802.1 Closing Plenary - 07/2005 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Motions.

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PWG Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #2 and #3 of this presentation Advise the WG membership that:
Doc.: IEEE /864r0 Submission November 2003 Clint Chaplin, Symbol TechnologiesSlide 1 SG Operating Rules Anybody can vote, present, and make motions.
802.1 Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Exec stuff n Interim meetings n Task group stuff.
802.1 Closing Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Liaison stuff n Sanity check n New work…?!!
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
802.1 – Activities & status Tony Jeffree, WG Chair 22 March 2008.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
802.11k Berlin Agendas Richard Paine
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Jan. 16, 2006 C /09Chair, IEEE Opening January 2006 Interim Session #18 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
C /27 May 15, 2006Chair, IEEE Opening May 2006 Plenary Session #20 Jerry Upton- Chair Doug Knisely – Procedural.
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /706r1 Submission September 2003 Richard Paine, BoeingSlide k Singapore Agendas Richard Paine
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
802.1 – Activities & status Tony Jeffree, WG Chair 16 July 2007.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /1149r4 Submission November 2004 Donald Eastlake 3 rd, MotorolaSlide 1 IEEE s: ESS Mesh Networking Task Group San Antonio, Texas.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
802.1 – Activities & status Tony Jeffree, WG Chair 24 th July 2006.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
Siemens, Roke Manor (Recording Secretary )
802.11k Albuquerque Agendas Richard Paine
802.11k Orlando Agendas Richard Paine
IEEE 802 Handoff ECSG Chair’s Introduction
Submission Title: [WG-TG3b Meeting Report Sept04]
Stephen McCann, Siemens Roke Manor
Instructions for the WG Chair
IEEE s: ESS Mesh Networking Task Group
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
Tony Jeffree, WG Chair 6th July 2006
ADS Study Group Agenda Date: Authors: January 2005
APF Study Group Agenda September 13, 2004 September 2004
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
IEEE s: ESS Mesh Networking Task Group
Siemens, Roke Manor (Recording Secretary )
ATML #17 IEEE SCC20 DMC & TII Jan 2006 Plenary
Submission Title: [WG-TG3b Meeting Report September05]
doc.: IEEE /479r0 Mika Kasslin TGh chair
IEEE r: Fast BSS Transition TG Agenda
Submission Title: [WG-TG3b Meeting Report Sept04]
802.11p WAVE Opening and Agenda November p
Stephen McCann, Siemens Roke Manor
Submission Title: [WG-TG3b Meeting Report September05]
<month year> <January 2019>
TGi Preliminary Agenda
IEEE ESS Mesh Study Group
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2006 March 2006
IEEE IPR Policy Date: Authors: March 2006 March 2006
IEEE Wireless Coexistence TAG
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
802.11m Report November 2003 Month 1998 doc.: IEEE /xxx
Presentation transcript:

802.1 Closing Plenary - 07/2005 Agenda

Topics n Administrative stuff n IEEE Patent Policy n Interim meetings n Motions

Administrative stuff - 1 n Officers –Chair: Tony Jeffree –Vice Chair: Paul Congdon –Recording Secretary: Michael Wright –Interworking/Link Sec TG Chair: Mick Seaman –Link Sec TG Secretary: Allyn Romanow –Maintenance of website: John Messenger –Maintenance of exploder: Hal Keen n Website – –Username: p8021 Password: go_wildcats

Administrative stuff - 2 n Voting membership –Current membership rules (802 rules currently being revamped): –N.B. terminology: A session is (the whole of) an Interim or Plenary during which meets. A meeting is a subset of a session; I.e., a contiguous time period during the session when the WG meets. Generally meetings are ½ day in duration or less. –To gain membership: Attend 2 plenaries in the span of the four most recent plenaries (one interim can be substituted) and inform the Chair of your intention to become a voter. Membership is then gained at the start of the next plenary attended –To maintain membership: Attend 2 out of the last 4 plenaries one interim can be substituted), and respond to 2 out of 3 most recent WG/TG ballots –Attendance is as per signup sheet – must be 75% of meetings during a session in order to count. –Signing the signup sheet for a meeting declares that you have (or will have) attended during the majority of the allotted time for that meeting. Hence, at sessions where more than one WG meets, signing up at two parallel meetings is not valid. n Voting rights are properly regarded as an obligation, not a privilege!

Administrative stuff - 3 n May have to generate “policies & procedures” for –We don’t have any formal P&P right now –802’s P&P require us to have a defined procedure for electing 802.1’s Chair & Vice Chair –Not clear that we need anything else but I will check. No treasury

Patents - Instructions for the WG Chair n At Each Meeting, the Working Group Chair shall: n Show slides #1 and #2 of this presentation n Advise the WG membership that: –The IEEE’s Patent Policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE SA Standards Board Bylaws; –Early disclosure of patents which may be essential for the use of standards under development is encouraged; –Disclosures made of such patents may not be exhaustive of all patents that may be essential for the use of standards under development, and that neither the IEEE, the WG nor the WG Chairman ensure the accuracy or completeness of any disclosure or whether any disclosure is of a patent that in fact may be essential for the use of standards under development. n Instruct the WG Secretary to record in the minutes of the relevant WG meeting: –that the foregoing advice was provided and the two slides were shown; –that an opportunity was provided for WG members to identify or disclose patents that the WG member believes may be essential for the use of that standard; –any responses that were given, specifically the patents and patent applications that were identified (if any) and by whom. (Not necessary to be shown)

6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards Slide #1

Inappropriate Topics for IEEE WG Meetings n Don’t discuss licensing terms or conditions n Don’t discuss product pricing, territorial restrictions or market share n Don’t discuss ongoing litigation or threatened litigation n Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Slide #2

Photography/recording devices & other techno toys n No use may be made of cameras or recording devices in meetings without the express knowledge and assent of all participants in the meeting. n Participants are reminded of the fact that mobile phones are usually fitted with an “off” switch (or at the very least, a “stun” setting).

Future meetings n Sept interim: –Option on Hyatt Sacramento – week of 26th –Possible piggybacking on 802.3’s NH interim week of 12 th –Possible Orange County with week of 18 th (registration already available - n And soon after that it will be January again…and May…any offers?

Liaison reports n (Bob) n IETF n (Don) n n ITU n TIA TR41.4

Sanity check – current PARs and PAR end dates n 802.1Q-REV: Sponsor recirc. End date Dec ‘05 n 802.1AC (MAC Service): Initial draft – request to extend PAR n 802.1ad (Provider Bridges): Sponsor recirc. End date Dec ’05 n 802.1AE (MAC security): Sponsor ballot before November. End date May ’06 n 802.1af (Key agreement): Editor’s draft. End date Dec ’06 n 802.1ag (CFM): TG ballot. End date July ’07 n 802.1ah (Backbone PB) Second draft – TG ballot. End date Sept 2007 n 802.1aj (Two-port relay) Second draft – TG ballot. End date Sept 2007 n 802.1ak (MRP) TG ballot. End date Sept 2007 n Proposed PAR – P802.1AM (Wireless management) n Proposed PAR – P802.1AP (Q MIB) n Proposed PAR – P802.1aq (Shortest Path Bridging) n Proposed PAR – P802.1AR (Device identifiers)

What are we going to do about… n and Bridging n Congestion management n ResE

Motions

MOTION n approves the March 2005 meeting minutes. n Proposed: Romanow n Second: finn –For: 23 Against: 1 Abstain: 1

MOTION n resolves to hold an interim session in Orange County, week of 18 th Sept 2005 hosted by the wireless groups n Proposed: seaman n Second:Congdon –For: 22 –Against: 1 –Abstain: 4

MOTION n resolves to hold an interim meeting, date and location to be decided, for the specific purpose of progressing work on “Residential Ethernet” n Proposed: seaman n Second:congdon –For: 16 –Against: 2 –Abstain: 9

MOTION n resolves to hold a pre-meeting on the Monday morning of the November 2005 plenary session. n Proposed: seaman n Second: romanow –For: 22 Against: 0 Abstain: 4

MOTION n instructs the editor of P802.1Q-REV, Tony Jeffree, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Sponsor recirculation ballotting. n Proposed: seaman Second: haddock –For: 25 Against: 0 Abstain: 1

MOTION n requests conditional approval from the EC, as per current P&P, to forward P802.1Q- REV to RevCom following completion of Sponsor balloting n Proposed: Seaman Second: haddock –For: 25 Against: 0 Abstain: 1 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n instructs the editors of P802.1ad, Steve Haddock, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Sponsor recirculation ballotting. n Proposed: haddock Second: patton –For: 25 Against: 0 Abstain: 1

MOTION n requests conditional approval from the SEC, as per current P&P, to forward P802.1ad to RevCom following completion of Sponsor balloting n Proposed: Haddock Second: patton –For: 25 Against: 0 Abstain: 1 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n instructs the editors for P802.1AE to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Working Group recirculation ballotting. n Proposed: romanow Second: finn –For: 23 Against: 0 Abstain: 4 –

MOTION n requests conditional approval from the SEC, as per current P&P, to forward P802.1AE to Sponsor ballot following completion of Working Group balloting n Proposed: Romanow Second: finn –For: 23 Against: 0 Abstain: 4 n SEC Proposed: Jeffree, Second: –For: Against: Abstain:

MOTION n instructs the editor of P802.1ag, Norm Finn, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Task Group ballotting. n Proposed: finn Second: messenger –For: 25 Against: 0 Abstain: 2

MOTION n instructs the editor of P802.1ah, Paul Bottorff, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Task Group ballotting. n Proposed: bottorff Second: sajassi –For: 23 Against: 0 Abstain: 3

MOTION n instructs the editor of P802.1aj, Tony Jeffree, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Task Group ballotting. n Proposed: seaman Second: mohan –For: 24 Against: 0 Abstain: 2

MOTION n instructs the editor of P802.1ak, Tony Jeffree, to prepare a further draft taking into account the discussions during the July 2005 meeting. The Chair is authorised to issue the draft for Task Group ballotting. n Proposed: seaman Second: haddock –For: 24 Against: 0 Abstain: 2

MOTION n requests permission from the EC to forward the P802.1AR Secure Device Identifier draft PAR to NesCom. n Proposed: Seaman Second: congdon –For: 21 Against: 0 Abstain: 5

MOTION n requests permission from the EC to forward the P802.1aq Shortest Path Bridging draft PAR to NesCom. n Proposed: Seaman Second: finn –For: 23 Against:0 Abstain: 3

MOTION n requests permission from the EC to forward the P802.1ap VLAN Bridge MIBs draft PAR to NesCom. n Proposed: Seaman Second: congdon –For: 25 Against: 0 Abstain: 2

MOTION n requests permission from the EC to forward the P802.1AM Wireless Management draft PAR to NesCom. n Proposed: Seaman Second: stefani –For: 13 Against: 3 Abstain: 9

MOTION n requests permission from the EC to forward the revised P802.1AC MAC Service draft PAR to NesCom. n Proposed: Seaman Second: congdon –For: 23 Against: 0 Abstain: 3

MOTION n requests the Chair to forward the liaison response to Q5 SG13 as discussed during this meeting. n Proposed: Finn Second: congdon –For: 22 Against: 0 Abstain: 2

MOTION n requests its Chair and liaisons to present the current working draft of P802.1ag to ITU-T Q5 SG13 and MEF. n Proposed: Finn Second: Mohan –For: 20 Against: 0 Abstain: 2