ATLAS SCT Barrel PARM. Tyndel 114-May-2003 ATLAS SCT Barrel PAR - Introduction uOver-view of the Barrel SCT Õ Modules Õ LM tapes & optical harnesses Õ.

Slides:



Advertisements
Similar presentations
Construction of the ATLAS SCT Endcap Modules Steve Snow Manchester University On behalf of the ATLAS SCT Collaboration Context - ATLAS, Inner Detector,
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
AOW 2003 Prague - SCT ReportZ. Doležal 116-Sep-03 ATLAS SCT Status Report zOverview of major production issues uSilicon sensors & FE ASIC procurement uPower.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
ID ASSO – SCT Production StatusM. Tyndel 117-Dec-2002 ATLAS SCT Production Status Alex Grillo uOverview uProcurement Õ Silicon detectors Õ ASICs uBarrel.
Prepared by M. Tyndel, ATLAS Plenary Jun ATLAS ID - SCT Status Report Highlights from SCT week Valencia June uProcurement of sensors & FE ASICs.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
Steinar Stapnes, LBNL The ATLAS ID. zOutline : uBrief ID Overview [FIG]: ÕThe Transition Radiation Tracker (TRT) ÕThe Semi Conductor Tracker.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Michał Dwużnik, for the SCT collaboration
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.
J.R. Carter SCT Barrel Module PAR - Overview 1 14th May 2003 ATLAS SCT BARREL MODULE PAR COMPONENTS AND PRODUCTION OVERVIEW Janet Carter, Cambridge TOPICS:
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
ATLAS SemiConductor Tracker Detector Module Design and Performance — Towards Production of Detector Components Lars Eklund for the ATLAS/SCT Collaboration.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
25/02/2010 Y. Ikegami, KEK Advanced Silicon Radiation Detectors, Manchester1 Development of silicon strip-module for very high radiation environment G.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
DPF2000 ATLAS Pixel Detector M. G. D. Gilchriese Lawrence Berkeley National Laboratory August 2000.
01/10/2009 Y. Ikegami, KEK RD09, Florence1 Development of low-mass, high-density, hybrid for the silicon microstrip sensors in high track density environment.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
ETD PID meeting We had many presentations dedicated to the PM test .
End-cap Mechanics FDR Overview of the Project
DAQ for ATLAS SCT macro-assembly
Mechanics: (Tim).
Status report of the ATLAS SCT optical links
Constructional requirements from ITk-Strips
LHCC Upgrade Session, 12 March 2013
Work packages status in Torino and perspectives
ATL-IC-ES new version available - approval starts
Pixel Detector System (Barrel & Forward)
Updates on the Silicon Tracker 2S Module
Presentation transcript:

ATLAS SCT Barrel PARM. Tyndel 114-May-2003 ATLAS SCT Barrel PAR - Introduction uOver-view of the Barrel SCT Õ Modules Õ LM tapes & optical harnesses Õ Cooling Õ Support structures Õ Assembly uSchedule uCritical issues Õ Modules Õ LM tapes & optical harnesses Õ Cooling Õ Support structures Õ Assembly

ATLAS SCT Barrel PARM. Tyndel 214-May-2003 Overview of the Barrel SCT

ATLAS SCT Barrel PARM. Tyndel 314-May-2003 Modules FE ASICs (6+6) Kapton Hybrid Silicon detectors Thermal Carbon/Beryllia baseboard

ATLAS SCT Barrel PARM. Tyndel 414-May-2003 Modules - Gain, Offset & Noise extracted from threshold scan

ATLAS SCT Barrel PARM. Tyndel 514-May-2003 LM tapes & Optical Harnesses Modularity 1  4088 cables

ATLAS SCT Barrel PARM. Tyndel 614-May-2003 LM tapes & Optical Harnesses Barrel dogleg

ATLAS SCT Barrel PARM. Tyndel 714-May-2003 Cooling Pipes

ATLAS SCT Barrel PARM. Tyndel 814-May-2003 Support Structures

ATLAS SCT Barrel PARM. Tyndel 914-May-2003 Project engineer fixing bracketsDogleg + LM tape sample Dummy module QA! Assembly

ATLAS SCT Barrel PARM. Tyndel 1014-May-2003 Barrel Sector

ATLAS SCT Barrel PARM. Tyndel 1114-May-2003 Barrel electrical system test

ATLAS SCT Barrel PARM. Tyndel 1214-May-2003 Schedule

ATLAS SCT Barrel PARM. Tyndel 1314-May-2003 Critical issues uModules ÕSchedule Start-up & production rates of module clusters ÕAssembly yield uLM tapes & optical harnesses ÕSchedule Start-up of production ÕValidation of mechanical spec & performance ÕIn-situ repair/rework uCooling ÕContinuing design changes Isolators Capillary interface uSupport structures ÕComplexity/No. of (small) parts uAssembly ÕSchedule