Unexploded Ordnance (UXO) -- A Major National Environmental Cleanup Requirement Millions of Acres Potentially Contaminated Hundreds of Sites / Locations Diverse Geologic / Environmental Conditions Depths: Surface to ~ 10 m Sizes: 20 mm Projectiles to 2,000 lb Bombs UXO Clean-up is Highest Priority DoD Environmental Restoration Requirement 0.7 m or 2.2 ft 155 mm 60 mm 20 mm Scope of Problem
155mm High Explosive Projectiles Source: ITRC
High Explosive Projectile 8-inch Projectile 3-inch Navy Projectile Source: ITRC
60mm High Explosive Mortar Fuze Casing Fins and propelling charge High explosive charge Bore-riding safety pin missing Source: ITRC
81mm Illumination Mortar Parachute Assembly Source: ITRC
4.2 inch High Explosive and Illumination Mortars Source: ITRC