Tips Menyederhanakan Diagram Blok Ir. Abdul Wahid Surhim, MT.

Slides:



Advertisements
Similar presentations
Feedback loop (CV changes input) SP Controller Gc Plant Gp Sensor Gs E MV (Manipulated Variable CV Controlled Variable +-+- S.
Advertisements

Changeable Apartment and Foldable Car Marita Putri /
Pengantar Teknik Kimia Sesi 1: Peralatan Proses
EL 3014 Sistem Mikroprosesor
Evaporasi / transpirasi - Air yang ada di laut, di daratan, di sungai, di tanaman, dsb. kemudian akan menguap ke angkasa (atmosfer) dan kemudian akan.
X> ENZIM Amudiono. SK/KD INDIKATOR MATERI X>< Dhani 2009 STANDAR KOMPETENSI Memahami pentingnya proses metabolisme pada organisme. KOMPETENSI DASAR Mendeskripsikan.
Perencanaan & Manajemen Strategis. Perencanaan Adalah suatu jenis pembuatan keputusan yang spesifik yang dikehendaki oleh manajer bagi organisasi mereka.
HTML Pertemuan ke 3. Mengatur Daftar Item Tag hampir sama fungsinya dengan preformat
HUB. MOMEN M DAN SDT ROTASI
EDU 3108 ASAS KEPIMPINAN DAN PERKEMBANGDAN PROFESIONAL GURU
BEBERAPA AKIBAT HUKUM I TERMO
SRI SULASMIYATI, S.SOS, M.AP
1 Data Flow Diagram (DFD) 2. 2 Yang harus dihindari.
Analisa Numerik Sistem Persamaan Non-Linear 1. 2 Pendahuluan Diberikan f(x) = 0, terdefinisi pada suatu interval [a, b]. Cari x* sedemikian shg. f(x*)
PANDUAN MENGENAI MANUAL PROSEDUR KERJA (MPK) & FAIL MEJA (FM)
Sebaran Peluang Bersama
MATERI : PROGRAM LINIER
PERANAN PANITIA   2 Unit Akademik PPDTL P.Pinang.
RANCANG BANGUN SISTEM INFORMASI PEMBERIAN REWARDPUNISHMENT KARYAWAN NAMA : ARIF FEBRIYANTO NIM :
PENGANTAR GIZI. ZAT GIZI  Adalah zat yang berbentuk ikatan kimia yang diperlukan tubuh untuk melakukan fungsinya yaitu menghasilkan energi,membangun,memelihara.
Pembuatan Website Bimbingan Belajar Sony Education College (SEC) Aditya Widyanto for further detail, please visit
FUNGSI PEMBANGKIT MOMEN PEUBAH ACAK KONTINU KHUSUS
Perencanaan & Manajemen Strategis
Proses Stokastik Semester Ganjil 2013/2014
Module 15: Process Control and Process Integration – Tier I
Manajemen Umum PERTEMUAN 5 Perencanaan Operasional dan Strategis.
Rangkaian Sequensial RS Flip – Flop JK Flip – Flop T Flip – Flop
Otomatisasi Electronics (control) system (ee-29) oleh A. Tossin Alamsyah OBJEKTIF : Mengenal berbagai sistem kontrol elektronik dlm,di industri dan mampu.
Matakuliah : Kalkulus-1
REKAYASA FONDASI I PERTEMUAN III TEKANAN TANAH LATERAL PADA DPT Oleh :
SISTEM BILANGAN HEXA & BCD Oleh : Riza Alfita, S.T., M.T KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN 2011.
Robot Cerdas Pemadam Api Team “Ghotic-s” Akeda Bagus J.S Yogi Permady Susan Jurusan Sistem Komputer Universitas Gunadarma Laporan Kemajuan KRCI 2007.
Analisis Rangkaian Sekuensi Perancangan Rangkaian Sekuensi
IIV and CV Measurements of rd50-(2551-6, , ) Sadia Khalil VELO Group Meeting.
1 Pertemuan 23 Managing The Effectiveness of The Audit Department Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
CV Pathology Lab 3 CASE 1. CV Lab 3, Image IA CV Lab 3, Image 1B.
1 Pertemuan 24 Managing The Effectiveness of The Audit Department Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
1 04/03/02 01:30 utc IR. 2 04/03/02 02:00 utc IR.
Unit 2 Present Progressive and Simple Present. Unit 2 Present Progressive and Simple Present 2 Present Progressive.
Scheduling randomly-deployed heterogeneous video sensor nodes for reduced intrusion detection time Prof. Congduc Pham Université.
Supply and Demand in Action The Motion of a “Free Market”
How many grams of sodium sulfate would you need to make 100. mL of a 3.5 M solution?
Arosuka Group is a development companies with an iron ore mining project located in Solok - Padang, West Sumatera, Indonesia. The property is also surrounded.
I5 V in V out If V in is 1 V what is V out ? A)0V B)1 V C)-1 V D)~15 V E)~ -15 V +15 V -15 V.
KOMPONEN SISTEM TEMU-BALIK INFORMASI
PUNGSI KEANGGOTAAN.
Workshop for Flipped Class
Control Loop.
Drying & Curing Condition
LOOPING DAN FUNCTION Pertemuan 5.
Fungsi dan Penggunaanya
KONFIGURASI SISTEM KOMPUTER
Magister Sistem Informasi A Presentation by
DOD 2012 Budget Aircraft Procurement
PUSAT PENJAMINAN MUTU UNIVERSITAS NEGERI JAKARTA.
6-3: Square Root Inequalities
لبی.
POLITEKNIK KOTA KINABALU
A.ERROR Kesalahan adalah perbedaan antara variabel yang diukur dan setpoint. Kesalahan dapat berupa positif atau negatif. Tujuan dari setiap skema kontrol.
Unit 8: Concentration and Molarity (M)
CBE 491 (CBE 433) Review II: Fall 2012.
Как да кандидатстваме по НИФ
-·.-...-· A. -.. ) ,.,.. -.,., · o# --·'1>,.. ·-·-. ·-· ;'/' : ,.,. - ' p ·-·- ·-- 'II"; -.-. t-.. p
Movement Defense Movement Defense Movement Defense Movement Defense
So…Where Are We On The Graph. Michael J Placzek, P. E
WEB 2.0 and E-LEARNING & MOBILE LEARNING
Proving Angle Pair Relationships
H(s) Transfer Function: f(t): input x(t): response f(t) fz(t)
Concept 0 - Capacitance C = q V C = capacitance (Farads)
Exercise 1.1 For the level control system, if the following relations are satisfied: where A represents the sectional area of the tank, KV2 and fV represent.
Presentation transcript:

Tips Menyederhanakan Diagram Blok Ir. Abdul Wahid Surhim, MT.

Sistem Pengendalian 2 CSTR T

Mengubah kedalam Diagram Blok Diagram Blok Umum (Set-point) GCGC CV(s) CV m (s) SP(s) E(s) MV(s) + - GvGv GpGp GsGs

Mengubah kedalam Diagram Blok Diagram Blok Umum (Set-point) Pengendali: Proportional  G c = K c Control Valve: Proses: Sensor: G s = 1 GCGC CV(s) CV m (s) SP(s) E(s) MV(s) + - GvGv GpGp GsGs

Memasukkan Fungsi Alih kedalam Diagram Blok Diagram Blok Set-Point KCKC 1 CV(s) CV m (s) SP(s) E(s) MV(s) + -

Fungsi Alih KCKC 1 CV(s) CV m (s) SP(s) E(s) MV(s) + -