MSF Roadmap 2011-12 Wayne Cutler Technical Committee Chair

Slides:



Advertisements
Similar presentations
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Advertisements

1 Introducing the Specifications of the Metro Ethernet Forum.
Overview MSF LTE/EPC IOT
All-IP Transition Initiatives June 17, ATIS Board of Directors’ Meeting October 20, 2011 NANC Meeting June 17, 2014 IP Transition Work within.
GMI 2006 Carrier-Driven Interoperability February 2006.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Mapping FMCA Wi-Fi SIP Reqs to IEEE Date Submitted: Presented.
Report from the Cloud Services Forum Andrew White, CSF Chair Nokia Siemens Networks October 17, 2011.
TETRA Inter System Interface (ISI)
SIP-IMS CONFORMANCE TESTING STANDARDIZATION WORK PLAN VICE-CHAIRMAN OF ITU-T SG11 MARTIN BRAND.
TIPHON IP Telephony Implementation Association TIPIA Overview Ayse Dilber, Michael Blaschitz TIPIA Vice-Chair, TIPIA Chair
Standards for Shared ICT Jeju, 13 – 16 May 2013 Gale Lightfoot Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS Cybersecurity Standards.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
ITU-T Study Group 13 Communications to IETF CCAMP Working Group Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP
DOCUMENT #: GSC15-GTSC8-02 FOR: Presentation SOURCE: ATIS AGENDA ITEM: GTSC8; 4.1 CONTACT(S): Wayne Zeuch ATIS:
World Class Standards Update on NGN Standards ETSI TISPAN Sonia Compans ETSI Technical Officer February 2009.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
GISFI_SeON_ GISFI#09, Jun SeON WG (GISFI #9) Agenda GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:
DOCUMENT #:GSC15-PLEN-48 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 6.10 CONTACT(S): James McEachern
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All IPTV in ETSI Bruno Chatras, ETSI TC TISPAN Vice-Chairman Document No: GSC16-PLEN-09 Source: ETSI.
Report – SeON WG GISFI #8 GISFI # 08, Mar 26-28, 2012, Patna Chair: Parag Pruthi (NIKSUN) Chair-Delegate: Ashutosh Dutta (NIKSUN) Vice-Chair: Debabrata.
3GPP Rel-13 Interworking discussions
GISFI_SeON_ GISFI#09, Jun Report – SeON WG GISFI #9 GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Conformance and Interoperability Testing Jørgen Friis VP ETSI SES (Standards Enabling Services)
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
SeON WG (GISFI #8) Agenda GISFI # 08, Mar 26-28, 2012, Patna Chair: Parag Pruthi, NIKSUN Chair-Delegate: Ashutosh Dutta, NIKSUN Vice-Chair: Debabrata Nayak,
Network Structures WG Paul Griffin 13 January 2006.
DOCUMENT #:GSC15-PLEN-82r2 FOR:Presentation SOURCE:ATIS AGENDA ITEM: PLEN 6.14 CONTACT(S): Andrew White ATIS’
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
ATIS: Work on Next Generation Networks (NGN) Presented by: Bill O’Shea Chair, ATIS NGN-FG President, Bell Laboratories & CTO & EVP, Corporate Strategy.
3GPP Rel-13 Interworking discussions
GISFI_GICT_ GISIF#8, , March 2012, Patna 1 GISFI#8 Green ICT Working Group: Activity Update and Agenda Company:NEC Corporation Author(s):Chair.
Dan Warren Senior Director of Technology, GSMA Letting LTE Find its Voice.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS: Advancing the Next Generation Network Wayne Zeuch, ATIS Document No: GSC16-GTSC9-09 Source:
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
ITU-T Study Group 13 and L1 VPNs Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP/VPN WGs Q.2/13 Rapporteur
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 NNI standards for IMS inter-connection including mobile and fixed IMS network.
Report January 18, 2016 doc.: /0132r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 18 January 2016 Authors:
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
Jeju, 13 – 16 May 2013Standards for Shared ICT Andrew White Principal Consultant Nokia Siemens Networks ATIS’ Cloud Services Activity Document No: GSC17-PLEN-64.
Jeju, 13 – 16 May 2013Standards for Shared ICT IPTV & Content Delivery in ETSI Presenter: Chantal Bonardi ETSI Secretariat Technical Officer Document No:
DOCUMENT #:GSC15-PLEN-82 FOR:Presentation SOURCE:ATIS AGENDA ITEM: PLEN 6.14 CONTACT(S): Andrew White ATIS’
3GPP Rel-13 Interworking discussions Group Name: TP #18 Source: Rejesh Bhalla, ZTE Corporation, Meeting Date: Agenda Item:
Jim McEachern Senior Technology Consultant ATIS July 8, 2015.
Review of new Question descriptions under ITU-T SG11
ATIS Interoperability
Kenjiro Arai NTT ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 NNI standards for IMS inter-connection.
2 TTC WG restructuring TTC is responsible for ICT standardization except for radio and broadcasting issues in Japan. TTC is accredited by MIC to engage.
Philippe Millet, Chair.
ETSI–3GPP NGN ACTIVITIES
ATIS Priorities and Initiatives Susan Miller, President & CEO, ATIS
2 ATIS 5G OVERVIEW ATIS launched its 5G Ad Hoc in 2015 to advance regulatory imperatives, deliver an evolutionary path, address co-existence of technologies,
NNI Definition, Service Interoperability, Business Model Definition
Automated Interoperability Testing
3GPP Rel-13 Interworking discussions
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
ATIS’ Cloud Services Activity
Industry Numbering Committee (INC) Report to the NANC
ATIS Interoperability
ATIS Interoperability
ATIS Priorities and Initiatives Susan Miller, President & CEO, ATIS
I3forum : Terms of Reference WG “IMS-based services and related platforms’ interconnection” Version 1 May 19th 2016.
Architecture and Protocols
ETSI Standardization Activities on Smart Grids
ATIS’ Cloud Activity Andrew White Nokia Siemens Networks
ETSI–3GPP NGN ACTIVITIES
IPTV & Content Delivery in ETSI
3gpp-liaison-report-may-2005
Presentation transcript:

MSF Roadmap Wayne Cutler Technical Committee Chair

Copyright 2011: MultiService Forum Headline Items VoLTE Network Robustness Content Distribution Networks (CDNs) Network-to-Network Interface (NNI) Performance Testing

Copyright 2011: MultiService Forum VoLTE (1/2) VoLTE IOT Event planned for September 2011 Builds on the LTE/EPC executed in March 2010 Executes tests not performed at previous IOT event Validates GSMA Permanent Reference Documents IR.88, IR.92, IR.65 Joint event with GSMA – co-operation agreement signed VoLTE IOT officially announced at GSMA MWC in February 2011

Copyright 2011: MultiService Forum VoLTE (2/2) Scope of VoLTE IOT event completed. Five defined scenarios : VoLTE (compliant to GSMA PRD IR.92), Roaming & Interconnect, (compliant to GSMA PRD's IR.65 and IR.88), 2G/3G access to EPC via both legacy/S4-SGSN, Handovers (intra LTE & LTE 2G/3G), SON (Self-Optimising Networks). See

Copyright 2011: MultiService Forum Network Robustness (1/3) Multi-part Work Item covering : N/W Monitoring, Congestion & Overload Control, Disruption Testing, Network feedback & instabilities, Prioritization, End-End QoS, inc. NNI QoS in particular

Copyright 2011: MultiService Forum Network Robustness (2/3) First IOT event, “P-IOT 2010” completed, November 8 th -19 th 2010 at NCS's XTC labs in Chantilly, Virginia P-IOT 2010 was the 1st of a series of planned IOT events and White Paper published February 2011 and liaised to i3Forum & GSMA. P-IOT 2010 focussed on the reporting / logging capability of SBGs (both access & n/w side) and includes: Voice sessions via an IMS core under varying load conditions Video sessions via an IMS core under varying load condition Data sessions under varying load conditions

Copyright 2011: MultiService Forum Network Robustness (3/3) Next phase of work currently being scoped out Feedback received from i3Forum in response to MSF liaison following P-IOT 2010 event Potential future topics: Testing PCRF under congestion, LTE & Metro Ethernet Congestion, Additional Operational Measurement & CRD analysis, Further NNI testing, IP6 testing on SBGs & IP4/IP6 inter-working.

Copyright 2011: MultiService Forum Content Delivery Networks Formal Work Item (WI) adopted in April 2010 Conduct Architectural Analysis and develop architectural framework for CDNs taking input from all SDOs LS received from ITU-T SG13 regarding (inter alia) CDN Functional Architecture Framwork Define Physical Scenarios and Test Cases for an IOT event IOT Event planned for Q2 2012

Copyright 2011: MultiService Forum NNI Performance Testing New WI agreed in Q Study of IP NNI work in other fora Creation of a NNI Profile Considers both national & international IP NNI LSs sent to ATIS PTSC NG-CI, ETSI TC-INT, i3F & GSMA Define Physical Scenarios and test plans for future IOT events Initial scope of work looking at North American IP NNI based on ATIS specs - IOT event planned for Q4/11. Close co-operation with ATIS PTSC NG-CI Subsequent work to look at international IP NNI

Copyright 2011: MultiService Forum MSF White Papers Please note that all MSF White Papers relating to MSF IOT Events are publicly available at

Thank You