The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries National Water Quality Monitoring Council October 31, 2006.

Slides:



Advertisements
Similar presentations
National Environmental Status and Trends (NEST) Indicator Project Region 3 State Meeting May 12, 2009.
Advertisements

Water Resources Monitoring Strategy for Wisconsin: Building on Experience Mike Staggs, WDNR Bureau of Fisheries Management and Habitat Protection Acknowledgements:
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
EISWG The Environmental Information Services Working Group of the NOAA Science Advisory Board Raymond J. Ban April 22, 2009.
1 The Sustainable Water Resources Roundtable April 26, 2006 Needs for Indicators.
Projects to Help Implement The Monitoring Council’s Framework March 26, 2003.
Contacts Advisory Committee on Water Information Jennifer Gimbel, ACWI Chair Acting Asst. Secretary Water and Science U.S. Department of the Interior.
NOAA Science Advisory Board The U.S. Climate Change Science Program Strategic Plan James R. Mahoney, Ph.D. Assistant Secretary of Commerce for Oceans and.
Status Report Ad Hoc Steering Committee on Ground Water Monitoring Presentation for: Advisory Committee on Water Information October 4, 2006.
Jerry L. Miller, Ph.D. Assistant Director for Ocean Sciences White House Office of Science and Technology Policy MARACOOS Washington, DC
The National Office for Integrated and Sustained Ocean Observing and Prediction Eric J. Lindstrom, Director, Ocean.US Worth D. Nowlin, Jr, U.S. GOOS Steering.
Advisory Committee on Water Information 2005 Interim Status September 14, 2005 USGS National Center Auditorium.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
U.S. Department of the Interior U.S. Geological Survey NWIS, STORET, and XML National Water Quality Monitoring Council August 20, 2003.
NFHP Science and Data Committee Report Gary E. Whelan and Andrea C. Ostroff NFHP Science and Data Committee Co-Chairs November 2014.
+ 3D Elevation Program May 8, 2013 The National Map.
Public Participation and the Advisory Committee Process A Collaborative Partnership For Water Resources Toni M. Johnson, Chief Water Information Coordination.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
19-Aug-2003MWMC presentation to NWQMC1 Our vision for monitoring in Maryland … The MWMC envisions a time when monitoring methods, programs, projects, and.
Gulf of Mexico Alliance SIMOR Briefing June 9, 2009.
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
U.S. Department of the Interior U.S. Geological Survey NWIS, STORET, and XML Advisory Committee on Water Information September 10, 2003 Kenneth J. Lanfear,
The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries Presentation for _______ August 28, 2007.
Support of the Framework for Monitoring Office of Management and Budget March 26, 2003.
ACWI 2004 ACTION ITEMS. Opening Remarks Lynn Scarlett, Interior’s Asst. for Policy, Management and Budget ! ACWI is part of a larger spectrum of conversation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Overview of National Monitoring Network (NMN) Project Update for NWQMC April 12, 2005.
Zdenka Willis Briefing to GCOOS March 4, 2010 US IOOS Update.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
Water Quality Exchange (WQX) Pilot and its Potential Role in NWIS/STORET Coordination October 18, 2005.
Developing Proposals for a System of Indicators on the Nation’s Environment (the SINE) H. Theodore Heintz, Jr. Indicator Coordinator White House Council.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
U.S. Department of the Interior U.S. Geological Survey The Rivers Component of the National Monitoring Network Jerad Bales National Monitoring Conference.
The State Climatologist Program and a National Climate Services Initiative Mark A. Shafer Oklahoma Climatological Survey University of Oklahoma.
National Water Quality Monitoring Network for U.S. Coastal Waters and Their Tributaries Briefing For IOOS EXCOM September 13, 2005.
The Integrated Coastal and Oceans Observation System Act of 2009: Implementation 2009 IOOS Regional Coordination Workshop Thursday, August 27.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
NOAA: Managing Our Nation's Fisheries 1 1 Managing Our Nation’s Fisheries II Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary.
State Perspectives on Coastal and Ocean Management A Review of A Review of Coastal States Organization’s Recommendations to the US Commission on Ocean.
WA Task Report Prepared by Rick Lawford May 29, 2008.
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
Why We Are Here Eric Lindstrom, Co-chair Interagency Ocean Observation Committee Great Lakes Industry Workshop June 21, 2011.
Integrated Ocean Observing System (IOOS) Update
The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributary Rivers
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Uncertainty in Atmospheric Transport and Diffusion (ATD) Models Setting the.
NATIONAL ACTION PLAN: Priorities for Managing Freshwater Resources in a Changing Climate June
October 11, 2006 Ellen McCarron & Steve Wolfe Office of Coastal and Aquatic Managed Areas Florida Department of Environmental Protection May 2006 Developent.
A Collaborative Approach to Assessing Watershed Conditions in Coastal National Parks Kristen Keteles, Cliff McCreedy, Jim Tilmant and Mark Flora.
Earth Observation Summit 2003 NOAA Science Advisory Board Gregory W. Withee Assistant Administrator for Satellite and Information Services March 18, 2003.
U.S. Department of the Interior U.S. Geological Survey MACOORA 4 th Annual Meeting Understanding the Coastal Ocean: Partnerships for a Changing World--
NOAA Climate Program Office Richard D. Rosen Senior Advisor for Climate Research CICS Science Meeting College Park, MD September 9, 2010.
Contacts Advisory Committee on Water Information Anne Castle, ACWI Chair Asst. Secretary Water and Science U.S. Department of the Interior William H.
North Atlantic LCC Science Needs and Projects Background Vision and Mission 2010 Projects (review, status, next steps) 2011 Science Needs Assessment, Workshop.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
2009 IOOS Regional Coordination Workshop Thursday, August 27
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Associate Director for Research, Education and Marine Operations
Review of Chair Priorities
SIT Chair Priorities and SIT-33 Objectives
Charting the Course for Ocean Science in the United States:
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Presentation transcript:

The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries National Water Quality Monitoring Council October 31, 2006

Charge from Council on Environmental Quality (CEQ) and National Science and Technology Council (NSTC) in February, 2005 Design report presented to ACWI in January, 2006 ACWI requested two new recommendations – Small Interagency staff to coordinate next steps – One or more pilot studies to test concepts and further develop design ACWI formally accepted report in April, 2006 History

Council on Environmental Quality (CEQ) National Science and Technology Council (NSTC) – SWAQ (Subcommittee on Water Availability and Quality) – JSOST (Joint Subcommittee on Ocean Science and Technology) Subcommittee on Integrated Management of Ocean Resources (SIMOR) Network Presentations

GEO (U.S. Group on Earth Observations) ORRAP (Ocean Research and Resources Advisory Panel) ICOSRMI (Interagency Committee on Ocean Science and Resource Management Integration) Federal Agencies (EPA, NOAA, USGS, DOI) Network Presentations

National Water Quality Monitoring Conference – May 8-11, 2006 – Approximately 900 attendees from Federal and State agencies, Tribes, academia, private sector, volunteer monitoring community – Plenary presentations – 4 special sessions with open dialogue Network Presentations

Appoint Interagency Coordination Staff – OSTP, EPA, NOAA, and USGS Draft tasking statement – Describe context for pilots and how they will be selected – Describe how pilots and subsequent demonstrations serve as template – Coordinate preparation of technical specifications for some elements of Network design Current Interagency Coordination

A Review of the Design Features Clearly defined objectives that address management needs Linkage with IOOS Flexibility over time Includes – metadata, – quality assurance, and – data management system that provides accessible data Coordinated monitoring of resources in upland, coastal, and ocean areas

Structure of the Design Nine resource compartments Fixed station and probabilistic designs Core variables and sampling frequencies specified Provisions for data comparability, management & access A continuum of Observations Estuaries Nearshore Offshore and EEZ Great Lakes Coastal Beaches (BEACH Act) Wetlands With Flow and Flux from Rivers Atmosphere Groundwater

The Design Will Not: Provide data on all water resources  Small rivers  Lakes and Reservoirs  Local aquifers Replace State Clean Water Act use attainment monitoring  305 (b)  303 (d) Deal with compliance monitoring

Phase 1: Network design (completed) Phase 2: Develop and carry out pilot studies Underway to choose pilots & estimate costs Confirm acceptance in January, 2007 Then complete by January, 2008 Phase 3: Demonstration projects Phase 4: Nation-wide implementation Network Implementation: Overall Process

Pilot studies – Phase 2 – Conduct inventory of on-going monitoring – Specify all the needed monitoring – Compare to design and identify gaps – Undertake With existing resources During calendar year 2007 Demonstration projects – Phase 3 – New instrumentation and field work to fill gaps – New resources required – Calendar year 2008 and beyond Pilot studies & Demonstration projects

Two or more pilots to bracket implementation challenges [data rich and data poor, for example] Criteria to be developed by early November 2006 – Physical setting: upland, estuary, offshore – Partnerships in study areas very important – Coordinate with IOOS – Partners willingness to work within existing resources Pilot studies

Core variables to be monitored – Likely similar to the IOOS list Variables that have known methods and performance Includes other measures that are less certain Specific locations to be monitored in each resource component Specific organizations identified to conduct monitoring Specifications Expected From The Pilots

Announce our plans & timing to potential regional partners Select partners and confirm project timing, costs Seek ACWI and ICOSRMI approval of the plan in January, 2007 During Pilots, Interagency working group will – Coordinate its work with ACWI and its subgroups – Report every 4 months to JSOST, SIMOR, and SWAQ Present report with results of pilot studies in January 2008 Next Steps