Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.

Slides:



Advertisements
Similar presentations
The Design and Problem Solving Process. What is the point? A proven method and process Can be utilized for any problem Helps you to produce quality work.
Advertisements

K-6 Science and Technology Consistent teaching – Assessing K-6 Science and Technology © 2006 Curriculum K-12 Directorate, NSW Department of Education and.
The Design Process Steps in the Design Process The following slides outline stages and associated activities of the design process.
Department AFRICA HIV Network Meeting, Nairobi A. Köneke 8 June 2010 HIV/AIDS Mainstreaming in the Africa Department of GTZ.
Training Needs Analysis. Ambition in Action TAFE NSW: Doing business in the 21 st Century The TAFE NSW Workforce Development Guarantee.
§ (a) and (b) Teacher or Principal Improvement Plans.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
1 SESSION 3 FORMAL ASSESSMENT TASKS CAT and IT FORMS OF ASSESSMENT.
PPA 502 – Program Evaluation
IMS1805 Systems Analysis Topic 6: Analysis as a process within a process.
Process and Report Guidelines Concordia University Wisconsin Spring 2008.
Curriculum and Assessment Changes Autumn Curriculum changes September 2014, New National Curriculum to be implemented in primary schools. [ a slight.
Personal Project: Assessment Criteria
Nursing professional standards Prepared by: Dr. Rawhia Dogham.
Database System Development Lifecycle Transparencies
Unit Assessment: Advanced Higher Investigative Biology.
Instructional Design Aeman Alabuod. Instructional Design instructional Design (also called Instructional Systems Design (ISD)) is the practice of creating.
“Walking Through the Steps and Standards” Presented by: Tom Chapel Focus On…
Chapter : Software Process
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
How to develop research skills in students. The model of searching information. Carol Collier Kuhlthau How to develop research skills in students. The.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
The Audit Process Tahera Chaudry March Clinical audit A quality improvement process that seeks to improve patient care and outcomes through systematic.
Needs Assessment LIBM Needs Assessment  Consider this definition from Wikipedia:  “A needs assessment is a systematic process for determining.
Unit 5 – eProject – Project Organisation Procedures Set up and use procedures for storing and protecting project information, tracking and monitoring progress.
Alliance 4 Useful Evidence Webinar, 1 September 2015.
Experimental Research Methods in Language Learning Chapter 16 Experimental Research Proposals.
Developing the Fine Particulate Matter Response. Developing the Response – Air Physical System.
Slide 1 Student Presentation Software Engineering Seminar Your Name Supervisors Name SS 2015 Insert your topic name here.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
1 Session C: Evaluation James Farnham 3 June 2009.
Measure current performance. Analyze the current performance. Improve performance. I Define the problem to be solved.
 Read through problems  Identify problems you think your team has the capacity and interest to solve  Prioritize the problems and indicate the.
Methodological Lessons Joint Evaluation of Conflict Prevention and Peace-Building in DRC, Day 2, Presentation in Oslo ‘What Have We learnt From.
S15: Supervision and review. Objective of supervision and review  To ensure that the audit is done efficiently and effectively so that the audit opinion.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Internal Fundamentals of Performance Measurement Dr. Mohammed Alahmed Dr. Mohammed Alahmed 1.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
1 Results-based Monitoring, Training Workshop, Windhoek, Results-based Monitoring Purpose and tasks Steps 1 to 5 of establishing a RbM.
Define Research Problem. 2 Management objectives: –To solve current problem facing company –To improve efficiency –To plan for future Current problems.
Assessment Design and its relationship to NARS and ILOs Arthur Brown Advisor to the Quality Assurance and Accreditation Project Republic of Egypt.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Lecture Notes - Richard Ssembatya1 Information System Project Management Lecture Five By Richard Ssembatya MSc. Cs, BSc CS, CCNA, IT Essentials, ICDL Institute.
Copyright © 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 1 Research: An Overview.
Assessment without levels. Why remove levels?  levels were used as thresholds and teaching became focused on getting pupils across the next threshold.
THE FINAL MAJOR PROJECT. ASSESSMENT CRITERIA 1. Understand the requirements of an art and design project 1.1 Analyse the requirements and parameters of.
2015/16 Staff Performance Appraisals Webinar for ANR Supervisors Spring 2016.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
EPQ Production Log Jan Overview of Project Qualifications Learners are required, with appropriate supervision, to: Choose an area of interest Draft.
Assessment of EPQ What is assessed? AO1 Managing the project AO2 Use resources Where’s the evidence? Production log – aims of project, detailed project.
PACFaH M&E TOOLS AND REPORTNG TIMELINES Jayne Arinze-Egemonye.
Rebecca McQuaid Evaluation 101 …a focus on Programs Rebecca McQuaid
Unit 6 Application Design Sample Assignment.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Literature review Methods
Evaluating your Repository
BUMP IT UP STRATEGY in NSW Public Schools
HR0277 Change, Work and Diversity
IT Systems Analysis & Design
10 Stages Of the Engineering Design Process
PPMP20008 Lessons Learnt Presentation
Unit 09 – LO3 - Be able to Implement and Test Products
Evidence for Welfare Practice
Command terms with definitions.
EPQ Learner Outcomes identify, design, plan and complete an individual project, applying a range of organisational skills and strategies to meet.
(System Development Life Cycle)
Overview Three assessments/tests are hosted in SDS Qualtrics survey software Students and mentors can click on the links below to access them Students.
AICT5 – eProject Project Planning for ICT
Performance Assurance Framework (‘PAF’):
Presentation transcript:

Project Stages

Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion

Planning It is important to be clear on the project objectives at the outset and to produce an outline plan for the achievement of the objectives as soon as possible, to provide a framework for the other activities listed below and to act as a starting point for the planning process throughout the project.

Initial Data Collection Initial data collection, regardless of the topic, is an activity addressed to the acquisition of understanding: of the environment in which the project is to be undertaken; of the tools that may or will be used; of the problems likely to be encountered; of the initial feasibility of the objective(s) set for the project.

Situation Evaluation An evaluation of the situation is acquired by analysing the initial data collected and should lead to a better definition of the problem and provide the project with a clearer sense of direction. It will focus attention on the detailed data collection requirements

Solution Definition Depending on the type of project the solution may be defined in terms of a requirements specification (for a feasibility study); of a systems specification (for a systems development project); of an evaluation structure (for a study of a software package or packages).

Implementation of Solution Implementing the solution will range from the development of the requirements specification and the completion of the feasibility study to the specifying, writing, testing, installing and documenting the specified system through to the carrying through and writing up of the package evaluation or comparative study.

Conclusion An assessment towards the end of the project (and prior to the final drafting of the project report) should result in two conclusions (or sets of conclusions), one on the product ie. what the project achieved against the objective(s) set at the start of the project, and a second on the process ie. how the outcome of the project was achieved with an indication of the lessons to be learned from success or failure (as measured by achievement against objectives).

(The balance in terms of time and importance of the activities outlined above is a matter for discussion between student and supervisor. However, the project report needs to provide evidence of the attention paid to all six sets of activities.)