ICR 56 Guidance Document (v2.0) & Other Changes for 2008.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Barhale Procedure for Site Establishment
October Module 5: Cleaning Activities and Checking Your Work Overview Interior cleaning techniques. Exterior cleaning techniques. How to check.
Asbestos Methods & Materials. Over View What is Asbestos? Common Sources Why look for it? What to look for? Community Concerns Regulations Equipment How.
Background Presenters Work done in preparation for WHS changes
Ann Arbor Housing Commission Tenant Asbestos Awareness Presentation Kary S. Amin Nova Environmental, Inc.
Presented By: Kary S. Amin Nova Environmental, Inc.
2011 Proposed ICR 56 Revisions Relating to Fire/Life Safety &
Introduction Explain some of the major changes in the revision to ICR 56 Correlate revisions to federal regulations (EPA & OSHA) Christopher Alonge, PE.
REGULATORY OVERVIEW.
ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety Presented by the Office of Environmental Health and Safety.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
SETUP Chapter 6 Lead Abatement for Workers Course.
2014 Asbestos Symposium Enforcement overview
Subpart T Demolition These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance.
These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes only. You should.
11. As part of its mission to protect human health and the environment, EPA works with various partners, including schools, to share information, resources.
Wisconsin Department of Health Services Asbestos & Lead Section Or Google key words: WI Asbestos NEW Asbestos Rule, DHS.
1 ASBESTOS AWARENESS East Carolina University ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Laschone P. Garrison State of Connecticut, Department of Public Health.
UKATA EMERGENCY PROCEDURES These slides are designed to assist UKATA members in the delivery of Category A – Asbestos Awareness Training when dealing with.
Control of Hazardous Energy – Lockout/Tagout 29 CFR
130 Liberty Street Deconstruction Project Public Information Open House Revised Deconstruction Plan and Process June 20, 2005.
Subchapter III: Company Certification Requirements.
HAZWOPER Overview.
BUILD WITH US. ™ Contractors
Asbestos Exposure Presentation Presented by: Todd & Cue Ltd © 2006, 2012 Zywave, Inc. All rights reserved.
W504 - Management of asbestos containing materials.
New York State Department of Labor Division of Safety and Health Eileen Franko, DrPH Acting Director.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 Asbestos NESHAP Inspection and Safety Procedures Course Chapter 1 Background Information Version
Georgia Department of Community Affairs Housing R R & P Issues Lead-Based Paint & (Asbestos) Compliance Georgia Environmental Protection Division Lead-Based.
Incident Reporting Procedure
Louisiana Department of Environmental Quality Jodi G. Miller, CHMM, CPM May 9, 2007 New Orleans/Gulf Coast Challenges and Outcomes.
A Two Hour Introductory Course Rowan University Environmental Health and Safety X 5105
2009 ICR 56 Rulemaking & Guidance Document (v2.0).
October Module 2: Regulations U.S. Environmental Protection Agency (EPA): Established accredited training and certification programs for workers,
Module 7: Construction Phase
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
0 October 2010 Occupational Health Department Asbestos Awareness (OEMP005) Occupational Health Department NOTE: Detailed speakers notes included to support.
ESA Program Lead and Asbestos Safety Practices Presentation to the Low Income Oversight Board February 26, 2014 San Francisco, CA.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
Asbestos. © Business & Legal Reports, Inc What Is Asbestos? Group of natural minerals Still mined in some countries Long, thin, and strong fibrous.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Asbestos Renovations and Demolitions in South Carolina Lynn Barnes, Manager Asbestos Section SC Dept. of Health & Env. Control Phone: (803)
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Corporate Asbestos Review Anthony Peltier 11/2012.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Writing Plans. Assessment performed by an Assessment Consultant, who produces a… Remediation Plan, that is provided to the client before the remediation.
Mold Remediation & Remediation Contractors 2011 National Tribal Forum on Air Quality Institute for Tribal Environmental Professionals (ITEP) & National.
 Section (2), Florida Statutes, requires each local government to maintain a comprehensive plan of the type and in the manner set out in this.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
OSHA A GUIDE TO THE NEGATIVE EXPOSURE ASSESSMENT.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Asbestos and Health. Overview n n Background on asbestos n n Uses of asbestos n n Health Effects n n Risk factors n n Medical tests n n Proper handling.
1 Second Layer of Poly At this point all poly EXCEPT critical barriers can be removed. Some specs require leaving the last layer of poly up until final.
Mold Awareness Training
Incident Reporting And Investigation Program
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Incident Reporting And Investigation Program
New York City Department of Environmental Protection
Asbestos: Identification and Training
Presentation transcript:

ICR 56 Guidance Document (v2.0) & Other Changes for 2008

Introduction Review Variance time limits, Current AVs, Anticipated AVs for 2008 & New Variance Petition Form SH752 Fire & Life Safety Issues to be added to ICR 56 next revision Explain the major revisions in the 2008 guidance document (v2.0)  Christopher Alonge, PE NYS DOL DOSH ESU Associate Safety & Health Engineer

Variance Decision Time Limits  Site-specific variances issued valid for one year (except K-12 schools – 2 years)  Multi-location variances issued (FWV, STWV, SWV) valid for 2 years  AV no specified time limit  BV issued for 3 years

Current Applicable Variances AV-A-1 Requirements for controlled demolition asbestos projects at municipally owned vacant residential buildings/structures AV-A-2 Requirements for extension of negative air exhaust tube greater than 25 foot in length AV-A-3 Non-friable ACM Floor Covering Mastic Removal Using Chemical Methods along with Low- speed Floor Buffers AV-A-4 Removal or Cleanup of Intact Minor Size Non- friable ACM Floor Tile

AV-A-1 AV-A-1 Requirements for controlled demolition asbestos projects at municipally owned vacant residential buildings/structures  For structurally unsound buildings, shall be followed.  For buildings not unsound, as per EPA NESHAP, an asbestos survey must be completed, and all friable ACM must be removed prior to demolition, as well as all non- friable ACM that will likely become friable during demolition.  Only non-friable ACM remains during controlled demolition.  All waste generated is still considered asbestos- contaminated, but as only non-friable ACM remains, disposal by appropriate legal means  Structural members, steel components and similar non- suspect items must be fully decontaminated as per ICR 56 prior to being treated as salvage

AV-A-2 AV-A-2 Requirements for extension of negative air exhaust tube greater than 25 foot in length  For up to 100 ft. in length, prescriptive procedures for modification of tube to maintain flow (increase diameter, no obstructions, smooth bore, etc.) For over 100 ft. in length, engineering analysis performed by PE required to verify that the additional duct will not reduce the machine’s airflow below the acceptable value.  Booster Exhaust Fan Units – For any length exhaust tube, an unfiltered booster fan of equal flow capacity shall be installed per 25 foot of downstream exhaust ducting from the ventilation unit. Each booster fan shall shut down automatically if airflow from the upstream filtered ventilation unit is lost

AV-A-3 AV-A-3 Non-friable ACM Floor Covering Mastic Removal Using Chemical Methods along with Low- speed Floor Buffers  One-layer splashguard at bottom of walls  Hardwall Isolation Barriers not required at barrier locations only accessible to certified personnel  Low-speed Floor Buffer(<300RPM), with low abrasion pads  Remote p.decon allowed for work areas with HEPA-exhausted floor buffers, but no debris or residue allowed on waste bags/containers, decon floors or designated pathway floor surfaces  Attached Personal Decontamination Enclosure if Buffer not HEPA exhausted

AV-A-4 AV-A-4 Removal or Cleanup of Intact Minor Size Non- friable ACM Floor Tile.  O&M Minor size project allowed to be completed within regulated area instead of a negative pressure tent enclosure.  Floor tile must remain intact or substantially intact during removal and/or cleanup.  Drilling, sawcutting, use of chemical solvents, or use of any other method that may render the ACM friable or no longer substantially intact is prohibited.  Minimal breakage of ACM flooring is allowed, but the ACM matrix must remain substantially intact.  No Project Air Monitoring Required.

AVs – anticipated 2008 release Mechanical fastening of Items/Components or Systems – Penetrating Through Non-friable ACM – Not Considered and Asbestos Project Small & Minor Size Asbestos Disturbance Cleanup Projects – to be used for cleanup of all type asbestos disturbances

Anticipated AV Mechanical fastening of Items/Components or Systems – Penetrating Through Non-friable ACM – Not Considered and Asbestos Project  Drilling Prohibited  ACM not to be used as structural support  OSHA asbestos awareness training required  No generation of debris allowed during fastening operations  Cat. I NF ACM - Sealant/caulking applied to ACM surface at point of intended impact, system overlayment/attachment allowed  Cat. II NF ACM – Self-adhesive asphalt based ice & water shield to be installed to ACM surface at framing/support system point of intended fastener impact. System overlayment/attachment not allowed to be directly fastened to ACM

Anticipated AV Small & Minor Size Asbestos Disturbance Cleanup Projects – to be used for cleanup of all type asbestos disturbances  Exterior Non-friable Asbestos Cleanup Projects Restricted area with minimum buffer zone requirements Remote Personal Decon allowed – if manual wet methods to be used Negative Air Containment Enclosure not required Daily Abatement and Clearance Air Sampling required  Interior Non-friable Asbestos Cleanup Projects Restricted area required Remote Personal Decon allowed - if manual wet methods to be used Negative Air Containment Enclosure required Daily Abatement and Clearance Air Sampling required  Interior and Exterior Friable Asbestos Cleanup Projects Restricted area required Attached Personal Decon required Negative Air Containment Enclosure required Daily Abatement and Clearance Air Sampling required

New Variance Petition Form SH-752 SH-752 Form Approved 2/08  Effective Immediately – However exclusive use not required until May 1, 2008  Located On DOSH Website by March 7, 2008  Copies available today  Clarified Requirements  Petitioner, petitioner’s agent, and designer information  Explanation necessary if petition related to safety & health emergency  Completion of work area description table per work area and work procedure  Requires more comprehensive and detailed approach to submissions

Fire & Life Safety Issues - to be added within ICR56 Adequate Fire Egress from all work areas to be installed, marked inside and out, and shall be maintained throughout the asbestos project, as per OSHA, NYS building and fire code requirements, and any local regulations Maintain existing fire protection systems throughout asbestos project as per NYS building and fire code requirements, and any local regulations If building occupied, no alterations allowed to existing exits, exit discharges, or exit signage and illumination If variation from NYS Building and Fire Code or local regulations is required for fire/life safety issues, all appropriate permits must be obtained using licensed design professionals as required by pertinent agency Negative Air Ventilation Disconnect Switch for multi- floor or entire floor asbestos projects Possible revision to allowed materials for sheathing requirements. Fire-retardant sheathing required for barriers and decon construction on large projects

ICR 56 Guidance Document (v2.0) Development  The Code Rule can not address every situation. DOL has developed the guidance document to supplement the regulation and to assist stakeholders in implementing the regulation  The most recent revision of the guidance document is based upon current interpretations/clarifications and responses to pertinent questions received  Located on DOL website  Dynamic in nature - first revision to be released in March, new questions/answers added

MAJOR ISSUES INCLUDED WITHIN 1ST REVISION OF GUIDANCE DOCUMENT

Cleanup of Uncontrolled ACM Disturbance Q: Who is responsible? A: Upon discovery of uncontrolled disturbance, the Owner must contract with licensed asbestos contractor for immediate isolation and cleanup of disturbed ACM The Owner shall vacate and generally isolate (cordon off and turn off impacted HVAC systems) the room/area/space from remainder of building/structure, until Asbestos Contractor arrives on site for completion of isolation procedures and immediate clean up of disturbance.

Asbestos Cleanup Project Preliminary Requirements For all cleanup scenarios the following applies: Once a disturbance (debris) is discovered, it must be cleaned up as soon as possible. For all disturbances, the room/space/area must be vacated and isolated immediately, and an asbestos contractor must be hired for appropriate cleanup of affected room/area/space. A site-specific variance is necessary for cleanup of any disturbance other then a Minor size incidental disturbance. For all asbestos cleanup projects, quantification is based on the affected square footage of the surfaces to be cleaned up, not the quantity of ACM prior to disturbance. Once the affected room/space/area has been vacated and isolated, the extent of contamination shall be determined by a certified inspector (working with a project designer if a variance is anticipated), using air sampling technicians and additional inspectors as necessary. These certified individuals shall use visual debris/contamination identification and assessment, static (ambient) air sampling of the potentially contaminated area, and adequate bulk sampling/analysis of the remaining debris/residue to define the limits of the contamination that must be cleaned up.

Asbestos Cleanup Project Preliminary Requirements (cont.) For all minor size cleanups [see 2.1(b)(p) definition] emergency notification as per and must occur [phone call to local ACB district to notify the supervisor of the pertinent details regarding the minor size asbestos project cleanup], prior to proceeding with the cleanup as per (f). In addition, any cleanup scenario over a minor size (10 sq. ft. of affected surfaces to be cleaned), requires submission of a site-specific variance petition. For cleanups that require submission of a site-specific variance petition, the project designer shall include within the variance petition, a plan for cleanup (along with any necessary removals or repair of damaged materials) that will take into account accessibility, air movement, exposure potential and other pertinent conditions that may affect the proposed procedures. If the project designer requests delay of scheduling the necessary cleanup projects, appropriate supporting information must be provided and necessary precautions must be included for maintaining isolation of the affected area until cleanup is scheduled and completed. The Department will review the plan, assessment of exposure potential and proposed procedures, prior to granting a variance decision that will not adversely affect the building occupants or the general public.

Overlayment of ACM Roofing/Flooring Q: Is overlayment of ACM floor tile with mastic and carpet, and/or covering with floor leveler an asbestos project? A: Overlayment of a floor, wall, ceiling or roofing system over an intact non-friable ACM using an adhesive or leveling compound is not considered an asbestos project unless the ACM is disturbed during the overlayment procedure.  Any penetrations to the ACM or impact to the intact ACM matrix would be considered a disturbance.  Note: non-asbestos contractor performing overlayment must be informed of the presence and location of the ACM, and that disturbance is prohibited. All on-site contractor personnel must have current OSHA asbestos awareness training.

Project Record Q: How long is the owner required to retain the Project Record for? A:  As the waste ownership is "cradle to grave", the owner/waste generator should retain records relating to the waste disposal forever.  Regarding the asbestos survey information, any ACM remaining at the property must be labeled/identified as per OSHA, and any future construction projects at the premises, would use the survey information as a starting point for planning the next project.  However, there is no specific building owner record retention time period identified within ICR 56.  The owner must comply with federal regulation record retention requirements at a minimum, but from a common sense perspective the owner should keep all asbestos project records until the building is sold, then the owner would turn over the records to the new owner.  Electronic storage of documents is allowed by owner and other asbestos contractors on project. Certification of completeness and accuracy of the information contained in the electronic records must be maintained and provided consistent with federal requirements.

Bulk Samples – Minimum # Required Q: For miscellaneous materials, the EPA states that bulk sampling should be performed as follows:  Miscellaneous material & Non-friable suspected ACBM. In a manner sufficient to determine whether material is ACM or not ACM, an accredited inspector shall collect bulk samples from each homogeneous area… Does this mean for miscellaneous and non-friable ACBM, a minimum of two samples per homogeneous area must be collected and analyzed to verify the material is negative? A: Yes, you are correct. As provided by EPA, “EPA agrees that the regulations cited (AHERA c&d) use the plural word "samples" and, therefore, two samples are the minimum number of samples for miscellaneous material and nonfriable suspected ACBM.” Thus, if a minimum of two bulk samples have not been collected and analyzed, then the homogenous area is still assumed to be ACM until the appropriate number of bulk samples have been collected and analyzed. Only with an adequate number of negative bulk sample analyses, can the ACM assumption be rebutted as per OSHA, and EPA requirements.

Asbestos Survey Requirements Q: When performing an inspection in areas that have a drop ceiling which is not itself ACM, with known friable ACM and/or PACM above, can these tiles be removed to perform sampling of PACM and/or determine the quantities and condition of ACM and PACM? Section 7.11 (f) (4) does not allow for a drop ceiling to be removed unless the area is contained and under negative pressure, however this section deals only with work area preparation. Does this also pertain to the inspection process as well? A: Regarding inspection/survey of interstitial ceiling spaces, appropriate PPE should be worn, and if debris is discovered above a suspended ceiling, the inspector must notify the owner of the debris and required cleanup. The inspector should immediately exit the contaminated space, as no engineering controls have been installed and any further access to the contaminated space may potentially spread the contamination. Once the necessary debris clean up complete, a certified inspector may complete the remainder of the required inspection.

Conflict of Interest Q: Can a company that is a licensed asbestos handler (restricted) hire an abatement contractor for a project on behalf of a client, and also conduct the air sampling and/or project monitoring for that project? A: If a consulting firm (as a representative of the building owner) contracts the abatement contractor to complete the asbestos project, that consultant can not perform the area air sampling or the project monitoring for the asbestos project. [see (a), (d)(1) & (e)(1)]. Q: Can a licensed asbestos contractor perform an asbestos survey for a project and also do the abatement? A: The conflict of interest arises with Oversight of the Phase II abatement work. The asbestos abatement contractor could perform the Phase I asbestos survey, or the project monitoring firm, or the air monitoring firm, or the project design firm. It doesn’t matter which asbestos contractor performs the survey, it is not considered a conflict as it is completed prior to Phase II.

Shutdown of a Bank of Negative Air Units Due to Elevated Sample Q: What happens if negative air exhaust tubes are banked together and an exhaust air sample result is found to be elevated? A: If an elevated exhaust air sample result is obtained, each unit within the bank of units must be shutdown one at a time, the unit and filters inspected, repaired/changed out as necessary, and then the unit put back into service. Then the next unit in the bank is shutdown, inspected, and so on until all units have been addressed. Each of the affected negative air units must be sampled independently for at least one day to ascertain if problems still exist. Upon receipt of additional elevated air sample results, the affected unit(s) must be taken out of service and removed from the work area for appropriate repair.

Splitting Work Areas Q: Can a contractor set up a portion of a full building abatement/demolition project with multiple minor tent enclosures, and avoid air monitoring and project monitoring on the tent enclosures? A: Yes, a contractor may split up a regulated work area into multiple regulated abatement work areas.  The air monitoring requirements are work area size dependent (minor, small or large), except clearance air monitoring, which would be required for all work areas including each minor work area that is part of small or large project [see ICR (d)(4)].  The project monitor visual inspection is required for small and large size work areas [see (d) & (e)(8)].

PPE Selection Q: If a contractor has a Negative Exposure Assessment pursuant to (f)(2)(iii), during Work Area preparation, it is my understanding that there is no (asbestos specific) PPE and/or respiratory equipment necessary in the area until either  1.) the exposure assessment changes, or  2.) if the contractor begins Class I removal,  3.) or if the employee chooses to wear it. A: Our intent was for PPE to be provided and utilized for friable asbestos projects (class I and II) during preparation, as these projects typically have higher potential for friable ACM to be disturbed during preparation activities.  The Department understands that you could have a class II friable ACM asbestos project where a negative exposure assessment has been generated and reduced PPE (as allowed by OSHA) shall be used during the abatement. For these asbestos projects, as per , the PPE selected for the removal is the same PPE required during the preparation activities.  For Class I projects, as per , the same OSHA Class I required PPE to be used during abatement shall be used during the work area preparation activities.  However, for projects that utilize an exposure assessment for selection of PPE, the exposure assessment must be on-site and made available to any NYS DOL inspector that visits the site.

Waste Clean-up in Work Area Q: May I temporarily store single bagged ACM in the work area until removal is complete? A: At no time can the single-bagged waste that is temporarily stored in the regulated abatement work area impede entry/exit to or from the work area.  For example, a room within the work area (not part of the egress route from the work area) may be designated as a temporary storage area for single-bagged waste, until a waste bagout can be scheduled, but a hallway that is part of the egress route in the work area, could not be used for temporary storage of waste bags as the work area egress route would be impeded. Obviously, all waste bags/containers must be removed from the work area prior to commencement of the project monitor visual inspection required as per ICR 56-9.

Trailers & Dumpsters Q: Please provide guidance on what is necessary for rolloffs used for RACM not only in bags but wrapped odd shapes as well. Is it the abatement contractors responsibility to have lockable hard top while the rolloff is at the project site ? Poly and plywood ok for that? A: The intent of this Section is to indicate that while used for temporary storage of RACM waste on-site, each trailer/dumpster must be secure (with hardtop), located in a secure on-site restricted area, and no visible emissions (air or water) are allowed to occur during the transfer of waste bags/containers, or while temporarily stored on-site.  For situations where open top trailers/dumpsters may have to be used for transport of RACM waste (e.g. wrapped large components),  the open-top trailer/dumpster is to be located in a secure restricted area for the transfer of wrapped RACM waste and temporary storage on-site.  Once utilized for temporary storage of waste on-site, the trailer/dumpster must be secured with a temporary hardtop (e.g. plywood, osb) at the end of the workshift, and the hardtop must remain secure until the start of the next workshift, or until transport from the site.  If the temporary hardtop is not feasible, then an appropriate site-specific variance would be necessary.

Scope of Work for Project Monitor Q: Some contractors believe that a verbal communication of the scope of work is sufficient. Does the scope of work have to be in writing? If so, does the written scope of work have to be written and approved by a certified project designer? A: A verbal scope of work is allowed. The building owner may hire an asbestos contractor for an asbestos project without a written scope of work (e.g. verbal communication that all floor tile and mastic is to be removed as ACM from a specific room).  If the project monitor receives a verbal scope of work, he/she should document the verbal communication. This documentation could be included along with the results of the project monitor visual inspection in the contractor's daily log. It should be noted that if bidding documents were created with a written scope of work, this written scope of work must be provided to the project monitor. If a written scope of work is created for the project, it must be completed by a trained and certified project designer.

Clearance Air Sampling Aggressive Techniques Q: Is the use of aggressive air sampling techniques required for collection of clearance air samples from a regulated abatement work area without a negative pressure enclosure (full containment or tent enclosure)? A: For exterior regulated abatement work areas that are not required to have a negative pressure containment enclosure of some kind, aggressive methods are not be required to be utilized. However, nothing is included in ICR 56 regarding relief from aggressive air sampling procedures for interior asbestos projects completed without a negative pressure enclosure, such as wrap and cut asbestos projects completed as per (b)(4). For these type of asbestos projects, Clearance air sampling is required, but as there is no negative pressure enclosure, the Department agrees that consistent with intent, relief is granted from the aggressive sampling techniques requirement for this situation. This clarification will be included within the next revision to ICR 56

In-Plant Operations Q: Can a ACM NOB flooring mastic be removed using in-plant, by an outside contractor? A: Yes, provided the mastic is removed substantially intact and not rendered friable during removal. Q: Why can’t chemical solvents be used for mastic removal as part of In-Plant Operations? A: Any use of chemical solvent for mastic removal breaks down the matrix of the mastic, disintegrates the integrity of the application, and renders the material no longer substantially intact, and thus can’t be used as a removal method for in-plant operations. The Department intends for all chemical mastic removal operations to be completed within a negative pressure containment enclosure as per the requirements of at a minimum.

Minor Size Project/Work Area Requirements Q: Is continuous negative air with 4 air changes per hour required to be established and maintained until air clearance is received? A: Negative air must be established as per 7.8(a) and maintained throughout the abatement and cleaning process. However as indicated in (e)(7-10), once the final cleaning is complete, 20 minutes have elapsed, the satisfactory visual inspection is complete, and all workers have exited the tent enclosure, the tent shall be sealed and the HEPA vacuum shut down. However, for multiple minor tent enclosures that comprise a small or large project, satisfactory clearance air samples are also required in addition to the satisfactory supervisor visual inspection [see (d)(4)]. In this situation, as the tent enclosure has not yet met clearance criteria (satisfactory visual plus satisfactory clearance air samples), the negative air must be re-established prior to the start of clearance air sampling, as the air sampling technician must enter the tent enclosure for collection of the interior air sample. After the technician has completed collection of the clearance air samples and 20 minutes have elapsed, the tent may be resealed and the HEPA vacuum shut down.

Wrap & Cut Asbestos Projects Q: For a Small or Large project, is it the intent of the Code for clearance samples to be required for each negative pressure enclosure (tent) where insulation is removed to allow for the cuts; multiple Minors as part of a Large or Small project per 56-4 Table 2? Do the tents used for glovebag removals at locations where pipe is cut require clearance sampling prior to cutting and removing the pipe and subsequent clearance of the entire area? A: The individual tent enclosures do not require clearance air samples to be collected, only a visual inspection by a supervisor (for all size work areas) followed by a project monitor visual inspection (for small and large size work areas). After a satisfactory visual inspection, the tent(s) may be broken down. Once all abatement work and cleaning is complete within the work area, then a visual inspection is completed for the entire work area as per ICR 56, prior to commencement of clearance air monitoring as per ICR 56.

Wrap & Cut Asbestos Projects (cont.) Q: As long as the conditions of 11.8(b)(4) exist, regardless of whether the regulated area is interior or exterior, aggressive techniques for clearance sampling are not required, correct? A: Relief is granted in (e) from clearance air sampling for exterior asbestos projects completed without a negative pressure enclosure. However, nothing is included regarding relief from aggressive air sampling procedures for interior wrap and cut asbestos projects completed without a negative pressure enclosure as per (b)(4). Clearance air sampling is required, but as there is no negative pressure enclosure, the Department agrees that consistent with intent, relief should be granted from the aggressive sampling requirement for this situation. This change will be reflected in the next revision to ICR 56.