify the panchromatic and multispectral bands 4. Pan-sharpen your multispectral imagery 5. Georeference using ground control points

In order to squeeze the imagery on to DVDs, Digital Globe splits up the scenes into tiles. Not an issue until you realize that the RPC files needed to orthorectify the imagery are delivered by SCENE not by tile. So you have to re- assemble the scenes before orthorectifying.

Cannot stress this enough - when using Imagine to orthorectify you NEED a DEM that does the following: covers your full area of interest and has horizontal and vertical reference EXACTLY the same as your imagery

 Done using the LPS Extension of ERDAS  Using sensor and image information provided by scene, and using the DEM, you end up with 2 orthorectified images per scene (one panchromatic, one Multispectral)

 At this point, you should have a pan-sharpened, ortho-corrected image. If desired, you could have used any ground control points (GCPs) during the orthorectification process in Imagine. In our case, since the imagery follows road corridors and the spread of the available GCPs is linear, processing the imagery with GCPs at that point resulted in unsatisfactory products.  Instead, we are using our network of ground control points to run georeferencing in ArcMap after the pan-sharpened product is finished. This adds an extra step to the process, but results in a higher quality image.

 error of less than 1.5 meters using control points for verification  Recent points taken by geology field crew at Old Faithful are within 0.5 meters (using Trimble GeoXH)  Contacted by NAIP processing crew, and they are using our GCP database to rectify the 2009 NAIP imagery.

 Collecting ground control points ad hoc for smaller projects has a long tradition at Yellowstone NP.  We had many projects from GIS and Geology with GCPs scattered throughout project folders.  With ~1600 km of high-resolution QuickBird imagery we realized that we had a choice: register the QuickBird to the existing NAIP imagery (with a ~3m accuracy in areas of low relief, ~7 m in high) or make the QuickBird imagery our best data set to which we could then register other imagery. We chose the latter.

 Used short-term volunteers to collect points over summer 2008 & 2009  1,200+ points  Not all are useful…

Check for free imagery on the NGA WARP site and use the CIDR tool! (these are changing all the time) Order full scenes rather than by convoluted Area of Interest (such as buffers along roads) Purchase 2 external hard drives – one to backup your data daily and one to work from. We used one 1 TB hard drive for processing and backed up to our network drive. When dealing with large amounts of imagery (multiple scenes), keep a log file of your imagery – spreadsheet works fine. Most processing was done on a computer with a quad-core processor and 8 GB of RAM. We did spread the work around though, and some was done on dual-core processor with 2 GB of RAM. It just ran MUCH more slowly – some processes will run for 8+ hours. Train your ground control point collection crew to a specific method before setting them loose with GPS units!

 Available upon request: How-to documents for the image processing and Ground Control Point collection 31.pdf reference papers used to create this methodology