MUSE: Challenges to Integrate the Multi-Disciplinary Field of BB Access in One Project ECOC 2006 Cannes, 24-28.09.2006.

Slides:



Advertisements
Similar presentations
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Advertisements

Session 4a, 6 May 2009 IST-Africa 2009 Copyright 2009 Digital World Forum Digital World Forum: Low-cost Technologies against the Digital Divide Stéphane.
Introduction to the MUSE FMC architecture
Enabling Services in Broadband Access ECOC 2007 Berlin,
Fibre Access in MUSE: An E2E Approach to Achieve BB for All ECOC 2004, Stockholm.
Dr. Chantal Lacroix PROGRAMME MANAGER DEPUTY HEAD OF MISSION
CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Service QoE Monitoring in the Access Network Bart De Vleeschauwer Ghent University – IBBT-IMEC Department of Information Technology
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
IST MUSE Project leader: Presenter:
Internet2 End-to-End Performance Initiative 11 January 2001 CSG Meeting.
TRIUMPH Meeting Cork P. Vorreau WP1 Universität Karlsruhe (TH) Institute of High-Frequency and Quantum Electronics.
RIS LAUNCH CONFERENCE Ljublijana, June 6, 2005 Gains of the RIS West Romania Process throughout the IRE Secretariat Support Raluca CIBU-BUZAC Head of International.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
Facilitating Multi Stakeholder Processes and Social Learning Herman Brouwer/ Karèn Verhoosel Centre for Development Innovation MSP Generic Process.
ACTION II AND III ACTION II: EXCHANGING RESEARCH EXPERIENCE AND KNOW-HOW ON EU-TURKEY RELATIONS Activity 1 CES-METU Fellowship Programme  To enable the.
European Network of Excellence in AI Planning From PLANET to PLANET II Susanne Biundo University of Ulm, Germany.
A New Generation of Multi Service Access Networks: Results of MUSE Phase I AccessNets 2006 Athens,
URBACT II Promoting Integrated & Sustainable Urban Development.
Ubiquitous access to a world of BB services
Trends in Multi Service Access NOC 2006 Berlin,
1 ENISA’s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA Cyprus, 28.
Windows 2000 Windows 2000 Project Team Division of Information Technology Mary Dickerson, MCSE, Project Leader University of Houston Windows 2000 University.
COnvergence of fixed and Mobile BrOadband access/aggregation networks Work programme topic: ICT Future Networks Type of project: Large scale integrating.
OASE EU - Concertation and Cluster Meeting Jan “Optical Access Seamless Evolution” OASE Grant agreement no:249025, ICT :The Network of the.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT Information Technology.
1 MultimEDia transport for mobIlE Video AppLications 9 th Concertation Meeting Brussels, 13 th February 2012 MEDIEVAL Consortium.
Project Presentation.
Next Steps in Path Computation Element (PCE) Architectures: From Software Defined Concepts to Standards, Interoperability and Deployment CSA FP7 ICT Call.
A quick introduction… Presentation  An innovation project coordinated by Grand Lyon  With 6 european cities: Lyon, Madrid, Birmingham, Göteborg, Turin,
ITEA Easy Wireless project (EW-VTT) Milla Huusko
One objective, two approaches. Content – comparison of projects Aim of the project Consortium Recruitment of target groups Beneficiaries - course participants.
EIP AHA Reference Sites Meeting Brussels, 26 March 2014 Jerome de Barros Project Officer AAL Association, Central Management Unit
Advanced Next gEneration Mobile Open NEtwork Tridentcom th International Conference on Testbeds and Research Infrastructures for the Development.
Advanced Next gEneration Mobile Open NEtwork Tridentcom th International Conference on Testbeds and Research Infrastructures for the Development.
AIAA New Event Model January Why the New Event Model? Our profession is evolving and AIAA must change with it  More emphasis in the industry.
TeamCluster Project Real time project management solutions Harry Hvostov April 27, 2002.
End-to-end Quality of Service over heterogeneous networks José Enríquez Gabeiras Telefónica I+D.
Frederic Maduraud European Commission DG Information Society OECD Workshop on Broadband Seoul, June 2002 “Exploiting the Broadband.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and liaison with pan-European initiatives Athens,
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Cooperation in field of Civil Protection. Europe Everyday We have experienced the need to enhance the presence of Europe in the daily performance of activities.
Demonstrators and Pan-European Services Laboratory WP5 session.
WP0 session Management and External Relations. Código 00/00 2 Index Overview A1: Project co-ordination A2: Dissemination and Exploitation Plans A3: External.
ITU-T Workshop April 2001 : IP Networking and MEDIACOM 2004 Telscom / HKP ngni-itu-april01.ppt to facilitate Global, Strategic and Innovative Next Generation.
FIA Standardisation Working Group Alain-G. Vouffo Feudjio Fraunhofer FOKUS
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
End-User Development Empowering people to flexibly employ advanced information and communication technology September 2002 Pisa (I)
NCP Info DAY, Brussels, 23 June 2010 NCP Information Day: ICT WP Call 7 - Objective 1.3 Internet-connected Objects Alain Jaume, Deputy Head of Unit.
France Telecom Group & PF7 OCEAN consortium confidential European Project FP7 OCEAN OCEA N European Project FP7 OCEAN Open ContEnt Aware Networks 5th FP7.
ERASMUS+ EMREX – Field trial on the impact of enabling easy mobility on recognition of external studies Title and date.
THE FUTURE INTERNET PPP User-driven Innovation Future Internet Conference October 24, 2011 Nuria de Lama Representative of Atos Research & Innovation.
H2020 ICT WP ICT 17 Cracking the language barrier Aleksandra Wesolowska Unit G.3 - Data Value Chain H2020-LEIT-ICT WP pending Commission.
1/21 EUROGI Extra Members’ Meeting Lisbon (PT), Workshop : “The future of the Data-Economy: Business strategies and models for spatial data.”
DISSEMINATION MEETING HEAT4U PROJECT Gas Absorption Heat Pump solution for existing residential buildings Luigi Tischer, Project Coordinator HEAT4U PROJECT.
1 June 9 th, WARD ICT Mobile Summit W D 4 WP1 - BIRD Business Innovation, Regulation and Dissemination Luis M. Correia, IST-TUL, PT Klaus.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
EUB Brazil: IoT Pilots HORIZON 2020 WP EUB Brazil: IoT Pilots DG CONNECT European Commission.
Ellinogermaniki Agogi Research and Development Department DigiSkills Network DigiSkills: Network for the enhancement of Digital competence skills.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
DIVERSIFOOD presentation Chable V., Dibari B., Bonelli B., Rey F.
PSCE Conference Athens 23th November 2016
About OI-Net.
CEPMC Executive Board and General Assembly EC standardisation package
Monitoring and Measurement Cluster
CIPSEC architecture CIPSEC workshop Frankfurt 16/10/2018
e-Invoicing – e-Ordering 20/11/2008
Presentation transcript:

MUSE: Challenges to Integrate the Multi-Disciplinary Field of BB Access in One Project ECOC 2006 Cannes,

ECOC 2006 — 2 Outline  Introduction to MUSE  Project organisation  Standardisation  Dissemination  Some lessons learned  Summary

ECOC 2006 — 3 MUSE Overall Objective Multi service access network that provides  secure connectivity between end-user terminals and edge  in a multi-provider environment  at a low cost for every European citizen. Multi service access network that provides  secure connectivity between end-user terminals and edge  in a multi-provider environment  at a low cost for every European citizen. Customer Premises Network Service Provider Internet Service Provider Application Service Provider Network Access Provider Access Node Residential Gateway Edge Node Aggregation network First Mile

ECOC 2006 — 4 Partners System vendors SME Aarhus BB society Operators Research Inst. & Universities IBBT Inria TU Eindhoven Budapest University (BUTE) ICCS/NTUA HHI Lund Institute of Technology (LTH) ACREO Univ. Carlos III de Madrid University of Essex Component vendors Phase I: Phase II: partners -100 PY/year (*) (**) (*) Only in phase I (**) Only in phase II

ECOC 2006 — 5 MUSE by numbers 50Sessions at consortium meeting 900Addressees of public newsletter >80Individual standards contributions >40Co-signed standards contributions >100Number of publications 64Deliverable documents 49Milestones 120 Attendees per consortium meeting 300People involved 34 M€Budget

ECOC 2006 — 6 TF4 Lab trials TF1 Access architecture & platforms TF3 Residential Gateways TF2 First mile solutions SP B MMBB SP C FMC SP D Distributed nodes WP B1WP C1WP D1 WP B2 WP C2 (DSL) WP D2 WP B3WP C3WP D3 WP B4WP C4WP D4 WP A.3 Techno-Economics WP A.4 Standardisation SP A Technical Steering and Consensus Project organisation Consensus Standards contributions Exchange of info in same area Proto and trial of E2E deployment scenarios SP E Node consolid. WP E1 WP E2 (Optical) WP E3 WP E4

ECOC 2006 — 7 Quarterly consortium meetings SP and TF meetings collocated 120 Attendees Plenary + up to 8 parallel sessions

ECOC 2006 — 8 Project website Project document repository SP confidential FTP servers Project internal website as main communication tool Who-is-who Mail exploders Discussion forum Conf. call calendar Events …

ECOC 2006 — 9 Standardisation  Why in an integrated project ? Project objective: Interoperability, economies of scale Feedback to research (realism) Motivation to aim at consensus with real company positions  Focus on selected bodies with sufficient critical mass IP should not create a new forum that competes with existing initiatives  Co-signed contributions

ECOC 2006 — 10 Dissemination  MUSE public website:  Public Newsletter  MUSE Summer School  Papers in journals, conferences, workshops  Public demos Summer School – Autumn School IP has sufficient critical mass for effective dissimination Focus on a few existing events

ECOC 2006 — 11 Some lessons learned  Each partner should choose priority and focus resources Scope of IP is broad - every partner wants to be involved everywhere Total budget is large, but resources per partner are limited Minimum resources and justification per deliverable/per partner  Decisions Aim at consensus Proceed with majority if not possible  SP Confidential Deliverables Stimulate innovation among competitors IP Consortium Agreement stipulates access rights to IPR Public version (e.g. requirements, performance results)  Quality process Independent internal review of deliverables Assessment of partners with corrective actions in budget

ECOC 2006 — 12 Summary  Pros of integrated project Suited for research in multi-disciplinary field Suited for consensus and pre-standardisation work Good for consensus building, standardisation inputs Good network and exchange of info among research in same field Flexible adaptation of activities in fast changing environment within frame of objectives Powerful for dissemination  Cons of integrated project Overhead for management (but 100% funded) Overhead for all partners to stay up to date with all information Slow consensus and decisions Presence of competitors (but reasonably solved in Subprojects)

ECOC 2006 — 13 Muse confidential Thank you for your attention