WG4 report to SC31 plenary Toronto 6 June 2008. WG4ConvenorMr. Henri Barthel WG4SecretaryMr. Gertjan van den Akker SG1 - Application Interface ProtocolsConvenorMr.

Slides:



Advertisements
Similar presentations
SIGAda2001© 2001, The MITRE Corporation. Permission is granted to reproduce without modification.James W. Moore - 1 ISO/IEC Standardization James W. Moore.
Advertisements

EPC/RFID - Global Progress Bill McLeer EPCglobal US.
ISO/IEC JTC1 SC37 Overview
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
LMS/RFID (Dis)integration Why Standards Matter Mick Fortune.
Status of IEEE A Suite of Smart Transducer Interface Standards for Sensors and Actuators November 28, 2006 Kang Lee
The road vehicle standards June 2001 Presentation to WP 29 of the business plan of ISO/TC22.
1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 20 March 2014 Authors: NameCompanyPhone .
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 19 February 2014 Authors: NameCompanyPhone .
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
Submission doc.: IEEE 22-14/0103r1 Apurva N. Mody, BAE SystemsSlide EC Closing Motions Package Date: Authors:
ISO/IEC JTC1 SC 32 WG1 eBusiness July 2007 JTC1 SC32 N1620.
1 WG2 N2688 – SC2 N3704 SC 2 Business Plan (Coded Character Sets) Kohji Shibano SC 2 Chair.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
SC38-SC32 Liaison Report Berlin SC32 Plenary, Baba Piprani SC32 N2235 Dated: R1.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
SC32/WG2 N0879 Proposal for WG2-level formal resolution using Bugzilla Japan National body ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/26-30.
Presentation on editors draft resolution of comments on SC32 N2148 PDTR ISO/IEC JTC 1/SC 32 Plenary and WG2 meeting Berlin, Germany, 7, June, 2012.
SC32/WG2 N889 Guideline to use Bugzilla in SC32WG2 (supersedes SC32/WG2 N0879) Bugzilla Drafting Committee SC32WG2 ISO/IEC JTC1 SC32 WG2 Toronto Meeting.
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
Doc.: IEEE /0456r0 Submission April 2008 Jesse Walker, Intel CorporationSlide 1 Geneva JTC1/SC6 Liaison Report Date: Authors:
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
SC32/WG2 N Status report on ISO/IEC CD MMF Ontology Registration He Keqing and OKABE, Masao Project editor MMF Ontology Registration ISO/IEC JTC1.
Doc.: IEEE Submission November 2007 Robert F. Heile, ZigBee AllianceSlide EC actions/agenda items for Friday, November 16, 2007.
Status report of : Framework for generating ontologies (FGO) ISO/IEC JTC 1/SC 32 Plenary and WG2 meeting Kona, USA, 19 May, 2011 Dongwon Jeong,
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AB 20 March 2014 Authors: NameCompanyPhone .
Doc.: IEEE /262r1 Submission July 2002 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
The InterNational Committee for Information Technology Standards INCITS JTC 1 State of the Union Karen Higginbottom ISO/IEC JTC 1 Chair
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE Submission March 2009 George Cavage, iControl Inc.Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
The InterNational Committee for Information Technology Standards INCITS New DIS/FDIS Balloting Procedures INCITS TC Officers Annual Symposium April 11-13,
ISO TC204 WG8 Convenor’s Report Public Transport and Emergency Services April 2006 Busan, South Korea.
IEEE CS SAB, Mar 2009 IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society
James W. Moore Liaison Representative IEEE Computer Society June 2004
ISO/IEC JTC 1/SC 7 Working Group 42 - Architecture Johan Bendz
ISO/TC 204 WG 3-Database Technologies
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
EC Motions Package Authors: Date: October 2016
EC Motions Package Authors: Date: October 2016
ISO TC268 SC1 - Smart Community Infrastructures -
July Plenary EC Closing Motions Package
Yong-Woon KIM Hyoungjun KIM TTA
Status Report November 2007
2017 Amendments to the INCITS Organization, Policies and Procedures
Frances Cleveland Convenor WG15
28 May ~ 2 June, 2006 HyoungJun KIM TTA/ETRI
Working Group November Plenary EC Closing Motion
July 2001 doc.: IEEE /365r1 July 2001 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WPAN.
Working Group November Plenary EC Closing Motion
2017 INCITS Officer’s Symposium
July 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
July Plenary EC Closing Motions Package
Working Group March Plenary EC Closing Motions Package
RFID in CEN TC225 and ISO/IEC JTC1
IEEE Motions in July Plenary DCN:
28 May ~ 2 June, 2006 Hyoungjun KIM TTA/ETRI
Submission Title: f Task Group Closing Report for Atlanta, Georgia
Submission Title: f Task Group Mid-Week Report for Atlanta, Georgia
April 19 January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for Taipei.
Sept 2008 Closing Plenary Motions
March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Review to IEEE of: ISO JTC1/SC31/WG5.
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
2016 INCITS Officer’s Symposium
P b to RevCom: Conditional Approval Request
Submission Title: [WG-TG3 closing Report July02]
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
Transport Safety Standards Committee 38th Meeting
Presentation transcript:

WG4 report to SC31 plenary Toronto 6 June 2008

WG4ConvenorMr. Henri Barthel WG4SecretaryMr. Gertjan van den Akker SG1 - Application Interface ProtocolsConvenorMr. Rick Schuessler SG3 - Air InterfaceConvenorMr. Steve Halliday SG5 - Implementation guidelinesConvenorMr. Toshihiro Yoshioka Regulatory IssuesRapporteurMr. Josef Preishuber-Pflügl SC31/WG4 Organisation

WG4 Meetings DatesLocationWG4SG1SG3SG5Reg Shonan Villagex Aix-en-ProvencexX ClearwaterXXx Viennax TorontoXXX

SG1 – Application Interface Protocols

WG 4/SG 1 Work Projects ISO/IEC Data protocol: application interface (4 parts) PE: Paul Chartier ISO/IEC Data protocol: data encoding rules and logical memory functions PE: Paul Chartier ISO/IEC Application protocol: encoding and processing rules for sensors and batteries PE: Paul Chartier ISO/IEC Software System Infrastructure (six parts) Sr PE: Joo-Sang Park PEs: Scott Barvik, Rob Buck, Masaki Ehara, Ho-Won Kim, Curtis L. Rozeboom Data Constructs Steering Committee (for AFI’s)

SG3 – Air Interface Initial standards published for five air interfaces in 2004 All air interface standards re-opened to include batteries & sensors functionalities New work coming up on Security

SG3 – Air Interface ISO/IEC FDIS ISO/IEC CD ISO/IEC FDIS ISO/IEC AM2 WD ISO/IEC FDIS ISO/IEC FCD ISO/IEC Published

SG5 – Implementation Guidelines TR Part 1: RFID- enabled labels and packaging supporting IEO/IEC C, Published TR Part 2: Recycling and RF tags, Published TR Part 3: Implementation and operation of UHF RFID Interrogator systems in logistics applications, PDTR ballot TR Part 4: RFID guideline on tag data security, DTR ballot

Rapporteur on frequency regulations Serve as SC31 contact person for global RFID radio regulations Provide updates on changes in global regulations to SC31 and WG4 Participate in WG4, WG4/SG3 and WG3/SG1 meetings to provide regulatory inputs

GS1 and EPCglobal ARO requests

A change in the ISO/IEC JTC 1 directives regarding the referencing of external documents was noted early 2008 GS1 and EPCglobal considered the 2 options 1. Submit a parallel ballot for approving the referenced specification in addition to the normal SC31 ballot 2. Submit an application to JTC 1 for recognising the organisation as an Approved Referenced Specification Originator Organization (ARO) The latter option was chosen for the following reasons: Multiple SC31 standards already make a normative reference to the GS1 General Specifications and to EPCglobal specifications It is expected that many revised and new SC31 standards will continue requiring normative references to GS1 and EPCglobal specifications

ARO requests cont’d For GS1, ISO/IEC JTC 1 N 8933 ballot was issued on with a closing date of For EPCglobal, ISO/IEC JTC 1 N 8972 ballot was issued on with a closing date of Both ballots passed with comments SC31 has requested SC31/WG4 to review the comments and to pass a resolution confirming this process

ARO ballot GS1 – JTC Canada – No with comments France – Abstain with comments Germany – Abstain with comments South Africa – No with comments

ARO ballot EPCglobal – JTC Sweden – Yes with comments Canada – No with comment France – No with comments Germany – Abstain with comments South Africa – No with comments UK – No with comments

SC31/WG4 resolutions 14. Approved RS Originator Organization (ARO) - EPCglobal, Inc. In accordance with the JTC 1 directive: “SC 31 is instructed to review and respond to the comments submitted on the EPCglobal, Inc. request prior to any further action being taken by JTC 1.” SC 31/WG 4 instructs the SC 31 Secretariat to provide a resolution, at the Toronto Plenary, to accept the completed comments addressed in SC031-N-2545 and forward to JTC 1 for further processing. 15. Approved RS Originator Organization (ARO) - GS1 In accordance with the JTC 1 directive: “SC 31 is instructed to review and respond to the comments submitted on the GS1 request prior to any further action being taken by JTC 1.” SC 31/WG 4 instructs the SC 31 Secretariat to provide a resolution, at the Toronto Plenary, to accept the completed comments addressed in SC031-N-2546 and forward to JTC 1 for further processing.

Thank you!