Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014

Slides:



Advertisements
Similar presentations
ODOT BULK FUEL MAINTENANCE PLAN WHAT TO EXPECT THE DAY THE VENDOR TAKES A SAMPLE.
Advertisements

Dewatering & Coastal Issues H 2 0 & Erosion Control Workshop UCF Stormwater Management Academy March 15-16, 2007 Jim Smoot, PhD, PE Molly Wood, PE U.S.
Valley City State University | Facilities Services
CLOW WATER Contractor Orientation April
Treatment of Slaughterhouse Wastewater
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
1 Joint Commission for Environmental Cooperation and U.S./Mexico Border 2012 Collection and Storage of SLABs December 4, 2007.
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
Lake Whetstone Sediment Removal by Hydraulic Dredging
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Surface Water Treatment Plant
Safety & Security Contractor Induction Property Management.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Construction Training
By Williston Fire Department. Importance Of Fire Safety Fire kills more Americans than all natural disasters combined. Annually 4,000 people will lose.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Society depends on clean and safe water.
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Close Out CTC-470.
ESTIMATING By Laith Jacob.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
BMPs & Bucks Preventing PCB Contaminated Used Oil Northwest NAHMMA Conference June 2014.
Introduction to Environmental Engineering Code No. (PE389) Lec. 5 and 6.
Tulane University - Office of Environmental Health & Safety (OEHS) EMERGENCY EYEWASH AND SHOWERS FOR TULANE LABORATORY OR FACILITY EMPLOYEES WITH THE POTENTIAL.
Pesticide and Fertilizer Bulk Storage. Buying in bulk.
Christine Krall, SW Region Environmental Winter 2015.
Storm Water Pollution Prevention Training
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Water Treatment Processes. Why do we need to treat our drinking water?  Industrial runoff  Agricultural runoff  Road runoff  Residential runoff.
Trindel Insurance Fund
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Dredges & Barges. Dredges  Used in different mining applications  Sand & gravel are most commonly dredged materials  Other minerals also mined with.
CASE STUDY EXAMPLE Work Process Flow Charts. WORK IDENTIFICATION / WORK ORDER PROCESSING Review Notification Asset Coordinator Notification complete and.
Water Use and Management Chapter 11, Section 2. Global Water Use Three types of major uses of water –1. Residential use –2. Industrial use –3. Agricultural.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Head works.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Water treatment at the Avenue. The Avenue Coke Works Processed coal to produce coke Coke used as a smokeless fuel and in the steel-making industry Wastes.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
WHAT IS RAFS? Organized in 2004 to Assist Rural Alaskan Communities Manage Their Bulk Fuel Facilities. Not-for-Profit Corporation. Initial funding provided.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
COMMON PROBLEMS WHEN REVIEWING WATER WELL PLUGGING RECORDS.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
Assignment You need to draw and label each step of the water treatment process Under each label explain what is happening in that step.
1 There are two types of potential discharges that require permits at our marina facilities: 1) Stormwater and 2) Wastewater. Your facility needs to be.
How do we harvest rainwater and why should we.. Why Harvest Rainwater? Decrease the volume of potable water used for irrigation. Recharge the groundwater.
Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
Nassau County Disaster Debris Management Plan Debris Planning Team Meeting 1, April 24.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Safe, Clean and Drinkable
CONTENTS 1. Intakes for Collecting Surface Water Page no. (1) (3) (5)
Westbrook Contractor Safety Training April 5, 2018
Private Septic Systems
Safety is part of our culture at Halliburton
Private Septic Systems
Hanmer Springs Water Supply
Treatment – Sediment Filters
Illinois Waterway 2020 Consolidated Closure
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
Vehicle & Equipment Maintenance/Cleaning
Presentation transcript:

Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014 Ross Dam Pre-Bid Project Overview May 2014 Project Location This presentation is for general info. Consult the RFP for details. Skagit River

City Light Admin Offices Diablo Boat house Ross Dam City Light Admin Offices

Getting to the work site Diablo Boathouse Diablo dam Highway 20 To Ross dam Diablo Dam and boat house

Project Location: Ross Hollow Jet Valve House Dam Valve house Hollow Jet Valves Opening to Tunnel Diablo Lake / Skagit River

Problem Past O&M work (sandblasting) left lead in the sediment in the tunnel. Can’t pump tunnel dry without discharging lead into Diablo Lake Goal Remove lead to allow future O&M work to pump tunnel dry when needed for inspections and repairs

Plan view By-pass intake structure Ross Lake Diablo Lake Tunnel and two By-pass penstocks Hollow Jet Valves & Valve House

Bypass Penstock Tunnel Diablo Lake Ross Dam Valve house Typical water Level (1205) 9 8 6 4 3 2 1 7 5 10 Concrete Tunnel plug Hollow Jet Valves By-pass penstock Tunnel Sump Pipe saddles

Cross Section of Pipe Supports Penstocks Concrete wall Tunnel Doorway Not to scale

Inside Valve House Tunnel & By-pass penstocks

Scope of work Install temporary weir (vendor) or permanent weir (SCL) Install rock fall fence (vendor) Remove and treat 1,000,000 gallons of water from tunnel to remove suspended lead (vendor) Remove 10 – 30 cy sediment (vendor) Verify & Dispose sediment – could be dangerous waste (SCL)

1. Opening to tunnel Lake level can fluctuate 4-5 feet daily. ~8-ft Higher lake level (elev 1205) ~5-ft Lower lake level (elev 1199) Lake level can fluctuate 4-5 feet daily. The lake may have waves.

1. Install weir Weir Isolate tunnel from fluctuating lake levels Protect workers Keep debris out of tunnel Contractor can use SCL weir or build their own temporary weir Proposed SCL metal weir (install in June or October depending on Contractor’s preference)

2. Rock fall Protection (vendor) Temporary fence

3A. Mobilize Valve House Spill way Temp rock fence SCL Barge Ross Dam

Vendor Submittals (pre-mobilization) Health & Safety Plan Hazardous waste handling plan Work plan Contact info Water Tectonics Electro-coagulation operation manual Schedule Spill control plan Barge loading & operation plan * Temporary weir * Rock fall fence Equipment and materials * Need engineer stamp

Vendor Mobilization Load water treatment equipment on barge Provide generator, pumps, worker shack, sani-can, ladders, lights, etc. * Some size restrictions: tunnels, barge load, barge access, etc.

3B. De-water Tunnel Pump out clean water & direct discharge to lake Pump out dirty* water and treat prior to discharge Approximately 750,000 – 1,000,000 gallons Water is ~12 – 16-ft deep *Dirty = > 5 NTU turbidity

3C. Water Treatment on Barge Discharge to Diablo Lake pump Tunnel shack Sand filter Back flush tank Settling tank #2 Settling tank #1 Source tank Electro coagulation Sani can generator 80T Barge Not to scale Water Tectonics is the MANDATORY SUB-CONTRACTOR Must use Electro-Coagulation Treatment System

4. Remove Sediment Workers enter all ten chambers Remove sediment (dredge? Pressure wash? Sweep?) Dirty water and sediment pass through treatment Sediment collects in tanks

5A. Verification Clean water is discharged Batch testing 1 – 3 times Weekly water discharge samples Sub-contractor operations Chambers are clean and lead free Visual inspection Water samples

5B. Waste disposal Vendor will: SCL will: Unload tanks from barge Transfer sediment to waste containers Dispose of other debris (trash, sani-can, misc. debris) SCL will: Test for dangerous waste Haul lead-contaminated sediment and sand filter media to proper disposal site

Misc. Vendor tasks Collect samples & deliver to lab Provide crew boat to shuttle staff Provide lodging for crews Reporting to SCL and Ecology Site cleanup (non-hazardous materials) Demobilization

Vendor Selection

Mandatory Pre-bid meeting At SKAGIT – meet at Newhalem General Store RSVP Bring Hard Hat & Lock Out Tag Out locks Read and be ready to sign SCL LOTO policy If you don’t bring LOTO locks, you will be left behind at the General Store.

Vendor selection Requirements Pre-qualifications Worked off barge Attend mandatory pre-bid Skagit site visit - Will use Water Tectonics as sub - Can obtain insurance in a timely manner Pre-qualifications Worked off barge Removed underwater sediment Handled contaminated material

Vendor selection (cont.) 50% price 50% approach – submit 4 page document Work plan Safety Environment Experience FYI: Prevailing wages apply

Tunnel Cleanup Schedule Feb Mar Apr May Jun Jul Aug Sep Oct Permits Procure-ment Submittal Tunnel Cleanup

Payment Pay Activity 5% Submittals and Mobilization 10% 20% 25% 40% Activity Submittals and Mobilization Water Treatment System running 5 chambers clean All chambers clean Finish, cleanup, demob Stand by Incentive for finishing early: $1,000/day