802.1 Closing Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Liaison stuff n Sanity check n New work…?!!

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PWG Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #2 and #3 of this presentation Advise the WG membership that:
Doc.: IEEE /864r0 Submission November 2003 Clint Chaplin, Symbol TechnologiesSlide 1 SG Operating Rules Anybody can vote, present, and make motions.
802.1 Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Exec stuff n Interim meetings n Task group stuff.
802.1 Closing Plenary - 07/2005 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Motions.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Doc.: IEEE /0051r0 Submission January 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
802.11k Berlin Agendas Richard Paine
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /0661r2 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE b Submission November 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
C /27 May 15, 2006Chair, IEEE Opening May 2006 Plenary Session #20 Jerry Upton- Chair Doug Knisely – Procedural.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /706r1 Submission September 2003 Richard Paine, BoeingSlide k Singapore Agendas Richard Paine
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0051r1 Submission January 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
July 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE / Submission Publicity Committee /.15.
Doc.: IEEE /276r2 Submission March 2004 Richard Paine, BoeingSlide k Orlando Agendas Richard Paine
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE s: ESS Mesh Networking Task Group
802.11k Albuquerque Agendas Richard Paine
802.11k Orlando Agendas Richard Paine
IEEE 802 Handoff ECSG Chair’s Introduction
Submission Title: [WG-TG3b Meeting Report Sept04]
IEEE s: ESS Mesh Networking Task Group
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
IEEE s: ESS Mesh Networking Task Group
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
ADS Study Group Agenda Date: Authors: January 2005
APF Study Group Agenda September 13, 2004 September 2004
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
IEEE s: ESS Mesh Networking Task Group
Siemens, Roke Manor (Recording Secretary )
Sub 1 GHz license-exempt operation Agenda for September 2010
ATML #17 IEEE SCC20 DMC & TII Jan 2006 Plenary
Submission Title: [WG-TG3b Meeting Report September05]
doc.: IEEE /479r0 Mika Kasslin TGh chair
IEEE r: Fast BSS Transition TG Agenda
Submission Title: [WG-TG3b Meeting Report Sept04]
802.11p WAVE Opening and Agenda November p
Submission Title: [WG-TG3b Meeting Report September05]
<month year> <January 2019>
TGi Preliminary Agenda
IEEE ESS Mesh Study Group
IEEE Wireless Coexistence TAG
Stephen McCann (Chair)
Presentation transcript:

802.1 Closing Plenary - 11/2004 Agenda

Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Liaison stuff n Sanity check n New work…?!! n Motions

Administrative stuff - 1 n Officers –Chair: Tony Jeffree –Vice Chair: Paul Congdon –Recording Secretary: Michael Wright –Interworking/Link Sec TG Chair: Mick Seaman –Link Sec TG Secretary: Allyn Romanow –Maintenance of website: John Messenger –Maintenance of exploder: Hal Keen n Website – –Username: p8021 Password: go_wildcats

Administrative stuff - 2 n Voting membership –Current 802 membership rules appear to be SERIOUSLY broken! However, the following is past and current practice: –N.B. terminology: A session is (the whole of) an Interim or Plenary during which meets. A meeting is a subset of a session; I.e., a contiguous time period during the session when the WG meets. Generally meetings are ½ day in duration or less. –To gain membership: Attend 3 qualifying sessions (of which 2 must be plenaries) and inform the Chair of your intention to become a voter –To maintain membership: Attend 2 out of the last 4 qualifying sessions (of which 1 must be a plenary), and respond to 2 out of 3 WG ballots –Attendance is as per signup sheet – must be 75% of meetings during a session in order to count. –Signing the signup sheet for a meeting declares that you have (or will have) attended during the majority of the allotted time for that meeting. Hence, at sessions where more than one WG meets, signing up at two parallel meetings is not valid. n Voting rights are properly regarded as an obligation, not a privilege!

Current voters Brandon Barry Les Bell Paul Bottorff Jim Burns Dirceu Cavendish Paul Congdon Sharam Davari Arjan de Heer Craig Easley Anush Elangovan Hesham Elbakoury David Elie-Dit-Cosaque Norm Finn David Frattura Gerard Goubert Steve Haddock Ran Ish-Shalom Atsushi Iwata Neil Jarvis Tony Jeffree Hal Keen Yongbum Kim Shobhan Lakkapragada Bill Lane Loren Larsen Yannick Le Goff Marcus Leech John Messenger Dinesh Mohan Bob Moskowitz Don O'Connor Don Pannell Glenn Parsons Ken Patton Karen Randall Allyn Romanow Dan Romascanu Jessy V Rouyer Ali Sajassi Dolors Sala John Sauer Sam Sambasivan Mick Seaman Koichiro Seto Muneyoshi Suzuki Jonathan Thatcher Geoff Thompson John Viega Preeti Vinayakray-Jani John Vollbrecht Dennis Volpano Karl Weber Ludwig Winkel Michael D. Wright

802.1 WG and TG operation n Consensus process; the ultimate test of consensus is the vote taken on a WG draft n Votes are not taken in Task Group or Interim meetings n WG Plenary meetings are used to take any “formal” votes n Most technical issues are resolved through Task Group ballots, prior to the formal Working Group ballot; i.e., we conduct the WG ballot only when we think we’re nearly done n Voting membership is NOT a pre-requisite to participate in TG or WG ballots n Focus is on technical progress, not studying/applying RR n Offline discussions are essential in achieving consensus

TG, WG, and Sponsor ballots n Task Group Ballots: –Anyone can respond and vote (although voting members are obliged to do so) –Asks the question: “Is this draft complete and ready for Working Group Ballot?” n Working Group Ballots: –Anyone can respond –Only voting members are able to (and are obliged to) vote –Asks the question: “Is this draft complete and ready for Sponsor Ballot?” n Sponsor Ballots: –Extrernal review process –Only members of the balloting group can participate –To join the various balloting pools, need to visit the IEEE website (pointer on the website)

Patents - Instructions for the WG Chair n At Each Meeting, the Working Group Chair shall: n Show slides #1 and #2 of this presentation n Advise the WG membership that: –The IEEE’s Patent Policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE SA Standards Board Bylaws; –Early disclosure of patents which may be essential for the use of standards under development is encouraged; –Disclosures made of such patents may not be exhaustive of all patents that may be essential for the use of standards under development, and that neither the IEEE, the WG nor the WG Chairman ensure the accuracy or completeness of any disclosure or whether any disclosure is of a patent that in fact may be essential for the use of standards under development. n Instruct the WG Secretary to record in the minutes of the relevant WG meeting: –that the foregoing advice was provided and the two slides were shown; –that an opportunity was provided for WG members to identify or disclose patents that the WG member believes may be essential for the use of that standard; –any responses that were given, specifically the patents and patent applications that were identified (if any) and by whom. (Not necessary to be shown)

6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards Slide #1

Inappropriate Topics for IEEE WG Meetings n Don’t discuss licensing terms or conditions n Don’t discuss product pricing, territorial restrictions or market share n Don’t discuss ongoing litigation or threatened litigation n Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Slide #2

Future meetings n January interim – Sacramento th January, hosted by Paul/HP n Need to think about May: –Barcelona? –Doesn’t look like interim in Edinburgh will happen n And soon after that it will be September again…

Liaison reports n (Bob) n IETF n (Don) n n ITU n TIA TR41.4

Sanity check – current PARs and PAR end dates n 802.1Q-REV: Must drive this forward ASAP. WG ballot in Nov/Dec. End date Dec ‘05 n 802.1AB: Nearly done – should be a done deal by Christmas. n 802.1AC (MAC Service): Initial draft – are we able to make progress on this yet? End date Dec ’05 n 802.1ad (Provider Bridges): WG ballot soon. End date Dec ’05 n 802.1AE (MAC security): WG ballot. End date May ’06 n 802.1af (Key agreement): Editor’s draft. End date Dec ’06 n 802.1ag (CFM): TG ballot. End date July ’07 n 802.1ah (Backbone PB) new PAR. End date Sept n 802.1aj (Two-port relay) new PAR. End date Sept n 802.1ak (MRP) new PAR. End date Sept 2007.

What are we going to do about… n Bridge MIB activity – do we need to raise a PAR (or PARs)? If so, we should be spending time on this in Sacto, and some input text for the PAR(s) would help. n and Bridging n Wireless management (Floyd’s tutorial) n Congestion management

Motions

MOTION n approves the July ‘2004 and October ‘2004 meeting minutes. n Proposed: Wright n Second:Finn –For: 19 Against: 0 Abstain:1

MOTION n resolves to hold an interim session in Sacramento, Mon 10 th January :00 AM through Thurs 13 th January 5:00 PM, hosted by HP n Proposed: wright n Second:messenger –For:20 –Against:0 –Abstain:2

MOTION n resolves to hold a pre-meeting on the Monday morning of the March 2005 plenary session. n Proposed: seaman n Second:wright –For: 20 Against: 0 Abstain:0

MOTION n requests conditional approval from the SEC, as per current P&P, to forward the P802.1AB draft to RevCom following completion of recirculation balloting n Proposed: wright Second: bell –For: 22 Against: 0 Abstain:0 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n instructs the editors of P802.1ad, Mick Seaman and Steve Haddock, to prepare a further draft taking into account the discussions during the Nov 2004 meeting, and issue the draft for a Working Group ballot. n Proposed: seaman Second:finn –For: 24 Against: 0 Abstain:0

MOTION n instructs the editor of P802.1Q-REV, Tony Jeffree, to prepare a further draft taking into account the discussions during the Nov 2004 meeting, and issue the draft for a Working Group ballot. n Proposed: seaman Second: wright –For: 23 Against:0 Abstain:0

MOTION n instructs the editor of P802.1ae, Allyn Romanow, to prepare a further draft taking into account the discussions during the Nov 2004 meeting, and issue the draft for a Working Group ballot. n Proposed: romanow Second: wright –For: 21 Against:0 Abstain:1

MOTION n instructs the editor of P802.1ag, Norm Finn, to prepare a further draft taking into account the discussions during the Nov 2004 meeting, and issue the draft for a Task Group ballot. n Proposed: finn Second: wright –For: 23 Against:0 Abstain:0

MOTION n requests permission from the SEC to forward the P802.1ah “Provider Backbone Bridges” PAR to NesCom. n Proposed: bottorff Second: wright –For: 20 Against: 0 Abstain:4

MOTION n requests permission from the SEC to forward the P802.1aj “Two port MAC Relay” PAR to NesCom. n Proposed: finn Second:bottorff –For: 23 Against: 0 Abstain:0 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n requests permission from the SEC to forward the P802.1ak “MRP” PAR to NesCom. n Proposed: finn Second:wright –For: 22 Against: 0 Abstain:1 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n approves the attached liaison contribution to the MEF n Proposed bottorff second wright n For 19 against 0 abstain 0

Source: IEEE Title: Response to Progress on Ethernet related recommendations COMMUNICATION STATEMENT To: MEF Approval: November 2004 meeting, San Antonio Contacts: Tony Jeffree, Chair. Mick Seaman, Interworking, TF Chair. Response At our November 2004 meeting, the MEF liaison to IEEE was brought to our attention. We would like to take the opportunity to provide feedback on your current recommendations. As you have correctly indicated four multicast addresses are available which are blocked by all 802.1D, 802.1Q, and 802.1ad bridges. These addresses are: C C C C A One of these addresses would be the correct address to use for your E-LMI protocol. None of these addresses are available for exclusive use by protocols outside 802.1, however as you suggested non-exclusive use based on the MEF using a unique EtherType for the E-LMI protocol is acceptable. The IEEE committee does not assign the use to an address until an approved protocol exists which will use the address. On review we believe the correct address for your use would be C At such a time as your protocol is an approved specification of the MEF we would be willing to approve an address for your use. Thank you for your request. We look forward to assisting you further as you specification moves to approval. Attachments [1] IEEE P802.1ad Draft 3.0

Motion n appoints Geoff Thompson as a liaison to 802.3, to replace Don Pannell who is no longer able to fulfil this role. n Moved messenger second wright n For 22 against 0 abstain 0