Alternating PICC and PCD support Songdo, September 2011 Prepared by: ACS, Bundesdruckerei, Infineon WG8 N 1836 TF2 N 705.

Slides:



Advertisements
Similar presentations
Ninth Replenishment of IFAD’s Resources Draft Resolution: Revisions made since the 2 nd Session of Consultation October 2011.
Advertisements

1 “Introduction to EU Trade Policy” – July 2008 How We Make Trade Policy n Contents n Part I: EU Trade Powers n Part II: The evolving scope of Trade Policy.
CC sponsors and PMs John Harvie, Steve Hulm MRPO 25 April 2007.
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Simplification of Regulations Light Sources Regulations Nos. 37, 99, 128 Clarification 8 April 2015 GRE IWG SLR Informal Working Group Simplification of.
Broadband to everybody!? Torstein Olsen Director Norwegian Post and Telecommunications Authority LLU Conference, Bucharest, 5 July 2005.
International Ice Charting Working Group IICWG IV Data, Information & Customer Service Standing Committee Report Co-Chairs Henrik Steen Andersen & Bob.
Intercompany Project Time and Expenses Scenario Overview
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Development of WIPOSTAD Progress report by the International Bureau Committee on WIPO Standards Geneva May Anna Graschenkova Industrial Property.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
WG8 N 1673 Late DIN comment to FCD Ballot ISO/IEC /FPDAM8 = WG8 N 1638 (SC17 N 3836) Source:
NFC - Near Field Communication Technology
Submitted By: A.Anjaneyulu INTRODUCTION Near Field Communication (NFC) is based on a short-range wireless connectivity, designed for.
1 Progress Report from NFC Working Group General Meeting Copenhagen 18 April 2013 Round Table 1.
ASU Course Registration System System Analysis Communication Diagram Use Case: Select Courses to Teach.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
SC32/WG2 N0879 Proposal for WG2-level formal resolution using Bugzilla Japan National body ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/26-30.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Draft progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by chair of IWG AECS Informal document GRSG-106-ХХ 106.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
1 Proposed Results Management Framework for K. Cleaver, AP/PMD for CRMT, 7 April 2009 Policies and Criteria for IFAD Financing Informal Board.
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Proposed Presentation for 3GPP Date Submitted: September,
©© 2013 SAP AG. All rights reserved. Cash and Liquidity Management Scenario Overview Processing Payables and Payments Managing Petty Cash Processing Receivables.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA WPT activities & Proposal of revised resolution Dr. Hyeonwoo, LEE Chairman of TTA PG709, TTA Document.
A Tutorial Institutional Research and Effectiveness.
Elena Saharnean, SOE Fintehinform Chisinau, June 3, 2016.
LHA Implementation 2007 The Rent Service and Local Housing Allowance.
/13 LLCPS draft-urien-tls-llcp-01.txt Pascal Urien IETF 86, Orlando, FL, USA March 15th
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
Cash and Liquidity Management Scenario Overview
Operating Mode 1 – Peer-Peer
Response to Official Comments
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Intercompany Project Time and Expenses Scenario Overview
Simplification of Lighting and Light-Signalling Regulations
Status Report November 2007
Draft Resolution: Revisions made since the 2nd Session of Consultation
Customer Contract Management Scenario Overview
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Order-to-Cash (Project-Based Services) Scenario Overview
Procedural review of initial WG ballot on P802.1CF
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Expense Reimbursement Scenario Overview
Customer Contract Management Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Online Discipline Reporting
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Progress report of GRSG informal group
Informal document GRE Rev.1
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
JTC1 ad hoc closing report (May11)
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Informal document GRE-80-0X
Response to Official Comments
IEEE MEDIA INDEPENDENT HANDOVER DCN:
<month year> doc.: IEEE < e> <September 2019>
Status of discussion after 7th meeting
Presentation transcript:

Alternating PICC and PCD support Songdo, September 2011 Prepared by: ACS, Bundesdruckerei, Infineon WG8 N 1836 TF2 N 705

Rationale  WG8 decided in April 2010 to let investigate the needs of mobile devices using the interface.  WG8 Convener reported accordingly to the SC17 Plenary in October 2010 and SC17 approved Resolution 639/10: New WG8 PWI into ‘Specifying the specific needs of mobile devices using the ISO/IEC methods‘ JTC1/SC17 approves the launch of a PWI assigned to WG8, into ‘Specifying the specific needs of mobile devices using the ISO/IEC methods’, with a view to developing an NP and accompanying working draft. If WG8 do not complete this within a year, they are to report back on progress to the next SC17 plenary.  Due to that Resolution 639/10 WG8 Members have been encouraged to work on the PWI and possibly to submit a Working Draft.  DIN has followed SC17’s offer and presents such a Working Draft, proposed in TF2 N 704 = WG8 N Page 2

 Defines two devices  PCDProximity Coupling Device  PICCProximity Card or Object Page 3 ISO/IEC  PCD shall poll for Type A and Type B PICCs  PICC shall respond to Type A or Type B commands PCDPICC

Market needs  Upcoming devices should support both, PCD and PICC roles of ISO/IEC  Market increasingly brings up eID applications, which run purely according ISO/IEC Specifically mobile devices should be able to communicate with eID related contactless objects.  Also finance and transport sectors are interested in letting customers use contactless bank cards, resp. tickets, via mobile devices like mobile phones.  Such devices should be able to communicate with:  PICCs (in PCD role)  PCDs (in PICC role)  another equivalent device (which one is in PICC or PCD role is to be initially negotiated)  => creation of a new device fulfilling above needs Page 4

Page 5 ISO/IEC – Extended Proximity Device (EPD)  Extended Proximity Device supports PCD AND PICC Mode  Initial Mode is PICC Mode (either Type A or Type B)  Entering PCD Mode only if no external RF field is detected  In PCD Mode poll for Type A and Type B PICCs  Manual or automatic Mode selection EPD PCD ModePICC Mode

Scenarios  Scenario 1: EPD in automatic mode alternation Set datePage 6 t A B Start tPICC1tPCD tPICC2 tPICCi > tPCD tPICCi ≠ tPICCj EPD PCD Mode PICC Mode A B Check for external RF field RF Off RF On

Scenarios  Scenario 2: EPD and PICC Set datePage 7 t A B tPICC1tPCDtPICC2 EPD PCD Mode PICC Mode RF Off RF On PICC t PICC present Cmd Resp

Scenarios  Scenario 3: EPD and PCD Set datePage 8 t tPICC1tPICC2 EPD PCD Mode PICC Mode RF Off RF On PCD t RF Off RF On Resp Cmd A

Scenarios  Scenario 4: EPD and EPD Set datePage 9 t tPICC1 EPD 1 PCD Mode PICC Mode RF Off RF On t RF Off RF On Cmd EPD 2 PCD Mode PICC Mode tPICC1 A B Cmd Resp A tPICC2

Conclusion  Market needs increasingly require that both PCD and PICC Modes should be supported in one device.  in particular in the eID, financial and transport sectors  Actual status of ISO/IEC & Amendments reflect a maximum of quality, functionality and applicability:  All parts of ISO/IEC & have been revised.  Amendments (soon published) for: Antenna Classes, EMD, Parameter Exchange, Very High Bit Rates.  Time has come to make available the much attractive interface to those devices which determine our daily life at a high degree, i.e. mobile phones.  Only minor adoptions in ISO/IEC are required to achieve that aim by the presented few further definitions proposed in the Working Draft (TF2 N 704 = WG8 N 1835), which lead to a new device category: the Extended Proximity Device (EPD) Page 10