A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency.

Slides:



Advertisements
Similar presentations
Solar Energy Overview Overview of the technology, benefits, as well as technical and financial project considerations for photovoltaic systems. Prepared.
Advertisements

PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
DNV GL © SAFER, SMARTER, GREENER DNV GL © Second Annual Utility of the Future Pulse Survey Key Findings 1 July 15, 2015 Presentation to C/CAG RMCP.
Powering forward. Together. Pathways to ZNE: SMUD Perspectives, Grid Impacts, Shared Solar Obadiah Bartholomy Rebecca Rundle Stephen Frantz Presented at.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
RMS Update December 14,  Advanced Meter Settlement Impacts  January 2012 – ERCOT settling 4.4M ESIIDs using Advanced Meter data  January 2012–
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
CCET as a Forum to Help Resolve Interoperability Issues Grid-Interop Stakeholders Coordination Panel Nov 11-13, 2008 Atlanta, GA Milton Holloway, Ph.D.
Grid-based Technology and Business Model Innovation: DG, DR, and EE How will Disruptive Challenges in Electric Markets Impact Michigan’s Energy Decisions?
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Retail Market Subcommittee (RMS) Update Kathy Scott January 3, 2013Technical Advisory Committee 1.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
An Approach to Adjust ERCOT’s Long-Term Load Forecast for Utility Energy Efficiency Programs Jay Zarnikau Frontier Associates LLC June 10, 2013.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
9/12/20071 CCET at Two Years Presentation to Demand Side Working Group Meeting of ERCOT Austin, Texas October 12, 2007 Jay Zarnikau Frontier Associates.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
Distributed Generation Task Force November 29, 2007 TAC Report.
Emerging Technologies Integration in ERCOT 2012 ERCOT Operations Seminar Mark Bruce Principal Stratus Energy Group.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
Should CDR or SARA be Adjusted to Better Account for EE, DR and DG? Cyrus Reed DSWG September 21, 2012.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
Texas Competitive Market & Governance October 4, 2015.
File: ERCOT DREAM TF Slide 1 DREAM TF Distribution Energy Market IDEAS_distribution_energy_market_draft1 IDEAS_distribution_energy_market_draft1.
1 Modeling Distributed Generation Adoption using Electric Rate Feedback Loops USAEE Austin, TX – November 2012 Mark Chew, Matt Heling, Colin Kerrigan,
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
AEP ONCOR TNMP TDSP AMS Data Practices Summary TDSP_AMS Data Practices Summary.ppt CenterPoint.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Hypothetical Examples of How Residential Photovoltaic (PV) ESI IDs Could be Settled ERCOT Load Profiling.
The Power of a mature and smart technology The power of a mature and smart technology of Austin Solar Power has a great efficiency. The result shows that.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Issues to Consider regarding Distributed Solar Dave Renné, Senior Consultant Clean Power Research Introduction to Forecasting of Variable Renewable Energy.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
Sun City U.S.A "New Day in the Sun". Peak Electric Demand Growing.
1 TX SET Update to RMS March 14, Drop to AREP Changes PUCT Project oOne of TX SET 2007 goal is to evaluate approved Rulemakings and determine.
MARS Taskforce RMS Update October 13, 2010.
Interconnecting Wind & Solar Energy in Texas
ERCOT MARKET EDUCATION
Distributed Generation Task Force
Hurricane Rita.
Presentation transcript:

A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency & Renewables January 22, 2015 FRONTIER ASSOCIATES LLC

Background 2 Modeling distributed PV is challenging because we do not presently have a database with the locations and characteristics of all the systems scattered within the ERCOT region. There is presently an estimated 39.5 MW of distributed PV capacity at residential sites and 35.1 MW at commercial premises in Texas (US Solar Market Insight Report, Q3 2014). A clearer understanding of the geographical location and expected performance is important for congestion management and dispatch decisions. Further, an understanding of where concentrations of PV systems are likely to arise in the future would be valuable to distribution system planners.

Frontier Associates 3 Within ERCOT, we currently manage PV incentive programs for AEP-TCC, AEP- TNC, and Sharyland Utilities. In the past, we administered PV incentive programs for Oncor and TNMP. Outside of ERCOT, we currently administer a PV incentive program for El Paso Electric, and have done so for Entergy and SWEPCO in the past as well.

Our Program Databases 4 Frontier’s databases cover about 18 MW of residential and commercial PV installations. For each PV system installed through these programs, Frontier has detailed data on: The location and ESI IDs Customer class Tilt and orientation of the solar array Number and type of panels and inverters installed Estimated annual production Type of installation (pole, rooftop, etc.) Level of shading We presume that Oncor continues to collect similar information. Frontier Associates operates Austin Energy’s program databases, so we have similar data for PV projects that received an incentive through Austin’s large program.

Our Program Databases: An Important Caveat 5 None of the data we collect and maintain can be used without permission from our clients. But, it may be possible to obtain such permission, if the correct safeguards are put in place.

Additional Sources of Data 6 ERCOT collects information pertaining to which premises or ESI IDs in areas opened to retail competition have PV systems behind the meter. This information is used to assign customers to a PV profile code. (See Sec of the ERCOT Protocols.) And, then there are the TDU Interconnection Agreements and DG interconnection reports provided to the PUCT. It is our understanding that CPS Energy in San Antonio collects project data similar to that collected by Frontier Associates. Also, SECO has a public database which covers approximately 10 MW of public installations completed with ARRA funding in The technical data available from utility programs could be combined with GIS data pertaining to tree cover and other site-specific attributes to refine the modeling of systems.

How Might This Data Be Used to Develop Short-Term PV Generation Forecasts? 7 Someone needs to put all the data from these various sources together – which is a significant task. The solar generation forecasting model that ERCOT has already acquired to project generation output from large-scale solar systems could also be used to simulate PV generation for sets of distributed PV systems or representative systems. The electrical generation from a sample of the systems or aggregated sets of systems could be simulated. If distribution utilities are willing to assist with the assignment of PV systems to transmission nodes or distribution substations, then the geographical distribution could be used to project PV generation by node. Alternatively, the distributed PV systems could be assigned to the TLAPs (Texas load aggregation pockets) defined by ERCOT.

Model Calibration 8 For a given PV system, actual generation may deviate from model-predicted values, due to tree cover, the actual condition of the panels, and other factors. The results from the model acquired by ERCOT could be calibrated against actual metered PV output, as collected by many of the TDUs and Austin Energy. Alternatively, models could be calibrated against the “dip” in grid-purchases apparent in the AMI data collected by ERCOT and stored in Smart Meter Texas (SMT) that was estimated to be attributable to PV generation.

Long-Term Forecasting 9 Long-term forecasts of PV installations and generation are available from a variety of existing sources. Future distributed solar investments are affected by the cost of PV relative to grid-power, the availability of tax credits and other incentives, and the impacts of efforts to reduce greenhouse gas emissions. Dr. Varun Rai at UT-Austin could contribute a long-term forecast of PV technology dissemination.

Est Austin, Texas 10 Enhancing value at the utility-customer nexus Questions?