Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

PoA Challenges & Opportunities
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Method of Evaluating Afforestation/Reforestation CDM Project - An Indonesia Case Study - Sumitomo Forestry Co., Ltd., Tokyo, Japan June 5, 2003 Bonn.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
World Bank/KenGen Workshop on CDM Project Methodologies and Preparation October 3 & 4, 2006 CDM Contracting and Legal Issues.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August 2011.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
National Inventory System in Finland Workshop on QC and QA of GHG Inventories and the Establishment of National Inventory Systems 2-3 September 2004, Copenhagen.
An introduction to the monitoring of forestry carbon sequestration projects Developing Forestry and Bioenergy Projects within CDM Ecuador March, 2004 Igino.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Calibration regarding project assessment requirements - RIT Perspectives Vinay Deodhar, RIT Module th JCW Bonn, March 2011.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP Volume I General Guidance and Reporting Bonn, 18 may 2006.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
LULUCF Issues Kyoto Protocol & Bonn Agreement Article 3.3: Afforestation, reforestation & deforestation Article 3.4: Cropland management, grassland management,
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Programmatic CDM: Eligibility, Methodological Requirements and Implementation Development Dividend Side Event December 5, 2005 Christiana Figueres Team.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
LULUCF CDM small-scale projects -Small-scale energy projects -Current draft text in SBSTA/2003/L.13 -Simplified procedures for energy projects -Potential.
TÜV SÜD Industrie Service GmbH SEVENTH CDM JOINT COORDINATION WORKSHOP PLENARY SESSION SESSION III Transparency and Promotion of the CDM Thomas Kleiser.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
TÜV SÜD Group Carbon Management Service Methodology and Project Development – Notions of a DOE Methodology and Project Development – Notions of a DOE PCF.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Some observations from chilean experience that could affect CDM methodologies by Alfonso Olea (TÜV- SÜD external auditor) APLE Consultores Chile.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
The system PROBLEM 1 FEIO Poor loading Insufficient number of facilities Small number of parameters Unaccountable methodology for taxes calculation Poor.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Conservativeness in baselines WB workshop for CDM project developers Buenos Aires, 5 December 2004 Lambert Schneider.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Status of accreditation of Independent entities O. Pluzhnikov JISC member Chair of Accreditation Panel.
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Clean Development Mechanism
Validation of Forest-based Carbon Projects
ARNM0002 REFORESTATION OF GRASSLANDS WITH NATIVE SPECIES
Determination / Verification under JI - Challenges and Pitfalls
Japan’s Financial Schemes for Promoting CDM Projects
DEVELOPMENT OF MRV-SYSTEM & REL/RL IN TANZANIA
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
CDM Activity Cycle under the Marrakech Accords
Work Accomplished by JISC
Presentation transcript:

Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification of LULUCF Projects 25 August 2009

TÜV SÜD Industrie Service GmbH  Department in the TÜV SÜD Industry Service  50 Professionals HQ (Munich)  Worldwide >100 Auditors  Active in CDM Projects (all 15 scopes), Renewable Energy and GHG Inventory Carbon Management Service TÜV SÜD

TÜV SÜD Industrie Service GmbH “Verification is the periodic independent review and ex-post determination by the designated operational entity of the monitored reductions… during the verification period. Certification is the written assurance …” (Marrakech Accords) Verification Pre-condition for issuance of CERs Assessment of conformity with registered monitoring plan and CDM guidelines Shifts liability of issuance for non-valid CERs to the operational entity

TÜV SÜD Industrie Service GmbH Difference to other CDM projects: Late start of projects lead to late start of verification Long verification cycle Limited experience in verification Basis of verification is forest inventory Experience in AR-Verification

TÜV SÜD Industrie Service GmbH Six Reasons for Verification Headaches Verification

TÜV SÜD Industrie Service GmbH DATA MANAGEMENT: Long list of monitoring parameters (old methodologies) Parameters defined in Monitoring Plan are not monitored Lack of consistency during the entire reporting period POTENTIAL SOLUTION: Initial verification Definition of procedures (SOPs) in Monitoring Plan Reason #6 for Verification Headaches

TÜV SÜD Industrie Service GmbH Reason #5 for Verification Headaches QUALITY MANAGEMENT: Lack of a quality assurance and quality control system Lack of understanding in project team of what is required for CDM SOLUTION: Implementation of QA/QC and quality management systems Clear definition of roles and responsibilities

TÜV SÜD Industrie Service GmbH Reason #4 for Verification Headaches UNCERTAINTY, ACCURACY & PRECISION: Precision can only be determined ex-post, after sampling Unclear guidelines in many meths on how to deal with uncertainty and accuracy SOLUTION: If high variance either more samples or conservative estimate for the mean carbon stock in the area / stratum Improved guidelines on uncertainty and accuracy

TÜV SÜD Industrie Service GmbH Reason #3 for Verification Headaches UNDERDELIVERY OF ESTIMATED AMOUNTS: Too optimistic growth models Calamities / mortality Less reforested area than originally planned SOLUTION: Be conservative Site classification important Use of actual country-specific or project-specific values rather than default values

TÜV SÜD Industrie Service GmbH Reason #2 for Verification Headaches PROJECTS NOT IMPLEMENTED AS PLANNED: Different species composition Time delays (Validated-related problem, poor validation) SOLUTION: Initial verification Clearer guidelines from EB on how to deal with such issues More careful preparation of the Monitoring Plan in the PDD

TÜV SÜD Industrie Service GmbH Reason #1 for Verification Headaches

Thank you for your attention Sebastian Hetsch TÜV SÜD - Carbon Management Service