Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.

Slides:



Advertisements
Similar presentations
CASE STUDIES Client:Developer of former Manufactured Gas Utility Plant Property Problem:Developer bought contaminated former plant site to develop for.
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Background Presenters Work done in preparation for WHS changes
The NIH Perimeter Security System Protecting the people, research, reputation and facilities of the National Institutes of Health.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
MPCA Citizens’ Board Information Item February 25, 2014.
BoRit Superfund Site Timeline
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
HISTORICAL OVERVIEW : ROUTE 66 MERAMEC RIVER BRIDGE Jane Lee MoDOT Historian Courtesy of Joe Sonderman.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
SETUP Chapter 6 Lead Abatement for Workers Course.
6 th Street Water Main And Street Reconstruction 2013.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Pequest Trout Hatchery & Natural Resource Education Center Located on Route 46 in scenic Warren County New Jersey.
Partnerships and Processes Landfill Redevelopment.
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
Presentation to Maxwell Place Homeowners Association 1.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Rhode Island Department of Environmental Management
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Metropolis Towers Cleanup Phase No. 1 Public Meeting Frank Conwell Middle School Jersey City, N.J. February 21, 2013.
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation April 10th, 2013.
Facility Lead Corrective Action Opportunities with Union Carbide RCRA National Meeting May, 2005 Bob Greaves EPA Region 3.
WORKER SAFETY Radionuclides Web Cast August 4, 2004 Loren W. Setlow Office of Radiation and Indoor Air
Background and lessons learned Managers Meeting February 13, 2014.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
A Hazardous Waste Site PCB Contamination. Polychlorinated Biphenyls (PCBs) Man-made class of oil-like chemicals used in the manufacture of electrical.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Bricke Murfree Murfree & Murfree, PLLC Attorneys-at-Law 805 South Church St., Suite 21, Murfreesboro, TN Phone:
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Public Meeting October 21,  Open House6 - 7 PM  Presentations7 - 7:50 PM  Break7: PM  Q & A8 – 9 PM  Conclude9 PM.
Brownfields 2004, “Light or Heavy Starch: Cleaning the Cleaners” September 2004 Presented by Matt Shurtliff Roosevelt Towne Apartments.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
New Life for Landfills One Man’s Trash Another Man’s Treasure.
PORT OF TACOMA. [Insert Project photo as background] Project Update Parcel 88 Combined Habitat Project.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
OPERATION SAFETY THE DAY AFTER. 2 ANNOUNCEMENT: AT APPROXIMATELY 22:30 HOURS (10:30 pm), AN EF2 TORNADO TOUCHED DOWN AT THE INTERSECTION OF WEST STREET.
1 East 115th Street MGP Site Remediation Status Update Manhattan Center for Science & Math Parents Association Meeting May 17, 2016.
Jefferson County SA Red Rocks Site Approval
Historical Overview : Route 66 Meramec River Bridge
Presentation Outline Background Summary of City Actions
Harbour Island Force Main Replacement
Institutional Controls At Voluntary Cleanup Sites
the path less traveled Termination of Post Closure Care
Presentation transcript:

Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013

2 Overview Chrome processing in Hudson County Settlement agreement Health and safety measures Scope of Metropolis Towers cleanup Review of first phase What to expect during second phase Preparations for third phase Update on basement of Building No. 2 Questions and answers

From 1905 to 1976, Hudson County was a center for chrome manufacturing, processing chromite ore imported from around the world Waste from two plants in Jersey City and one in Kearny was used as fill at construction sites PPG Industries purchased a plant on Garfield Avenue in 1954 and ceased operations in 1963, selling the facility and property in 1964 Chrome in Hudson County

In 2009, NJDEP, Jersey City and PPG signed a settlement in Superior Court in which they agreed to a process to clean up PPG chromium sites in Hudson County, including Metropolis Towers Created new position of an independent, court- appointed Site Administrator with responsibility to develop a master schedule and to facilitate cleanup- related activities among the parties Created new position of an independent technical consultant to assist site administrator and provide technical review and work plan evaluation in support of NJDEP regulatory responsibilities Settlement Agreement

Health and Safety Measures Health and safety of the surrounding community and workers during site excavation is a top priority Multiple, overlapping, prevention and protection measures have been adopted at all sites, including Metropolis Towers: Dust Suppression Plan Entire Site Air Monitoring Plan Resident Safety and Security Plan Traffic Safety and Control Plan Developed by experienced experts for PPG Reviewed by Independent Technical Consultant, NJDEP and City/ERFS

 Chromium contaminated soil is being removed at Metropolis Towers in accordance with NJDEP Chromium Policy residential requirements  Contaminated soil is being hauled off-site to a licensed disposal facility  Clean fill is being placed in excavated areas  When complete in September 2014, 37,000 tons of soil and debris will have been removed Scope of Cleanup – Phases 1, 2, 3

 Work began in March  Approximately 6,000 tons of contaminated soil and debris were excavated and hauled away  Excavation was completed in accordance with DEP regulations  Work area was completed in July  No injuries or lost-time incidents Phase 1 is Complete

Air Monitoring Results Chrome and dust were well within safety levels during first phase Air monitoring conducted 24/7 Stringent air monitoring and dust control continue in Phase 2 and 3 Multiple air monitors located throughout the site

Examples of Air Monitoring Locations Work Zone Air Monitors Worker Hand Held

Air Monitoring Website  Website displays results for dust and chrome  Dust concentrations serve as a real-time indicator for possible hexavalent chromium concentrations  Hexavalent chromium samples require laboratory analysis 

Phase 2 Begins Sept. 23  Contaminated soil between buildings 1 and 2 (formerly the old “mall/plaza”) will be excavated  Work will be conducted weekdays beginning at 7:30 a.m. and could last until 6 p.m.  Approximate average depth of excavation is 12 feet  Phase 2 to be completed March 2014

Fence will separate work zone from residents. Entrance on Montgomery will be closed to vehicular and pedestrian traffic so PPG can use gate as construction entrance and exit. Residents who park in the north and east lots will use a gate being opened on Columbus. Residents who park in the west lot will use a gate being opened on Montgomery. A pedestrian gate on Montgomery will be installed to provide access to the south. Resident Access

Residents who park in areas affected by the second phase of the cleanup will be offered temporary parking passes at the 66 Columbus Drive garage. Residents affected by the parking restrictions should attend one of three meetings to obtain their pass: Saturday, Sept. 14, 9 a.m. to 1 p.m. Tuesday, Sept. 17, 6:30 to 8:30 p.m. Thursday, Sept. 19, 6:30 to 8:30 p.m. All cars in affected area must move offsite by Saturday, Sept. 21. Look for a flier with more information. Temporary Parking

Phase 3 to Completion PHASE 3 PHASE 2 PHASE 1 PSE&G ELECTRICAL LINES  Phase 3 follows immediately after Phase 2  Health and safety measures continue  Before Phase 3 can begin electrical lines in the path of excavation owned by PSE&G must be deactivated and rerouted  Average depth of excavation will 8 to 10 feet.

New Route for Electrical Lines PSE&G ELECTRICAL LINES  New lines will be installed in easement on north side of property  New lines will bypass excavation and connect with existing lines on north side of Building Nos. 1 and 2  New lines will be installed and switched on before Phase 3 begins next March

A meeting to brief residents on what to expect will be conducted before the third phase begins Work is expected to begin immediately after the second phase is finished, which is scheduled for next March Cleanup work and restoration of the property are expected to be complete by next September Meeting Before Phase 3

Workers for PPG discovered a small patch of hexavalent chromium on a support column in the boiler room as part of a post-Hurricane Sandy inspection A protective seal was immediately placed over the area preventing any exposure to workers and residents Since then, PPG has conducted an investigation and taken samples throughout the basement Delineation of the column is complete and the protective seal will continue to cover the affected area Final boiler room remedial action plan will be shared with residents Basement of Building No. 2

Questions and Answers

Site Administrator Telephone: Mail: P.O. Box 15981, Jersey City, N.J PPG Industries: Telephone: Mail:P.O. Box 15756, Jersey City, N.J Office: 90 Forrest St., Tuesdays and Thursdays, 10 a.m. to 2 p.m. and by appointment NJDEP Telephone: Contact Us