for Traffic Forecast Analysis, London | 22.04.2008 TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 1 | 29 Transportes, Inovação e Sistemas,

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. A PowerPoint Presentation Package to Accompany Applied Statistics.
Advertisements

Chapter 18 If mathematical analysis is too difficult, we can try each possibility out on paper. That way we can find which alternative appears to work.
Chapter 1 Introduction to Modeling DECISION MODELING WITH MICROSOFT EXCEL Copyright 2001 Prentice Hall.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
6 - 1 Lecture 4 Analysis Using Spreadsheets. Five Categories of Spreadsheet Analysis Base-case analysis What-if analysis Breakeven analysis Optimization.
Chapter 1 DECISION MODELING OVERVIEW. MGS 3100 Business Analysis Why is this class worth taking? –Knowledge of business analysis and MS Excel are core.
Chapter 1 Introduction to Modeling DECISION MODELING WITH MICROSOFT EXCEL Copyright 2001 Prentice Hall Publishers and Ardith E. Baker.
Nonlinear Feedback Loops Adding uncertainty to a dynamic model of oil prices William Strauss FutureMetrics, LLC Presented at the Palisade.
Full Monte Cost and Schedule Risk Analysis
Sensitivity and Scenario Analysis
Engineering Economic Analysis Canadian Edition
Dealing With Uncertainty
Simple Linear Regression
TRIP ASSIGNMENT.
Decision and Risk Analysis Financial Modelling & Risk Analysis Kiriakos Vlahos Spring 2000.
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Decision analysis and Risk Management course in Kuopio
13 th TRB Transportation Planning Applications Conference May 11, 2011 Risk Assessment & Sensitivity Analysis of Traffic and Revenue Projections for Toll.
Estimating Risks Associated with Travel Demand Forecasts 14 th TRB Transportation Planning Applications Conference May 2013 Thomas Adler, RSG Michael Doherty,
Ibrahim Almutaz 1, AbdelHamid Ajbar 2, Emad Ali 3 1 Chemical Engineering Dept., King Saud University, Riyadh, Saudi Arabia
WP3 – Alternative Scenarios of Growth Trends in Road Transport (Passenger, Freight) D. Tsamboulas External Consultant.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
Maximizing Business Value Through Projects: Doing less and achieving more! Thomas G. Lechler Stevens Institute of Technology Hoboken NJ.
Forecasting inflation; The Fan Chart CCBS/HKMA May 2004.
Identifying Input Distributions 1. Fit Distribution to Historical Data 2. Forecast Future Performance and Uncertainty ◦ Assume Distribution Shape and Forecast.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
ESTIMATES AND SAMPLE SIZES
Probabilistic Mechanism Analysis. Outline Uncertainty in mechanisms Why consider uncertainty Basics of uncertainty Probabilistic mechanism analysis Examples.
Example 2.5 Decisions Involving the Time Value of Money.
Discrete Distributions The values generated for a random variable must be from a finite distinct set of individual values. For example, based on past observations,
ETC 2009 Gerard de Jong – Significance and ITS Leeds Predicting uncertainty of traffic forecasts: giving the policy-makers a range instead of a single.
Engineering Economic Analysis Canadian Edition
MBA7025_01.ppt/Jan 13, 2015/Page 1 Georgia State University - Confidential MBA 7025 Statistical Business Analysis Introduction - Why Business Analysis.
MGS3100_01.ppt/Aug 25, 2015/Page 1 Georgia State University - Confidential MGS 3100 Business Analysis Introduction - Why Business Analysis Aug 25 and 26,
Outline of Chapter 9: Using Simulation to Solve Decision Problems Real world decisions are often too complex to be analyzed effectively using influence.
MBA7020_01.ppt/June 13, 2005/Page 1 Georgia State University - Confidential MBA 7020 Business Analysis Foundations Introduction - Why Business Analysis.
Copyright  2003 by Dr. Gallimore, Wright State University Department of Biomedical, Industrial Engineering & Human Factors Engineering Human Factors Research.
FIN 614: Financial Management Larry Schrenk, Instructor.
Monte Carlo Process Risk Analysis for Water Resources Planning and Management Institute for Water Resources 2008.
GoldSim Technology Group LLC, 2006 Slide 1 Sensitivity and Uncertainty Analysis and Optimization in GoldSim.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
© English Matthews Brockman Business Planning in Personal Lines using DFA A Talk by Mike Brockman and Karl Murphy 2001 Joint GIRO/CAS Conference.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Monte Carlo Simulation Natalia A. Humphreys April 6, 2012 University of Texas at Dallas.
1 BA 555 Practical Business Analysis Linear Programming (LP) Sensitivity Analysis Simulation Agenda.
Monte-Carlo based Expertise A powerful Tool for System Evaluation & Optimization  Introduction  Features  System Performance.
Incorporating Uncertainties into Economic Forecasts: an Application to Forecasting Economic Activity in Croatia Dario Rukelj Ministry of Finance of the.
Louisiana Department of Transportation and Development Forecasting Construction Cost Index Values Using Auto Regression Modeling Charles Nickel, P.E. Cost.
CHAPTER 3 RISK AND RETURN. ©Correia, Flynn, Uliana & Wormald 2 Learning Objectives By the end of the chapter, you should be able to; n Distinguish between.
Traffic Flow Characteristics. Dr. Attaullah Shah
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
P4 Advanced Investment Appraisal. 2 2 Section C: Advanced Investment Appraisal C1. Discounted cash flow techniques and the use of free cash flows. C2.
Quantify Uncertainty in Travel Forecasts
Supplementary Chapter B Optimization Models with Uncertainty
Chapter 4 PowerPoint Spreadsheet Analysis.
Computer Simulation Henry C. Co Technology and Operations Management,
6. Risk Analysis for the New Venture Using Monte Carlo Simulation
Prepared by Lloyd R. Jaisingh
Uncertainty in transport models
Analysis Using Spreadsheets
Project Feasibility Analysis
Modelling Sustainable Urban Transport
Monte Carlo Simulation Managing uncertainty in complex environments.
CPM, PERT & Schedule Risk Analysis in Construction
Professor S K Dubey,VSM Amity School of Business
Decision and Risk Analysis
Introduction to Crystal Ball (Part I)
Monte Carlo Simulation
Introduction to Decision Sciences
Presentation transcript:

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 1 | 29 Transportes, Inovação e Sistemas, S.A. Av. da Republica, 35, 6º Lisboa | Portugal | for Traffic Forecast Analysis Case Study: Marão Tunnel Concession Palisade User Conference London, 22nd April 2008 Inês Teles Afonso

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 2 | 29 Table of Contents Case Study Presentation Context – What is a traffic study? What are the advantages of Traffic Modelling Model (VISUM) Results Analysis The data presented in this presentation was modified so that we could ensure the privacy of our client

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 3 | 29 Case Study Presentation TUNNEL MARÃO CONCESSION National Politics Strategy Identical opportunities of Development Similar mobility conditions Traffic Forecast in concession sections Main Objective Traffic Study

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 4 | 29 Junction 3 Junction 5 Junction 1 Junction 4 IP4 A24/IP3 A4/IP4 Penaguião Amarante IP4 EN2 EN304 EN313-2 Vila Real EN15 A4/IP4 Carvalhais Campeã Quintã IP4 EN304 EN210 EN15 EN101-5 EN210 EN312 EN101 EN15 MARÃO TUNNEL CONCESSION CONCESSION Junction 2 A4/IP4 Main characteristics: Connection between cities of Amarante and Vila Real length → 30 km Cross-Section → 2x2 Free Flow Speed → 100 km/h Tolled motorway → open scheme with toll charge in road section → Vila Real Case Study Presentation

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 5 | Case Study Presentation Traffic Model was built on the VISUM platform The obtained results allow to predict the traffic demand on the studied sections over the period of analysis Note: These values doesn't correspond to the real project values 3 2 1

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 6 | 29 Context – What is a traffic study? INPUT Transport Demand Characteristics Traffic Study / Traffic Model Traffic Forecasts for the study infra-structure Finance Analysis (...income estimates) Environmental Impact Assessment Project Analysis OUTPUT Transport Supply Characteristics

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 7 | 29 Context – What is a traffic study? INPUT Traffic Study / Traffic Modal OUTPUT ANALYSIS It is a very important issue to know the expected evolution for the traffic (OUTPUT) and what are the associated risks. Usually we reflect the uncertainty of the model results in three scenarios such as “central”, “optimistic” and “pessimistic” allowing for a very limited deterministic analysis. Is it possible to present a clearer and stricter outcome?

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 8 | 29 What are the advantages of YES! the OUTPUT ( traffic forecast) is represented by a probability distribution which improves the quality of decision- making. HOW? With simulation (Monte Carlo simulation). In each tries all valid combinations of the values of INPUT to simulate all possible outcomes (OUTPUT). variable A variable B variable C Traffic Model Relations.. OUTPUT ANALYSIS

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 9 | 29 Traffic Modelling Model (VISUM) 4 minutes for a traffic assignment iterations iterations duration 833 hours! 35 days!!! SOLUTION Draw adjustment curves representing the relationship between OUTPUT (traffic forecast) and INPUT variables - Elasticity Curves PROBLEM Due the complexity of traffic model, it takes some time to get its outcome (traffic forecast). Therefore it is not feasible to do a traffic assignment (VISUM) for iteration.

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 10 | 29 Traffic Modelling Model (VISUM) Variable OUTPUT - AADT.km 2. Traffic Assignments 3. Elasticity curves adjustment 1. Change INPUT values

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 11 | 29 Application 1. OUTPUT Variable definition 2. INPUT Variables INPUT variables definition Definition of the probability distribution for each one Analysis of correlation between them 3. Interaction between INPUT and OUTPUT variables Simulation 5. Results Analysis

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 12 | 29 OUTPUT Variable Definition OUTPUT Variable Traffic Forecast (AADT.km) for Tunnel Section (2011, 2020, 2030, 2040 and Accumulated Revenue)

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 13 | 29 INPUT Variables Definition INPUT Variables GDP Annual Variation Rate (after 2009) Toll value f(VAT) Value of Time (VoT) Variation Rate Fuel Cost Annual Variation Rate GC= l (length).Co (Operational Cost) + t (travel time).VOT + l.T(unit toll) Traffic growth factors Transport Demand Generalized Cost

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 14 | 29 Probability Distribution for INPUT Variables Around each input variable, there was a very deep discussion to decide which probability distribution should the variable assume. This discussion was based mainly on expert judgement.

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 15 | 29 Probability Distribution for INPUT Variables GDP Annual Variation Rate (after 2009) The source for GDP before 2009 was the Bank of Portugal After 2009 it is considered a stochastic variable Normal distribution Mean= 2,3% Standard Deviation = 0,5% To avoid to have negative values of traffic, which is a non sense, the distribution was truncated.

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 16 | 29 Probability Distribution for INPUT Variables Fuel Cost Variation Rate It was considered that the likeliness of fuel prices reaching very high levels in the long or medium term is higher than that of regressing to lower levels Weibull distribution Percentile 5% = 0,8 Percentile 50% = 1 Percentile 95% = 1,5 The modelled variable consists of the Fuel Cost Variation until 2020.

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 17 | 29 Probability Distribution for INPUT Variables Value of Time (VoT) Variation Rate VoT is one of the most decisive parameters for the route choice model; Research on VoT growth over time indicates annual growth Triangular Distribution minimum = 0,3 Most likely = 0,7 Maximum = 1 ranging from 30% to 100% of annual GDP growth rate In the deterministic approach it was used 70%

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 18 | 29 Probability Distribution for INPUT Variables Toll value Toll = € 0,07.(1+VAT).(paid length) The toll value is changed when VAT changes. VAT is the INPUT variable; In 2007 Portuguese VAT was 21%; It is not likely that VAT can increase much more; The probability of simulating a lower VAT than the most likely is higher than getting a higher most likely value Weibull distribution Percentile 5% = 0,18 Percentile 50% = 0,21 Percentile 95% = 0,23

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 19 | 29 Correlation Analysis Between INPUT Variables The correlation matrix was constructed considering the following variable relations: Negative correlation between GDP and VAT, and GDP and Fuel Costs Positive correlation between GDP and VoT Positive correlation between VAT and Fuel Costs

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 20 | 29 Interaction between INPUT and OUTPUT variables GDP Annual Variation Rate and VoT Annual Variation rate have positive elasticity with the traffic forecast, which means that when they increase, the traffic demand on the Tunnel also increases Fuel Cost and Toll Annual Variation Rate have negative elasticity with the traffic forecast. Their growth implies a traffic demand decrease on the Tunnel

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 21 | 29 The data presented in this presentation was modified so that we could ensure the privacy of our client

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 22 | 29 Results Analysis – Output Distributions Graphs Traffic Model

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 23 | 29 Results Analysis – Output Distributions Graphs The red line represents the deterministic output (traffic forecast.km) of the Traffic Model. The deterministic outcome is always on the right side of the mean value of the distribution. This means that traffic study may have assumed optimistic values

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 24 | 29 Results Analysis – Output Distributions Graphs The uncertainty of the model increases with time This evolution is an intuitive perception But the stochastic model allows to see that the uncertainty is bigger for the lower demand values

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 25 | 29 Results Analysis – Tornado Graphs

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 26 | 29 Results Analysis – Tornado Graphs These results shows the importance of the uncertainty of the INPUT variables on uncertainty of output outcome What factors cause higher uncertainty on the traffic forecast? GDP is the INPUT with more influence. Fuel Costs are the second most influential and become more relevant until 2020 where the variable value remains constant

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 27 | 29 What is the possibility of having the revenues 15% less than the deterministic forecast? The model allows to estimate that that outcome can occur with a probability of 13% Results Analysis - Revenues

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 28 | 29Conclusions With Deterministic model: The outcome sensitivity analysis is given by deterministic results by changing the values of the input variables; It is not possible to measure the probability of those results. With stochastic approach The outcome sensitivity analysis is based on a probabilistic distribution; It improves the deterministic analysis answering to the following questions: what are the expected variation for the traffic forecast results? what are the factors that cause higher uncertainty on the traffic forecast? What are the risks of having less revenue than the deterministic forecast? For all of these, the decision (expert and client) can obtain a more transparent and accurate approach of the outcome presented by traffic model analysis software.

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 29 | 29Conclusions The undertaken analysis allow to identify the main RISKS associated with the Concession Traffic Forecast. Usually, on the deterministic model we assume the most likely values for the input variables. results, in this case, allows to observe that the deterministic outcome could have been too optimistic The information supplied analyses allows to add information to the traffic forecast results, improving the interpretations of the results In future analysis we remain with two main challenges: to accurately replicate the relevant relations of the traffic model in Excel (VISUM to improve the methodology for the setting of the probability distributions

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 30 | 29 Results Analysis – Tornado Graphs Thank You

for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 31 | 29 Transportes, Inovação e Sistemas, S.A. Av. da Republica, 35, 6º Lisboa | Portugal | for Traffic Forecast Analysis Case Study: Marão Tunnel Concession Palisade User Conference London, 22nd April 2008 Inês Teles Afonso