Shoreline Cleanup and Assessment Technique (SCAT) Simple and comprehensive way to perform a survey of an affected shoreline Systematic approach using standardized.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Risk Management Introduction Risk Management Fundamentals
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Sustainable Approaches: Industrial Ecology and Pollution Prevention Chapter 21 © 2004 Thomson Learning/South-Western.
1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
Cleanup of Contaminated Areas Aaron D. Green, Project Manager Remediation Branch IDEM’s Office of Land Quality.
BoRit Superfund Site Timeline
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
ICN Merger Working Group Work Product Merger Review Workshop March 10-11, 2009 Taipei.
DISTRIBUTED BY. A non-toxic, Planet Friendly solution for soil remediation  Proven effective in the field with documented test results Environmental.
General Information on Florida’s Cattle Dip Vats.
Phytotechnologies for Environmental Restoration and Management Micah Beard, M.S. Shaw Environmental, Inc.
Proposed Changes to DEQ Heating Oil Guidance. Background Present guidance developed in 2006/early 2007 became effective in March heating oil.
Horticulture Science Unit A Horticulture CD Understanding Integrated Pest Management Problem Area 5.
2 3 Common methods used to identify hazards include:  Workplace inspection  Process or task analysis  Review and analysis of past workplace accidents.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Unit III Impact Assessment and Environmental Protection An Introduction.
Delivering sustainable solutions in a more competitive world Oil Spill Response Planning Coastal and Marine Environmental Sensitivity Mapping Simon Ross.
Kevin Brackney, M.S., P.G. Nez Perce Tribe.  NPT Environmental Response  Historic Spills Clearwater Basin ◦ Impacts from both large and small spills.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Financing Brownfield Redevelopment Barbara Vojvodíková Daiva Velykienė.
February 18, 2004 Public Meeting Barge 120 Spill Buzzards Bay, Massachusetts.
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
Prioritize Contaminated Sites With a Known Release and a Pathway That Poses the Greatest Threat of Exposure  Pathways to surface water Freshwater wetlands,
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Brownfields Health Risks & Remediation Diogo Cadima Topic ‘A’ Term Project CET 413.
Unit 5.6 Evidence and Sampling.
Module 1: Introduction to the Superfund Program. 2 Module Objectives q Explain the legislative history of Superfund q Describe the relationship between.
1 of 21 Introduction to the EPA 7-Step DQO Process DQO Training Course Day 1 Module 7 (30 minutes) Steps Presenter: Sebastian Tindall.
MRL Eye Airport Operators Association Conference.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
The Contaminated Sites Cleanup Process (18 AAC 75)
Ch Water Sustainability through Science and Technology.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
#3 - Structures to produce energy from water Design Brief - design a device that could generate power from the movement of water. Build a model of the.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Regulatory Framework for Uranium Production Facilities in the U.S.
BEST MANAGEMENT PRACTICES VOLUME I INSPECTION (EVALUATION PROCESS) P.C.O.C. Training.
South Australia’s Environment Protection Authority Articulating aesthetics Monday 24 August 2015 Andrew Pruszinski.
NATURAL RESOUCE DAMAGE ASSESSMENT AND RESTORATION Shelly Hall – Assistant Solicitor Branch of Environmental Restoration Branch of Environmental Restoration.
U S Environmental Protection Agency
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
Margaret Byrne, U.S. Fish and Wildlife Service
Part 6 – Special Legal Rights and Relationships Chapter 34 – Environmental Law Prepared by Michael Bozzo, Mohawk College © 2015 McGraw-Hill Ryerson Limited.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Status of Sediment and Groundwater Remedies. Or… What’s up with that O&F Determination?
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pete Doorn Special Remediation Branch Superfund Section Division of Waste Management
OPRC Level 3 Spill Response Objectives and Policy Issues.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
OPRC Level 3 Spill Response Strategies Limitations and Issues.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
OPRC Level 3 Termination of Response. OPRC Level 3 2 Outline Reasons for clean-up Options for clean-up Factors affecting the decision to terminate operations.
Proposed Plan for No Further Action
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Benchmarking Method Glen Anderson, Chief of Party
Water Design Challenge
ENVIRONMENTAL ASSESSMENT TOOLS
Warmup 10/22/12 As the population of Durham increases…
Water Design Challenge
Board of Public Utilities August 17, 2017
FOR SEWAGE DAMAGE CLEANUP IN ST PAUL, VISIT ICC RESTORATION AND CLEANING SERVICES! OUR TEAM OF EXPERTS IS TRAINED AND EXPERIENCED WITH USING THE PROPER.
Presentation transcript:

Shoreline Cleanup and Assessment Technique (SCAT) Simple and comprehensive way to perform a survey of an affected shoreline Systematic approach using standardized terminology to collect data on shoreline oiling conditions Material Summarized from NOAA Shoreline Assessment Manual

A Shoreline Assessment Program Supports decision making for shoreline cleanup Flexible in terms of scale of the survey and detail of the data sets collected Multi-agency with trained representatives from all interested parties who have authority to make decisions Material Summarized from NOAA Shoreline Assessment Manual

SCAT Team Responsibilities Evaluate oiling conditions Factor in shoreline types Identify sensitive resources Determine need for cleanup Recommend cleanup methods and endpoints Place constraints on cleanup if necessary, due to ecological, economic, or cultural concerns Post-cleanup Inspections and Final sign-off of clean-up activities Material Summarized from NOAA Shoreline Assessment Manual

Key Considerations for Endpoints: (Riparian, Stream Banks, Man-made Structures) Is proposed shoreline segment safely accessible for cleanup? Is proposed endpoint practicably and technologically achievable? Will additional removal cause more damage than leaving the residual oil in place for natural weathering and biodegradation? Will remaining oil represent either an environmental hazard, historical/cultural property threat, or human use nuisance?

Proposed End-Points: (Riparian, Stream Banks, Man-made Structures) Remove and/or abate visible oil and or sheen affecting Yellowstone River Shorelines no longer release sheens that affect Yellowstone River Oil no longer rubs off on contact Oil removal to the point where recovery can occur without causing more harm than leaving the oil in place. Structure no longer generates liquid oil or sheen

Key Considerations for Endpoints: (Upland Areas) Areas that are traditionally safer to access Is proposed endpoint practicably and technologically achievable? Areas that may be less ecologically fragile

Proposed End-Points: (Upland Areas) Characterize and assess per MDEQ Guidance Remediate to meet the higher of background and/or soil, groundwater, and drinking water standards associated with the Montana RBCA Guidance for Petroleum releases